ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Playtor Ranjangaon- Phase 1

Completed No litigation declared Residential / Group Housing project

Playtor Ranjangaon- Phase 1

By PLAYTOR LIFESPACES PRIVATE LIMITED

RG-MH-08766 · RERA P52100001953 · Last updated on MahaRERA portal: 23 Jan 2020

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2017Possession promisedregistration recorded completed
37 of 55Construction stages doneacross 5 buildings; furthest along: External plumbing and external plaster, 95%
1Complaints at MahaRERAon this registration
Jump to the 39 documents Report an error

Playtor Ranjangaon- Phase 1 is a Residential / Group Housing project by PLAYTOR LIFESPACES PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100001953 on 31 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2017. 1 complaint is on record with the regulator.

At a glance

Project

  • NamePlaytor Ranjangaon- Phase 1
  • TypeResidential / Group Housing
  • Location
    • Karegaon
    • Shirur
    • Pune
    • 412220
  • Pincode412220
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001953
  • ReraGenie IDRG-MH-08766

Builder

  • NamePLAYTOR LIFESPACES PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorNIRANJAN ASHOKRAO BHATKULKAR
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2017PromisedDec 2017Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2017
  • Promised completion31 Dec 2017
  • Revised completionNone
  • Buildings5 building records
  • Documents filed39 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A2-4-JASPERNA50000
A2-3-JETNA50000
A2-2-MOONSTONENA50000
A2-1-ONYXNA50000
A3-1-LARIMARNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 23 Jan 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

37 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is External plumbing and external plaster, at 95%.

A2-4-JASPER82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A2-3-JET82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A2-2-MOONSTONE72%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
A2-1-ONYX69%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
A3-1-LARIMAR69%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%

Progress on shared amenities18

As on 23 Jan 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes92%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes95%
Open ParkingYes0%
Retaining WallYes100%
Compound WallYes95%
EarthworkYes100%

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area11,380 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
SANTOSH MOTILAL BHANSALIPune (M Corp.)Pune
SANGITA SANTOSH BHANSALIPune (M Corp.)Pune
SUJEET SANTOSH BHANSALIPune (M Corp.)Pune
SIDHATA SUJEET BHANSALIPune (M Corp.)Pune

Approvals and building plan

Permissible FSI9571.3
Proposed, not sanctioned9,571 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchM-4, Virwani Plaza Avenue, 11, East Street, Pune 411001

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANDEEP HARDIKAR & ASSOCIATES
EngineerSSPA
PartnerRole in project
PLAYTOR LIFESPACES PRIVATE LIMITED-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12401111PAWAN DILIP GAIKWADPLAYTOR LIFESPACES PRIVATE LIMITED12/12/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Sep 2019

Documents filed39

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Lifespaces Phase 1 A2-1.pdf23 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Lifespaces Phase 1 A2-2.pdf23 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Lifespaces Phase 1 A2-3.pdf23 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Lifespaces Phase 1 A2-4.pdf23 Jan 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Lifespaces Phase 1 A3-1.pdf23 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineering Certificate Lifespaces Phase 1.pdf23 Jan 2020
Certificates of CA (Form 3)File: Form 3_CA Cartificate_Lifespaces ph 1_compressed.pdf23 Jan 2020
Certificates of CA (Form 3)File: Form 3 Lifespaces 2019 Lifespaces Ph 1_compressed.pdf23 Jan 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate_A2-4 (Jasper) Bldg_Karegaon Ph 1.pdf26 Sep 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate_Jet and Moonstone Bldg_Karegaon Ph 1.pdf26 Sep 2019
Status of Formation of Legal EntityFile: Society Registration Certificate_Moonstone.pdf26 Sep 2019
Status of Formation of Legal EntityFile: Society Registration Certificate_Onyx.pdf26 Sep 2019
Certificates of CA (Form 5)File: Form 5_CA-Lifespaces Ph 1.pdf9 Jan 2019
Status of Formation of Legal EntityFile: Society Registration Certificate_Jasper.pdf22 Feb 2018
Status of Formation of Legal EntityFile: Society Registration Certificate_Jet.pdf22 Feb 2018
Certificates of Architect (Form 4)File: Form 4 - Jasper.pdf26 Dec 2017
Certificates of Architect (Form 4)File: Form 4 - Jet.pdf26 Dec 2017
Certificates of Architect (Form 4)File: Form 4 - Larimar.pdf26 Dec 2017
Certificates of Architect (Form 4)File: Form 4 - Moonstone.pdf26 Dec 2017
Certificates of Architect (Form 4)File: Form 4 - Onyx.pdf26 Dec 2017
OtherFile: Completion Certificate_A2-4 (Jasper) Bldg_Karegaon Ph 1.pdf26 Dec 2017
Proforma of Allotment letterFile: Revised Allotment (Booking) letter_RERA.pdf9 Nov 2017
Building plan approvalFile: IOD_Karegaon ph 1.pdf26 Jul 2017
Building Plan Approval (IOD)File: IOD_Karegaon ph 1.pdf26 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineer Cert_Karegaon ph 1.pdf26 Jul 2017
Certificates of CA (Form 3)File: Form 3_CA Certificate_Karegaon Ph 1.pdf26 Jul 2017
Proforma of Allotment letterFile: Allotment Letter and Flat Ag_Karegaon_Ph 1.pdf26 Jul 2017
Declaration in FORM BFile: Form B_Promoter_Karegaon Ph1.pdf22 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cer_Form 1_A3-1(Larimar)_Karegaon.pdf21 Jul 2017
Details of encumbrancesFile: Encumbrances_Index II_Karegaon.pdf14 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Form 1_A2-1(Onyx)1.pdf14 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Form 1_A2-2(Moonstone)1.pdf14 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Form 1_A2-3(Jet)1.pdf14 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate_Form 1_A2-4(Jasper)1.pdf14 Jul 2017
Layout approvalFile: Karegaon Revised Plan-1.pdf8 Jul 2017
PAN CardFile: PAN- Playtor Lifespaces-.pdf8 Jul 2017
Copy of the legal title reportFile: Title Certificate_Karegaon.pdf8 Jul 2017
Copy of Layout Approval (in case of layout)File: Karegaon Revised Plan-1.pdf8 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Karegaon.pdf6 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Playtor Ranjangaon- Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Karegaon13,700+ in Pune

2 kmPlaytor Ranjangaon- PhasLapsed / revoked 3Other 1Dot size: filed unitsN

Filed coordinates, straight-line distance. 4 registered projects within 2 km.

Builder: PLAYTOR LIFESPACES PRIVATE LIMITED

PLAYTOR LIFESPACES PRIVATE LIMITED has 3 registrations on MahaRERA, including Playtor Ranjangaon- Phase 1 and Playtor Ranjangaon- Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Playtor Ranjangaon- Phase 1 is delayed beyond 31 Dec 2017?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Playtor Ranjangaon- Phase 1?

The registered promoter entity is PLAYTOR LIFESPACES PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Playtor Ranjangaon- Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Playtor Ranjangaon- Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Playtor Ranjangaon- Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Playtor Ranjangaon- Phase 1?

The professionals named in the filing: Architect: SANDEEP HARDIKAR & ASSOCIATES; Engineer: SSPA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Playtor Ranjangaon- Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Playtor Ranjangaon- Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Playtor Ranjangaon- Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.