Red flags

  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2022Possession promisedmoved 21 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 29 documents Report an error

PREMIERA REGENCY is a Residential/Group Housing project by White Lion Constructions OPC Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/181010/002030 on 10 Oct 2018. Possession is promised by 3 Mar 2022. The completion date has moved by 21 months from the original filing.

At a glance

Project

  • NamePREMIERA REGENCY
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/181010/002030
  • ReraGenie IDRG-KA-80168

Builder

  • NameWhite Lion Constructions OPC Pvt Ltd
  • Entity typeOther
  • Authorized SignatoryMOHAMMED ADNAN KHALANDAR

Key dates

this monthRegisteredOct 2018First promiseJun 2020Revised toMar 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on10 Oct 2018
  • Promised completion3 Mar 2022
  • Revised completionRevised to 3 Mar 2022 (originally 3 Jun 2020)
  • Buildings1 building record
  • Documents filed29 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Premiera Regency---27027

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & CeilingNot applicable
Joinery: Doors, Windows, Ventilators etcNot applicable
Basic work of Water supply, Sanitary and ElectrificationNot applicable
Dadoing, Skirting, Flooring, Tiles work (All types)Not applicable
Railing and Grill fixingNot applicable
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
PaintingNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawingsNot applicable

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemNoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,288 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.00 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJun 2020 → Mar 2021

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/220622/002030Mar 2021 → Mar 2022

Reason as filed by the promoterShortage of Labour

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed29

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/181010/002030 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: IMG-20180313-WA0111 (1).jpg-
Architect Certificate for Work Completion Schedule till DateFile: ARCHITECTURE CERTIFICATE.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: ENGINEER CERTIFICATE.pdf-
CA Certificate for Funds UtilizationFile: CACERTIFICATE.pdf-
Architect Certificate for Pending Work Completion Schedule.File: ARCHITECTURE CERTIFICATE.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: ENGINEER CERTIFICATE.pdf-
CA Certificate for Funds required for Project CompletionFile: CACERTIFICATE.pdf-
AffidavitFile: RENEWED PLAN CERTIFICATE.pdf-
Latest Encumbrance CertificateFile: ENCUMBRANCE CERTIFICATE.pdf-
Details Of Sold/ Un-sold UnitsFile: unsold CERTIFICATE.pdf-
Commencement-
Golahalli SP Max Legible-
Golahalli SP Max Legible-
Saled Deed-
Golahalli SP Max Legible-
Golahalli SP Max Legible-
Specifications-
EC Upto Date-
scan 1-
GPA & JDA-
Converstion Order-
PTCL-
PCB 1-
Unnamed document-
Golahalli SP Max Legible-
SANCTION PLAN SHEET1-
Prospectus/BrochureFile: Premiera Regency.pdf-
Advertisement Copy 1File: Premiera Regency.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_181010_002030.xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 21 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep PREMIERA REGENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: White Lion Constructions OPC Pvt Ltd

White Lion Constructions OPC Pvt Ltd has 1 registration on RERA Karnataka, including PREMIERA REGENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if PREMIERA REGENCY is delayed beyond 3 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of PREMIERA REGENCY?

The registered promoter entity is White Lion Constructions OPC Pvt Ltd. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in PREMIERA REGENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in PREMIERA REGENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PREMIERA REGENCY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PREMIERA REGENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.