POORVI CHAMPIONS HEIGHT

By Poorvi Infinite Private Limited

RG-KA-54884 · RERA PRM/KA/RERA/1251/446/PR/191107/002986

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 12 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2022Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 71 documents Report an error

POORVI CHAMPIONS HEIGHT is a Residential/Group Housing project by Poorvi Infinite Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/191107/002986 on 7 Nov 2019. Possession is promised by 31 Mar 2022. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NamePOORVI CHAMPIONS HEIGHT
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/191107/002986
  • ReraGenie IDRG-KA-54884

Builder

  • NamePoorvi Infinite Private Limited
  • Entity typeCompany
  • Authorized SignatorySubramani
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredNov 2019First promiseMar 2021Revised toMar 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on7 Nov 2019
  • Promised completion31 Mar 2022
  • Revised completionRevised to 31 Mar 2022 (originally 14 Mar 2021)
  • Buildings1 building record
  • Documents filed71 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
POORVI CHAMPIONS HEIGHT---70070

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,845 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 10.58 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBLENDS DESIGN PRIVATE LIMITED
EngineerQDC INDIA CONSULTING (P) LTD

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMar 2021 → Dec 2021

No reason recorded in the filing

EX/PRM/KA/RERA/1251/446/PR/220314/002986Dec 2021 → Mar 2022

Reason as filed by the promoterAwaiting OC

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed71

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/191107/002986 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Registration Certificate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Form 5 Architect Certificate.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Form 6 Engineer Certificate.pdf-
CA Certificate for Funds UtilizationFile: Form 4 CA Certificate.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Form 5 Architect Certificate.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Form 6 Engineer Certificate.pdf-
CA Certificate for Funds required for Project CompletionFile: Form 4 CA Certificate.pdf-
AffidavitFile: affidavit cum declaration.pdf-
Latest Encumbrance CertificateFile: ec as on 11 Aug 2020.pdf-
Details Of Sold/ Un-sold UnitsFile: Form 4 CA Certificate.pdf-
Document 1File: affidavit extension under sec 18 of rera.pdf-
Document 2File: affidavit for rera extension.pdf-
Document 3File: rera extension request.pdf-
Document 4File: Karnataka state pollution control board_03_Jan_2018.pdf-
Registration Certificate-
Approved Building or Plotting Plan (0015 and 0020)-
Approved Plans (14 15 16 and 20)-
Proforma for Sale Deed-
Proforma of Agreement for Sale-
Sale Deed & RTC-
Approved Section of Building or Infrastructure Plan of Plotting (0014)-
Area Development Plan of Project Area (0014)-
Proforma of Allotment Letter-
Brochure of Current-
Project Specification-
Encumbrance Certificate-
Section 3(1) Notarized Affidavit-
Khatha-
Joint Development Agreement-
Fire NOC-
Airport Authority of India-
Bescom NOC-
KSPCB-
Advocate Search Report-
Unnamed document-
Certificate from Registered Engineer-
Sectional Drawing of Apartments (0015)-
Existing Layout Plan (0014)-
Existing Section Plan and Speciification (0015)-
Change of Land Use-
Advocate Search Report-
Balance Sheet 2017 - 2018File: Balance Sheet for FY 2017-18.pdf-
Balance Sheet 2016 - 2017File: Balance Sheet for FY 2016-17.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet for FY 2015-16.pdf-
Audited Profit and Loss Statement 2017 - 2018File: Profit & Loss Statement for FY 2017-18.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Profit & Loss Statement for FY 2016-17.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit & Loss Statement for FY 2015-16.pdf-
Director's Report 2017 - 2018File: Directors Report for FY 2017-18.pdf-
Director's Report 2016 - 2017File: Directors Report for FY 2016-17.pdf-
Director's Report 2015 - 2016File: Directors Report for FY 2015-16.pdf-
Cash Flow Statement 2017 - 2018File: Cash Flow Statement for FY 2017-18.pdf-
Cash Flow Statement 2016 - 2017File: Cash Flow Statement for FY 2016-17.pdf-
Auditor's Report 2017 - 2018File: Audit Report for FY 2017-18.pdf-
Auditor's Report 2016 - 2017File: Auditor's Report for FY 2016-17.pdf-
Auditor's Report 2015 - 2016File: Audit Report for FY 2015-16.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR V for FY 2017-18.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR V for FY 2016-17.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR V for FY 2015-16.pdf-
Declaration (Form B)-
Prospectus/BrochureFile: brochure.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_446_PR_191107_002986.xlsx-
Delay ReasonFile: Extension Reason.pdf-
NOC issued by the Fire Force department after completion of workFile: Fire NOC 30_09_2021.pdf-
Occupancy CertificateFile: OC.pdf-
Consent for operation issued by KSPCBFile: Karnataka state pollution control board_03_Jan_2018.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: Bescom NOC_13_09_2017.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB 31_08_2021.pdf-
Details of external infrastructure work such as drive way, play area, park, STP and water treatment plant, WheFile: Form 5 Architect Certificate.pdf-
Architect certificate for having completed the work(in format no 5)File: Form 6 Engineer Certificate.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form 4 CA Certificate.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Closure Affidavit.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep POORVI CHAMPIONS HEIGHT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmPOORVI CHAMPIONS HEIGHTOther 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 34 registered projects within 2 km.

Builder: Poorvi Infinite Private Limited

POORVI INFINITE PRIVATE LIMITED has 2 registrations on RERA Karnataka, including POORVI ENCHANTING and POORVI CHAMPIONS HEIGHT. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if POORVI CHAMPIONS HEIGHT is delayed beyond 31 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of POORVI CHAMPIONS HEIGHT?

The registered promoter entity is Poorvi Infinite Private Limited, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in POORVI CHAMPIONS HEIGHT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at POORVI CHAMPIONS HEIGHT?

The professionals named in the filing: Architect: BLENDS DESIGN PRIVATE LIMITED; Engineer: QDC INDIA CONSULTING (P) LTD. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in POORVI CHAMPIONS HEIGHT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About POORVI CHAMPIONS HEIGHT. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save POORVI CHAMPIONS HEIGHT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.