Home / Browse projects / Bengaluru Urban, Karnataka / PLATINUM GARDENIA
PLATINUM GARDENIA
RG-KA-53886 · RERA PRM/KA/RERA/1251/310/PR/181022/002088
Source: official RERA Karnataka filing
Red flags
- Completion date moved by 9 months
- 1 extension taken
Clear
- No complaints on record
- Separate project account declared
Saved.
PLATINUM GARDENIA is a Residential/Group Housing project by SAI PROPERTIES in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/181022/002088 on 22 Oct 2018. Possession is promised by 30 Sep 2021. The completion date has moved by 9 months from the original filing.
At a glance
Project
- NamePLATINUM GARDENIA
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/181022/002088
- ReraGenie IDRG-KA-53886
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on22 Oct 2018
- Promised completion30 Sep 2021
- Revised completionRevised to 30 Sep 2021 (originally 31 Dec 2020)
- Buildings3 building records
- Documents filed32 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | - | - | - | 50 | 0 | 50 |
| B | - | - | - | 78 | 0 | 78 |
| C | - | - | - | 50 | 0 | 50 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Sub Structure Flooring Finishing | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities35
Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | Yes | - |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aslam Architect and Interior Designer Pvt Ltd ( Ani Sambyal Singh ) |
| Engineer | Aslam Architect and Interior Designer Pvt Ltd ( Ani Sambyal Singh ) |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed32
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/181022/002088 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CertificateFile: REGISTRATION ACK COPY.pdf | - |
| PLAN SANCTION | - |
| Temp00016 | - |
| PLAN SANCTION | - |
| 13-06-12 - 2A 10 G - NO 2195 - CHANDRA MOHAN REDDY | - |
| Temp00016 | - |
| PLAN SANCTION | - |
| ALLOTMENT LETTER - SAI PROPERTIES | - |
| PLAN SANCTION | - |
| IMG-20180514-WA0021 | - |
| KATHA CERTIFICATE | - |
| CONVERSION ORDER | - |
| BWSSB | - |
| NOC - KARNATAKA STATE CONTROL POLLTION BOARD | - |
| PLAN SANCTION | - |
| Temp00016 | - |
| CONVERSION ORDER | - |
| Balance Sheet 2016 - 2017File: BALANCE SHEET 2016-17.pdf | - |
| Balance Sheet 2015 - 2016File: BALANCE SHEET FY 2015-16.pdf | - |
| Balance Sheet 2014 - 2015File: BALANCE SHEET FY 2014-15.pdf | - |
| Audited Profit and Loss Statement 2016 - 2017File: PROFIT & LOSS ACCOUNT - 2016-17.pdf | - |
| Income Tax Return Acknowledgement 2016 - 2017File: 1617 - SAI PROPERTIES_24-Feb-2018_410611190.pdf | - |
| Income Tax Return Acknowledgement 2015 - 2016File: 1516- SAI PROPERTIES_31-Mar-2017_737420630 (1).pdf | - |
| Income Tax Return Acknowledgement 2014 - 2015File: 1415 - SAI PROPERTIES_31-Mar-2017_736581320.pdf | - |
| FORM- B -SAI PROPERTIES | - |
| Prospectus/BrochureFile: Gardenia Broucher_.pdf | - |
| Advertisement Copy 1File: Adv.jpeg | - |
| Tower Excel SheetFile: PRMKARERA1251310PR181022002088.xlsx | - |
| Occupancy CertificateFile: OCCUPANCY CERTIFICATE - SAI PROPERTIES (3).pdf | - |
| Architect certificate for having completed the work(in format no 5)File: AA2.pdf | - |
| Chartered Accountant certificate for having completed the work(in format no 4)File: CA2.pdf | - |
| Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: OCCUPANCY CERTIFICATE - SAI PROPERTIES (3).pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep PLATINUM GARDENIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: SAI PROPERTIES
SAI PROPERTIES has 3 registrations on RERA Karnataka, including PLATINUM GARDENIA and PLATINUM LANDMARK. Its filings declare 2 earlier projects, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if PLATINUM GARDENIA is delayed beyond 30 Sep 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of PLATINUM GARDENIA?
The registered promoter entity is SAI PROPERTIES, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in PLATINUM GARDENIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at PLATINUM GARDENIA?
The professionals named in the filing: Architect: Aslam Architect and Interior Designer Pvt Ltd ( Ani Sambyal Singh ); Engineer: Aslam Architect and Interior Designer Pvt Ltd ( Ani Sambyal Singh ). Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PLATINUM GARDENIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback