ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / POONAM CELESTE

Registered No litigation declared Others project

POONAM CELESTE

By PL7 Realty Pvt. Ltd.

RG-MH-54567 · RERA P51800046581 · Last updated on MahaRERA portal: 16 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 29 months
  • 3 extensions taken
  • Rs 50.00 crore secured on the land, in favour of Aditya Birla Housing Finance Limited
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 29 months from the original
5 of 11Construction stages donefurthest along: Staircases, 86%
18 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 125 documents Report an error

POONAM CELESTE is a Others project by PL7 Realty Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046581 on 19 Aug 2022. Possession is promised by 21 Apr 2027. The completion date has moved by 29 months from the original filing. 10 of the 28 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NamePOONAM CELESTE
  • TypeOthers
  • Location
    • R B MEHTA MARG (60 FEET ROAD)
    • GHATKOPAR EAST
    • Kurla
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800046581
  • ReraGenie IDRG-MH-54567

Builder

  • NamePL7 Realty Pvt. Ltd.
  • Entity typeCompany
  • CINU45400MH2019PTC323539
  • GSTIN27AAKCP4723C1ZJ
  • DirectorsPranay Puneshwar Meshram, Deeksha Pranay Meshram

Key dates

this monthRegisteredAug 2022First promiseNov 2024Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Aug 2022
  • Promised completion21 Apr 2027
  • Revised completionRevised to 21 Apr 2027 (originally 30 Nov 2024)
  • Buildings1 building record
  • Documents filed125 files

Current status

36%10 of 28 units booked
85.9%Work done, per cost certificate

Figures as on 16 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Poonam CelesteNA141324428

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 86%.

Poonam Celeste: 71% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises81%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks86%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.76%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.31%

Progress on shared amenities15

As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed41

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots41
Closed/Covered41

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area635 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Housing Finance Limited
Secured amountRs 50.00 crore
Declared on26 Nov 2025
LandownerVillageDistrict
The Ghatkopar Poonam CHSKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2057.51
Proposed, not sanctioned2,051 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAnchorage Building, 170/171 Central Avenue, Chembur
Estimated costRs 15.00 cr
Cost incurredRs 12.89 cr
Work done85.91%
BuildingWingEstimatedIncurred
Poonam CelesteNARs 13.00 crRs 12.27 cr
-NARs 2.00 crRs 62.00 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBharat Krishnarao Matre
EngineerPiyushkumar Sura
EngineerTukaram Gudmewad
Chartered AccountantShashank Rajendra Jain
Chartered AccountantDeepak Oza
Chartered AccountantParas Thakkar Associates
PartnerRole in project
PL7 Realty Pvt. Ltd.-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800019849Nov 2024 → Nov 2025

Reason as filed by the promoterWe are making the application to extend the completion date of our above project to 30/11/2025 as there is delay in government permissions and fund flow management.

EA01122518481Nov 2024 → Aug 2026

Reason as filed by the promoterAs evident from the Architect’s Certificate dated 30/09/2025, the construction work of the project has been substantially completed. The remaining works pertaining to the installation of lifts, water pumps, firefighting fittings, finishing work and other related components are pending which we undertake to complete by 31/05/2026. Other miscellaneous works such as finishing, fire protection systems, water drainage systems, etc., will also be completed by 30/06/2026.

EA16072621771Nov 2024 → Apr 2027

Reason as filed by the promoter4. As evident from the Architect’s Certificate dated 31/03/2026, the construction work of the project has been substantially completed. The remaining works pertaining to the installation of lifts, water pumps, firefighting fittings, finishing work and other related components are pending which we undertake to complete by 31/01/2027. Other miscellaneous works such as finishing, fire protection systems, water drainage systems, etc., will also be completed by 28/03/2027. 5. After completing the above works, we will initiate the process for obtaining the requisite No Objection Certificates (NOCs)

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 6 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 21 Apr 2027

Documents filed125

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 125 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 PL7 30062026.pdf16 Jul 2026
Withdrawal Update Form 2File: Form 2 PL7 30062026.pdf16 Jul 2026
Withdrawal Update Form 3File: Form 3 PL7 30062026-compressed.pdf16 Jul 2026
Form 2A (FY 2025-2026)File: Form - 2 A Tukaram.pdf16 Jul 2026
Withdrawal Update Form 1File: FORM-1 - Architect Certificate - MARCH 2026.pdf22 Jun 2026
Withdrawal Update Form 2File: Form 2 PL7 31122025.pdf22 Jun 2026
Withdrawal Update Form 3File: FORM-3- CA Certificate - MARCH 2026_compressed.pdf22 Jun 2026
Form 2A (FY 2025-2026)File: Form - 2 A Tukaram.pdf17 Jun 2026
Withdrawal Update Form 1File: Form 1 PL7 31122025.pdf5 Mar 2026
Withdrawal Update Form 2File: Form 2 PL7 31122025.pdf5 Mar 2026
Withdrawal Update Form 3File: Form 3 PL7 31122025 Signed Compressed.pdf5 Mar 2026
Form 5 (FY 2023-2024)File: Form 5-PL-7 FY 23-24 Final to be uploaded.pdf21 Jan 2026
Form 5 (FY 2024-2025)File: Form 5-PL-7 FY 24-25 Final to be uploaded.pdf21 Jan 2026
Building plan approvalFile: PLAN - 19-01-2023 Highlighted.pdf2 Jan 2026
Form 1File: Form 1 31032025 of PL7.pdf1 Dec 2025
Form 2File: Form 2 31032025 PL7.pdf1 Dec 2025
Form 3File: Form 3 31032025 of PL7.pdf1 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold 31032025.pdf1 Dec 2025
Withdrawal Update Form 1File: Form 1 31032025 of PL7.pdf1 Dec 2025
Withdrawal Update Form 1File: Form 1 30062025 of PL7.pdf1 Dec 2025
Withdrawal Update Form 1File: Form 1 30092025 of PL7.pdf1 Dec 2025
Withdrawal Update Form 2File: Form 2 31032025 PL7.pdf1 Dec 2025
Withdrawal Update Form 2File: Form 2 30062025 of PL7.pdf1 Dec 2025
Withdrawal Update Form 2File: Form 2 30092025 of PL7.pdf1 Dec 2025
Withdrawal Update Form 3File: Form 3 31032025 of PL7.pdf1 Dec 2025
Withdrawal Update Form 3File: Form 3 30062025 of PL7.pdf1 Dec 2025
Withdrawal Update Form 3File: Form 3 30092025 of PL7.pdf1 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A to be uploded.pdf1 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30062024.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architect Certificate_Signed.pdf18 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31122024.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Poonam Celesta Final.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Poonam Celesta Final.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Poonam Celesta Final.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 30062024.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 30092024.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 31122024.pdf18 Jan 2025
Form 5 (FY 2022-2023)File: Form 5 PL7.pdf13 Sep 2024
Commencement Certificates / NA Order for plotted developmentFile: BMC Letter_compressed.pdf11 Jun 2024
Declaration about Commencement CertificateFile: Declaration of CC 1105204.pdf11 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory dec 22.pdf11 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory march 23.pdf11 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory June 23.pdf11 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory dec 23.pdf11 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory sep 23.pdf11 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory march24.pdf11 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory march24.pdf11 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sold unsold inventory sep 23.pdf11 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Pranay.pdf11 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Deeksha.pdf11 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24.pdf31 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Revalidated CC -11052025.pdf28 May 2024
Declaration about Commencement CertificateFile: Declaration of CC.pdf27 May 2024
Declaration in FORM BFile: Form B.pdf27 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PL7 31032024.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 PL7 31032024.pdf23 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 PL7 31032024.pdf23 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 PL7 31-3-23.pdf15 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 (ENGINEER) PK SURA for PL 7 as on 300623 (1).pdf30 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 (ENGINEER) PK SURA for PL 7 as on 300623 (1).pdf30 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 (ENGINEER) PK SURA for PL 7 as on 300923 (1).pdf30 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 (ENGINEER) PK SURA for PL 7 as on 311223 (1)_compressed.pdf30 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30062023_merged_compressed.pdf30 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PL7 30092023_compressed.pdf30 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PL7 31122023_compressed.pdf30 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 - Architect Certificate - 2 - 230630 - with Ack -Signed Copy.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 30092023.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate - 31122023.pdf29 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 23-24.pdf29 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 - Architect Certificate - 2 - 230630 - with Ack -Signed Copy.pdf8 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: REVALIDATED CC - 230523.pdf23 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Poonam Percentage Completion by Architect_230410.pdf17 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Poonam Celeste 31032023_compressed.pdf17 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032023 Poonam Celeste _compressed.pdf17 May 2023
Proforma of Agreement for saleFile: RERA AFS _Updated_160523 with rera master collection account.pdf16 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf8 May 2023
Details of encumbrances concerned to FinanceFile: Concerned to Finance.pdf24 Mar 2023
Details of encumbrances concerned to FinanceFile: Concerned to Legal.pdf24 Mar 2023
Details of encumbrances concerned to LegalFile: Concerned to Finance.pdf24 Mar 2023
Details of encumbrances concerned to LegalFile: Concerned to Legal.pdf24 Mar 2023

How this compares with Mumbai Suburban

36%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 29 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep POONAM CELESTE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GHATKOPAR EAST6,700+ in Mumbai Suburban

2 kmPOONAM CELESTECompleted 130Lapsed / revoked 101Other 132Dot size: filed unitsN

Filed coordinates, straight-line distance. 363 registered projects within 2 km.

Builder: PL7 Realty Pvt. Ltd.

PL7 Realty Pvt. Ltd. has 1 registration on MahaRERA, including POONAM CELESTE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if POONAM CELESTE is delayed beyond 21 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of POONAM CELESTE?

The registered promoter entity is PL7 Realty Pvt. Ltd., a company as per the filing. Its CIN U45400MH2019PTC323539 and GSTIN 27AAKCP4723C1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in POONAM CELESTE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for POONAM CELESTE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at POONAM CELESTE?

The professionals named in the filing: Architect: Bharat Krishnarao Matre; Engineer: Piyushkumar Sura; Engineer: Tukaram Gudmewad; Chartered Accountant: Shashank Rajendra Jain; Chartered Accountant: Deepak Oza; Chartered Accountant: Paras Thakkar Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in POONAM CELESTE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About POONAM CELESTE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save POONAM CELESTE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.