ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / Pramuk MM Meridian

Registration approved Mixed Development project

Pramuk MM Meridian

By Pramuk Infracon LLP

RG-KA-33861 · RERA PRM/KA/RERA/1251/310/PR/170915/000128

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 2 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Sep 2019Possession promisedmoved 2 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 48 documents Report an error

Pramuk MM Meridian is a Mixed Development project by Pramuk Infracon LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/170915/000128 on 15 Sep 2017. Possession is promised by 30 Sep 2019. The completion date has moved by 2 months from the original filing.

At a glance

Project

  • NamePramuk MM Meridian
  • TypeMixed Development
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/170915/000128
  • ReraGenie IDRG-KA-33861

Builder

  • NamePramuk Infracon LLP
  • Entity typePartnership Firm
  • Authorized SignatorySreekrishna Bhagvan Prasad
  • OthersNarasimhaiah Keshavamurthy
  • Other registrations1 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredSep 2017First promiseJul 2019Revised toSep 2019

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Sep 2017
  • Promised completion30 Sep 2019
  • Revised completionRevised to 30 Sep 2019 (originally 1 Jul 2019)
  • Buildings2 building records
  • Documents filed48 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NORTH---64064
SOUTH---68068

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,747 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 160.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectmedappa
EngineerVG Palaksha

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/310/PR/200103/000128Jul 2019 → Sep 2019

Reason as filed by the promoterAwaiting Approvals

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed48

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/170915/000128 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Registration certificate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect certificate.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engg Certificate.pdf-
CA Certificate for Funds UtilizationFile: CA Certificate.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect certificate.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engg Certificate.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate.pdf-
AffidavitFile: Form B.pdf-
Latest Encumbrance CertificateFile: Encumbrabce.jpg-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails (1).xlsx-
Document 1File: Declaration.pdf-
Document 2File: All Affidavits.pdf-
Document 3File: All Affidavits.pdf-
Document 4File: Consent.pdf-
Document 5File: Occupancy Certificate.PDF-
Commencement certificate-
BLUE PRINT SCAN AOO -
BLUE PRINT SCAN AAO -0002-
sale deed-
DRAFT Agreement to sell MMIE-
land_title_deed-
building license-
Draft Allotment letter-
broacher-final-artwork-
NOC (1)-
construction_specifications-
encumbrance-
conversion order-
Balance Sheet 2015 - 2016File: balance sheet 2016.pdf-
Balance Sheet 2014 - 2015File: balance sheet 2015.pdf-
Balance Sheet 2013 - 2014File: balance sheet 2014.pdf-
Audited Profit and Loss Statement 2015 - 2016File: profit loss 2016.pdf-
Audited Profit and Loss Statement 2014 - 2015File: profit loss 2015.pdf-
Audited Profit and Loss Statement 2013 - 2014File: profit loss 2014.pdf-
Cash Flow Statement 2015 - 2016File: cash flow.pdf-
Auditor's Report 2015 - 2016File: auditors report 2016 (1).pdf-
Auditor's Report 2014 - 2015File: auditors_report_2015_1_.pdf-
Auditor's Report 2013 - 2014File: auditors report 2014 (1).pdf-
Income Tax Return Acknowledgement 2015 - 2016File: income tax 2016.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: income tax 2015.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: income tax 2014.pdf-
Signed form b-
Prospectus/BrochureFile: Brouchers.pdf-
Advertisement Copy 1File: Brouchers.pdf-
Tower Excel SheetFile: Flat Sold and usold.xlsx-
Occupancy CertificateFile: Occupancy Certificate.PDF-
Completion certificateFile: Engineer Certificate.PDF-
Registered Agreement of SaleFile: Agreement to sell.PDF-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
Pramuk Aqua Heights-CompletedJul 2017No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 2 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Pramuk MM Meridian on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Pramuk Infracon LLP

PRAMUK INFRACON LLP has 2 registrations on RERA Karnataka, including Pramuk MM Magnus and Pramuk MM Meridian. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Pramuk MM Meridian is delayed beyond 30 Sep 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Pramuk MM Meridian?

The registered promoter entity is Pramuk Infracon LLP, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Pramuk MM Meridian?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Pramuk MM Meridian?

The professionals named in the filing: Architect: medappa; Engineer: VG Palaksha. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pramuk MM Meridian?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pramuk MM Meridian. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pramuk MM Meridian to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.