RG-MH-69093 · RERA P51700032231 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Oct 2025Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
26 of 36Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 37 documents Report an error

PRISM INDUSTRIAL ESTATE is a Mixed project by SPLENDOR SHELTERS PVT LTD in Thane, Maharashtra, registered with MahaRERA as P51700032231 on 15 Dec 2021. The registration is recorded completed; possession was promised by 31 Oct 2025. 10 of the 36 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NamePRISM INDUSTRIAL ESTATE
  • TypeMixed
  • Location
    • MIDC ROAD
    • NEAR PENDHARKAR COLLEGE
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421203
  • Pincode421203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700032231
  • ReraGenie IDRG-MH-69093

Builder

  • NameSPLENDOR SHELTERS PVT LTD
  • Entity typeCompany
  • GSTIN27AAFCS8923E1Z7
  • DirectorsSHASHANK SUDHIR KHADILKAR, PRASHANT SUDHIR KHADILKAR
  • Other registrations4 more →
  • Completed3 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredDec 2021PromisedOct 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Dec 2021
  • Promised completion31 Oct 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed37 files

Current status

28%10 of 36 units booked
82.0%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRISM INDUSTRIAL ESTATENA4403636

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

PRISM INDUSTRIAL ESTATE: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed7

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots7
Open Space7

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area878 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Apr 2026
LandownerVillageDistrict
DOMBIVALI GAS CODOMBIVLIThane

Approvals and building plan

Sanctioning authorityMaharashtra Industrial Development Corporation
Permissible FSI1316.0
Proposed, not sanctioned1,235 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDAMLE BLDG PHADAKE ROAD BAJI PRABHU CHOWK DOMBIVALI EAST 421201
Estimated costRs 3.36 cr
Cost incurredRs 2.75 cr
Work done82.02%
BuildingWingEstimatedIncurred
PRISM INDUSTRIAL ESTATENARs 3.19 crRs 2.62 cr
-NARs 16.79 lakhRs 13.77 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAUNAK PRASHANT KHADILKAR PRASHANT KHADILKAR
EngineerAMODH MADHAV LUMAN
EngineerSK Consultants & Engineers
Chartered AccountantAVINASH MORE & ASSOCIATES
Chartered AccountantN B Sayed & Associates
PartnerRole in project
SPLENDOR SHELTERS PVT LTD-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Dec 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Nov 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed37

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC Verification.pdf27 Apr 2026
Occupational CertificateFile: Full OC.pdf16 Apr 2026
Occupational CertificateFile: Sanctioned Plan 1.pdf16 Apr 2026
Occupational CertificateFile: Sanctioned Plan 2.pdf16 Apr 2026
Occupational CertificateFile: Commencement Certificate.pdf16 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf9 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf9 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf9 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf9 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf9 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf9 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf9 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf9 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf9 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf9 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf9 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf9 Apr 2026
Copy of the legal title reportFile: FORMAT -A Legal Title Report.pdf8 Dec 2021
Copy of the legal title reportFile: Annexure Flow of the Title of the said plot.pdf8 Dec 2021
CERSAI detailsFile: CERSAI REPORT.pdf1 Dec 2021
OtherFile: Annexure.pdf27 Nov 2021
Details of encumbrancesFile: Letter of Encumbrances.pdf26 Nov 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 1.pdf26 Nov 2021
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf26 Nov 2021
OtherFile: Search Report.pdf26 Nov 2021
Layout approvalFile: Layout Plan.pdf9 Nov 2021
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf9 Nov 2021
Declaration in FORM BFile: Form B.pdf9 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf9 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf9 Nov 2021
Proforma of Allotment letterFile: Agreement for Assignment.pdf9 Nov 2021
Building plan approvalFile: MIDC Plan 1 (1).pdf8 Nov 2021
Building plan approvalFile: MIDC Plan 2.pdf8 Nov 2021
PAN CardFile: Pan Card Copy Splendor.pdf8 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: MIDC Plan 1 (1).pdf8 Nov 2021
Building Plan Approval / NA Order for plotted developmentFile: MIDC Plan 2.pdf8 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf8 Nov 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
NARMADA VISHRAM CHS PROPOSEDPLOT NO 16 ABHYUDAY CHS LTD SUBHASH ROAD DOMBIVALI EAST38CompletedDec 2023Late, Jun 2024

How this compares with Thane

28%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRISM INDUSTRIAL ESTATE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR PENDHARKAR COLLEGE7,600+ in Thane

2 kmPRISM INDUSTRIAL ESTATECompleted 74Lapsed / revoked 61Other 111Dot size: filed unitsN

Filed coordinates, straight-line distance. 246 registered projects within 2 km.

Builder: SPLENDOR SHELTERS PVT LTD

SPLENDOR SHELTERS PVT LTD has 5 registrations on MahaRERA, including NARMAD VISHRAM CHS PRAPOSED and NEEL KRISHNA CHS PROPOSED. Its filings disclose 6 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if PRISM INDUSTRIAL ESTATE is delayed beyond 31 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRISM INDUSTRIAL ESTATE?

The registered promoter entity is SPLENDOR SHELTERS PVT LTD, a company as per the filing. Its GSTIN 27AAFCS8923E1Z7 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRISM INDUSTRIAL ESTATE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRISM INDUSTRIAL ESTATE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRISM INDUSTRIAL ESTATE?

The professionals named in the filing: Architect: RAUNAK PRASHANT KHADILKAR PRASHANT KHADILKAR; Engineer: AMODH MADHAV LUMAN; Engineer: SK Consultants & Engineers; Chartered Accountant: AVINASH MORE & ASSOCIATES; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRISM INDUSTRIAL ESTATE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRISM INDUSTRIAL ESTATE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRISM INDUSTRIAL ESTATE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.