Registration approved Residential/Group Housing project

Prestige Jindal City Phase-I

By Prestige Southcity Holdings

RG-KA-88981 · RERA PRM/KA/RERA/1251/309/PR/180406/001495

Source: official RERA Karnataka filing

Red flags

  • 54 complaints at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Jul 2022Possession promisedmoved 9 months from the original
54Complaints at RERA Karnatakaon this registration
Jump to the 42 documents Report an error

Prestige Jindal City Phase-I is a Residential/Group Housing project by Prestige Southcity Holdings in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/180406/001495 on 6 Apr 2018. Possession is promised by 31 Jul 2022. The completion date has moved by 9 months from the original filing. 54 complaints are on record with the regulator.

At a glance

Project

  • NamePrestige Jindal City Phase-I
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/309/PR/180406/001495
  • ReraGenie IDRG-KA-88981

Builder

  • NamePrestige Southcity Holdings
  • Entity typePartnership Firm
  • Authorized SignatorySwaroop Anish
  • OthersRaghavendra
  • Other registrations4 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2018First promiseOct 2021Revised toJul 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on6 Apr 2018
  • Promised completion31 Jul 2022
  • Revised completionRevised to 31 Jul 2022 (originally 31 Oct 2021)
  • Buildings4 building records
  • Documents filed42 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 1 (T1,T2,T3)---6840684
BUILDING 2 (T1,T2,T3)---6810681
BUILDING 3 (T1,T2,T3)---7430743
CLUB HOUSE---606

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area131,016 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 733.75 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRSP Design Consultants (India) Pvt Ltd
EngineerL N T - RAM KUMAR G

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionOct 2021 → Jul 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka54

Case no.ComplainantRespondentFiled
01321/2024-Prestige Southcity Holdings19/12/2024
00103/2025-Prestige Southcity Holdings16/01/2025
01043/2025-Prestige Southcity Holdings25/08/2025
01044/2025-Prestige Southcity Holdings25/08/2025
01045/2025-Prestige Southcity Holdings25/08/2025
01046/2025-Prestige Southcity Holdings25/08/2025
01047/2025-Prestige Southcity Holdings25/08/2025
01048/2025-Prestige Southcity Holdings25/08/2025
01049/2025-Prestige Southcity Holdings25/08/2025
01050/2025-Prestige Southcity Holdings25/08/2025
01051/2025-Prestige Southcity Holdings25/08/2025
01052/2025-Prestige Southcity Holdings25/08/2025
01053/2025-Prestige Southcity Holdings25/08/2025
01054/2025-Prestige Southcity Holdings25/08/2025
01055/2025-Prestige Southcity Holdings25/08/2025
01056/2025-Prestige Southcity Holdings25/08/2025
01057/2025-Prestige Southcity Holdings25/08/2025
01058/2025-Prestige Southcity Holdings26/08/2025
01059/2025-Prestige Southcity Holdings26/08/2025
01060/2025-Prestige Southcity Holdings26/08/2025
01061/2025-Prestige Southcity Holdings26/08/2025
01062/2025-Prestige Southcity Holdings26/08/2025
01063/2025-Prestige Southcity Holdings26/08/2025
01064/2025-Prestige Southcity Holdings26/08/2025
01065/2025-Prestige Southcity Holdings26/08/2025
01066/2025-Prestige Southcity Holdings26/08/2025
01067/2025-Prestige Southcity Holdings26/08/2025
01068/2025-Prestige Southcity Holdings26/08/2025
01069/2025-Prestige Southcity Holdings26/08/2025
01070/2025-Prestige Southcity Holdings26/08/2025
01071/2025-Prestige Southcity Holdings26/08/2025
01072/2025-Prestige Southcity Holdings26/08/2025
01073/2025-Prestige Southcity Holdings26/08/2025
01074/2025-Prestige Southcity Holdings26/08/2025
01075/2025-Prestige Southcity Holdings26/08/2025
01076/2025-Prestige Southcity Holdings26/08/2025
01077/2025-Prestige Southcity Holdings26/08/2025
01078/2025-Prestige Southcity Holdings26/08/2025
01079/2025-Prestige Southcity Holdings26/08/2025
01080/2025-Prestige Southcity Holdings26/08/2025
01081/2025-Prestige Southcity Holdings26/08/2025
01082/2025-Prestige Southcity Holdings26/08/2025
01083/2025-Prestige Southcity Holdings26/08/2025
01084/2025-Prestige Southcity Holdings28/08/2025
01089/2025-Prestige Southcity Holdings29/08/2025
01090/2025-Prestige Southcity Holdings29/08/2025
01091/2025-Prestige Southcity Holdings29/08/2025
01092/2025-Prestige Southcity Holdings29/08/2025
01093/2025-Prestige Southcity Holdings29/08/2025
01094/2025-Prestige Southcity Holdings29/08/2025
01095/2025-Prestige Southcity Holdings29/08/2025
01108/2025-Prestige Southcity Holdings29/08/2025
01110/2025-Prestige Southcity Holdings29/08/2025
01261/2025-Prestige Southcity Holdings13/10/2025

Documents filed42

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/180406/001495 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: South City-Partnership.pdf-
Plan Sanction-
DP-
Site Plan-Proper-
Draft Sale Deed-
Draft Agreement-
Sale Deed-
CDP-
Booking form - Prestige Jindal City-
PJC 1-
SPECIFICATIONS FOR PRESTIGE JINDAL CITY-
EC-
E-Katha-
JDA-Merged-
GPA-Merged-
OM-Compressed-
Fire Compressed-
AAI-
BESCOM-
BSNL-
Unnamed document-
DP-
Opinion-
Balance Sheet 2016 - 2017File: SOUTHCITY-BALANCE SHEET-2016.pdf-
Balance Sheet 2015 - 2016File: SOUTHCITY BALANCE SHEET- 2015.pdf-
Balance Sheet 2014 - 2015File: SOUTHCITY BALANCE SHEET2014.pdf-
Audited Profit and Loss Statement 2016 - 2017File: SOUTHCITY P&L-2016.pdf-
Audited Profit and Loss Statement 2015 - 2016File: SOUTHCITY P & L- 2015.pdf-
Audited Profit and Loss Statement 2014 - 2015File: SOUTHCITY-P&L-2014.pdf-
Cash Flow Statement 2016 - 2017File: PSH_Cash flow statement_Mar 17.pdf-
Auditor's Report 2016 - 2017File: PSS AR16.pdf-
Auditor's Report 2015 - 2016File: PSS AR- 2015.pdf-
Auditor's Report 2014 - 2015File: PSS AR 14.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: PSH 16-17.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: PSH 15-16.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: PSH 14-15.pdf-
Form B-
Prospectus/BrochureFile: Prestige Jindal City - Brochure.pdf-
Advertisement Copy 1File: PJC 50X52 Curve.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_309_PR_180406_001495.xlsx-
Occupancy CertificateFile: JINDAL CITY - OCCUPANCY CERTIFICATE.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavit-PJC-PhaseI.PDF-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Prestige Misty Waters-Completed-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Prestige Jindal City Phase-I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Prestige Southcity Holdings

PRESTIGE SOUTHCITY HOLDINGS has 5 registrations on RERA Karnataka, including Prestige Jindal City-Phase II and Prestige Jindal City Phase-I. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Prestige Jindal City Phase-I is delayed beyond 31 Jul 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Prestige Jindal City Phase-I?

The registered promoter entity is Prestige Southcity Holdings, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Prestige Jindal City Phase-I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Prestige Jindal City Phase-I?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Prestige Jindal City Phase-I?

The professionals named in the filing: Architect: RSP Design Consultants (India) Pvt Ltd; Engineer: L N T - RAM KUMAR G. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Prestige Jindal City Phase-I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Prestige Jindal City Phase-I. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Prestige Jindal City Phase-I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.