Home / Browse projects / Bengaluru Urban, Karnataka / Pramuk MM Magnus
Pramuk MM Magnus
RG-KA-38476 · RERA PRM/KA/RERA/1251/310/PR/130625/007830
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
Saved.
Pramuk MM Magnus is a Residential/Group Housing project by PRAMUK INFRACON LLP in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/130625/007830 on 13 Jun 2025. Possession is promised by 4 May 2029.
At a glance
Project
- NamePramuk MM Magnus
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/130625/007830
- ReraGenie IDRG-KA-38476
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on13 Jun 2025
- Promised completion4 May 2029
- Revised completionNone
- Buildings1 building record
- Documents filed35 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Single Tower | - | - | - | 95 | 0 | 95 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | - |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | - |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | Yes | - |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | Yes | - |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | No | Not applicable |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | Yes | - |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M. M. Industrial Estate | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 136.19 cr | - |
| On-site expenditure-Consultants Fees | Rs 2.40 cr | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Poonachanda Nanaiah Medappa |
| Engineer | Poonachanda Nanaiah Medappa |
| Chartered Accountant | P N Rajashekar |
Documents filed35
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/130625/007830 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Registration CertificateFile: Firm Incorporation Certifcate.pdf | - |
| GST CertificateFile: Gst Certificate.pdf | - |
| Partnership DeedFile: Partnership Deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: CA Certificate.pdf | - |
| Certificate issued by Architect Form 2File: FORM 5 Architect Certificate.pdf | - |
| Certificate issued by Engineer Form 3File: FORM 6 ENGG.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non Litigation.pdf | - |
| Balance Sheet 2023 - 2024File: BALANCE SHEET FY 23-24.pdf | - |
| Balance Sheet 2022 - 2023File: BALACE SHEET FY 22-23.pdf | - |
| Balance Sheet 2021 - 2022File: BALANCE SHEET FY 21-22.pdf | - |
| Audited Profit and Loss Statement 2023 - 2024File: P&L FY 23-24.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: P&L FY 2022-23.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: P&L FY 21-22.pdf | - |
| Income Tax Return Acknowledgement 2023 - 2024File: ITR FY 23-24.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: ITR FY 22-23.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: ITR FY 21-22.pdf | - |
| BUILDING LICENCE | - |
| APPROVED PLAN | - |
| Sectional Drawing | - |
| Project specifications | - |
| Brochure | - |
| Relinquishment Deed | - |
| Agreement of Sale | - |
| Allotment letter | - |
| FORM B AFFIDAVIT | - |
| No violation | - |
| JDA Affiadavit | - |
| Legal Opinion | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Pramuk MM Meridian | 46/1 KR Road, 7th Block Jayanagar, Bengaluru South | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Pramuk MM Magnus on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: PRAMUK INFRACON LLP
PRAMUK INFRACON LLP has 2 registrations on RERA Karnataka, including Pramuk MM Magnus and Pramuk MM Meridian. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Pramuk MM Magnus is delayed beyond 4 May 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Pramuk MM Magnus?
The registered promoter entity is PRAMUK INFRACON LLP, a partnership firm as per the filing. Its LLPIN AAA-3977 and GSTIN 29AAIFP8026D1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Pramuk MM Magnus?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Pramuk MM Magnus?
The professionals named in the filing: Architect: Poonachanda Nanaiah Medappa; Engineer: Poonachanda Nanaiah Medappa; Chartered Accountant: P N Rajashekar. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Pramuk MM Magnus?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback