Red flags
- Completion date moved by 9 months
- 1 extension taken
Clear
- No complaints on record
- Separate project account declared
Saved.
PRESTIGE PRIMROSE HILLS PH-2 is a Residential/Group Housing project by PRESTIGE ESTATES PROJECTS LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/200618/003455 on 18 Jun 2020. Possession is promised by 30 Jun 2025. The completion date has moved by 9 months from the original filing.
At a glance
Project
- NamePRESTIGE PRIMROSE HILLS PH-2
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/200618/003455
- ReraGenie IDRG-KA-80296
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on18 Jun 2020
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 30 Sep 2024)
- Buildings3 building records
- Documents filed90 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 8 | - | - | - | 104 | 0 | 104 |
| Tower 9 | - | - | - | 104 | 0 | 104 |
| Tower 10 | - | - | - | 134 | 0 | 134 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 1 Mar 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 1 Mar 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SUDHARANI M S | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Venkataramanan Associates |
| Engineer | Design Ventures Engineering Consultants (I) Pvt Ltd |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed90
As listed on the registration, under the names the promoter filed them with; the newest 80 of 90 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/200618/003455 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Site PlanFile: 01 SITE PLAN.pdf | 1 Mar 2023 |
| Upper BasementFile: 02 BUILDING - 02 - COMBINED UPPER BASEMENT FLOOR PLAN.pdf | 1 Mar 2023 |
| Lower BasementFile: 02A BUILDING - 02 - LOWER BASEMENT FLOOR PLAN.pdf | 1 Mar 2023 |
| Upper BasementFile: 03A UPPER BASEMENT FLOOR PLAN.pdf | 1 Mar 2023 |
| Upper BasementFile: 03B BUILDING - 2&3 - UPPER BASEMENT FLOOR PLAN.pdf | 1 Mar 2023 |
| Combined Ground FloorFile: 04 COMBINED GROUND FLOOR PLAN.pdf | 1 Mar 2023 |
| Building 1 PlansFile: 04A BUILDING - 01 - TOWER- 01 to 07 UTILITY GROUND FLOOR PLAN.pdf | 1 Mar 2023 |
| Building 2 & 3 PlansFile: 04B BUILDING - 2&3 - GROUND FLOOR PLAN.pdf | 1 Mar 2023 |
| Building 1 PlansFile: 05 BUILDING - 01 - TOWER 01 to 07 UTILITY FIRST FLOOR PLAN.pdf | 1 Mar 2023 |
| Building 1 PlansFile: 06 BUILDING - 01 - TOWER 01 to 07 UTILITY SECOND FLOOR PLAN.pdf | 1 Mar 2023 |
| Building 1 PlansFile: 07 BUILDING -01 - TOWER 01to 07 UTILITY THIRD FLOOR PLAN.pdf | 1 Mar 2023 |
| Building 1 PlansFile: 08 BUILDING - 01 - TOWER 01 to 07 TYPICAL FOURTH to FOURTEENTH FLOOR PLAN.pdf | 1 Mar 2023 |
| Building 1 PlansFile: 09 BUILDING - 01 - TOWER 01 to 07 TERRACE FLOOR PLAN.pdf | 1 Mar 2023 |
| Building 2 & 3 PlansFile: 10 BUILDING - 2&3 - FIRST FLOOR PLAN.pdf | 1 Mar 2023 |
| Building 2 & 3 PlansFile: 11 BUILDING - 02 & 03 SECOND FLOOR PLAN.pdf | 1 Mar 2023 |
| Building 2 & 3 PlansFile: 12 BUILDING - 02 & 03 - TYPICAL THIRD to FOURTEENTH FLOOR PLAN.pdf | 1 Mar 2023 |
| Building 2 & 3 PlansFile: 13 BUILDING - 2&3 - TERRACE FLOOR PLAN.pdf | 1 Mar 2023 |
| SectionsFile: 14 BUILDING - 01 & 02 - SECTIONS.pdf | 1 Mar 2023 |
| ElevationsFile: 15 BUILDING - 01 & 02 - ELEVATION.pdf | 1 Mar 2023 |
| License CopyFile: Primrose Hills - License copy.pdf | 1 Mar 2023 |
| BWSSB NOCFile: PRIMROSE HILLS - BWSSB_001.pdf | 1 Mar 2023 |
| BESCOM NOCFile: PRIMROSE HILLS - BESCOM.pdf | 1 Mar 2023 |
| Joint AffidavitFile: Joint Affidavit.pdf | 5 Jun 2020 |
| All the required documents are attached and clarification is provided in replyFile: All document-Phase-II.pdf | 21 Mar 2020 |
| CertificateFile: COI PEPL.pdf | - |
| Already registered project ongoing detailsFile: Form 5 Primrose Hills Ph 2.pdf | - |
| Modified plan details site plan, floor plans, Plan Licence LetterFile: 01 SITE PLAN.pdf | - |
| Elevation, Sections, Specifications ( If changes are there )File: 15 BUILDING - 01 & 02 - ELEVATION.pdf | - |
| Chartered Accountant CertificateFile: Form 4 Primrose Hills Ph 2.pdf | - |
| Notarized AffidavitFile: Affidavit.pdf | - |
| Engineer CertificateFile: Form 6 Primrose Hills Ph 2.pdf | - |
| Architect CertificateFile: Form 5 Primrose Hills Ph 2.pdf | - |
| Structural Engineer Certificate for stability of structureFile: STABILITY CERTIFICATE PRIMROSE HILLS PH 2 20230210.pdf | - |
| Modification of Plan DetailsFile: DP.pdf | - |
| Modification of Plan DetailsFile: MODIFIED - DP - 20220926.pdf | - |
| Modification of Plan DetailsFile: Commencement Certificate.pdf | - |
| Modification of Plan DetailsFile: Commencement Certificate.pdf | - |
| Document 1File: CFE Addendum 20220721.pdf | - |
| Document 2File: FIRE NOC - 20221006.pdf | - |
| Document 3File: MOEF - CORRIGENDUM.pdf | - |
| BBMP License | - |
| Site Plan | - |
| Sale Deed-Prestige Primrose Phase-II(RERA) | - |
| AGS Prestige Primrose Hills Phase-2(RERA) | - |
| Sale Deed-all | - |
| Section and elevation merged | - |
| NEW CDP MAP | - |
| Allotment-Phase II | - |
| Brochure | - |
| Specification | - |
| EC | - |
| Special Notice, Khatha Certificate & Extract | - |
| JDa | - |
| Conversion order | - |
| Fire NoC | - |
| AIRPORT | - |
| Bescom | - |
| BWSSB | - |
| KSPCB | - |
| MOEF | - |
| BSNL | - |
| Unnamed document | - |
| Unnamed document | - |
| Section and elevation merged | - |
| All plans | - |
| Section and elevation merged | - |
| Opinion | - |
| Balance Sheet 2018 - 2019File: Balance Sheet -Mar19.pdf | - |
| Balance Sheet 2017 - 2018File: Balance Sheet -Mar18.pdf | - |
| Balance Sheet 2016 - 2017File: Balance Sheet -Mar17.pdf | - |
| Audited Profit and Loss Statement 2018 - 2019File: P & L Statement -Mar19.pdf | - |
| Audited Profit and Loss Statement 2017 - 2018File: P & L Statement -Mar18.pdf | - |
| Audited Profit and Loss Statement 2016 - 2017File: P & L Statement -Mar17.pdf | - |
| Director's Report 2018 - 2019File: Director's Report 2019.pdf | - |
| Director's Report 2017 - 2018File: Director's Report 2018.pdf | - |
| Director's Report 2016 - 2017File: Director's Report 2017.pdf | - |
| Cash Flow Statement 2018 - 2019File: Cashflow Statement -Mar19.pdf | - |
| Cash Flow Statement 2017 - 2018File: Cashflow Statement -Mar18.pdf | - |
| Auditor's Report 2018 - 2019File: Auditors Report -Mar19_compressed.pdf | - |
| Auditor's Report 2017 - 2018File: Auditors Report -Mar18_compressed.pdf | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| PRESTIGE WESTWOOD | - | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep PRESTIGE PRIMROSE HILLS PH-2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: PRESTIGE ESTATES PROJECTS LIMITED
PRESTIGE ESTATES PROJECTS LIMITED has 25 registrations on RERA Karnataka, including PRESTIGE DEJAVU and PRESTIGE KENILWORTH. Its filings declare 28 earlier projects, 28 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if PRESTIGE PRIMROSE HILLS PH-2 is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of PRESTIGE PRIMROSE HILLS PH-2?
The registered promoter entity is PRESTIGE ESTATES PROJECTS LIMITED, a company as per the filing. Its CIN U07010KA1997PLC022322 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in PRESTIGE PRIMROSE HILLS PH-2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at PRESTIGE PRIMROSE HILLS PH-2?
The professionals named in the filing: Architect: Venkataramanan Associates; Engineer: Design Ventures Engineering Consultants (I) Pvt Ltd. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRESTIGE PRIMROSE HILLS PH-2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback