PITAJI NAGARI PHASE III
RG-MH-08744 · RERA P52300021821 · Last updated on MahaRERA portal: 17 Nov 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Beed registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PITAJI NAGARI PHASE III is a Residential / Group Housing project by S R CONSTRUCTION in Beed, Maharashtra, registered with MahaRERA as P52300021821 on 29 Jul 2019. Possession was promised by 30 Dec 2024 and is now 22 months past that date.
At a glance
Project
- NamePITAJI NAGARI PHASE III
- TypeResidential / Group Housing
- Location
- POKHRI ROAD
- JOGAIWADI
- Ambajogai (Rural)
- Ambejogai
- Beed
- 431517
- Pincode431517
- RERA no.P52300021821
- ReraGenie IDRG-MH-08744
Builder
- NameS R CONSTRUCTION
- Entity typePartnership
- PartnersASHABAI SHIVPRASAD LAHOTI, SHIVPRASAD RAMBHALALJI LAHOTI
- Other registrations7 more →
- Completed5 of 8
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on29 Jul 2019
- Promised completion30 Dec 2024
- Revised completionNone
- Buildings4 building records
- Documents filed31 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A-TYPE ROW BUNGALOW | NA | 22 | 0 | 0 | 0 | 0 |
| B-TYPE ROW BUNGALOW | NA | 11 | 0 | 0 | 0 | 0 |
| C-TYPE ROW BUNGALOW | NA | 11 | 0 | 0 | 0 | 0 |
| D-TYPE BUILDING | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 17 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
36 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.
A-TYPE ROW BUNGALOW82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B-TYPE ROW BUNGALOW82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
C-TYPE ROW BUNGALOW82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
D-TYPE BUILDING82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 17 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed25
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| B-TYPE ROW BUNGALOW | 0 | 11 | 11 |
| C-TYPE ROW BUNGALOW | 0 | 11 | 11 |
| D-TYPE BUILDING | 1 | 2 | 3 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MANOJ MOHANLAL LAKHERA | Ambejogai (M Cl) | Beed |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANIRUDDHA DESHMUKH |
| Partner | Role in project |
|---|---|
| S R CONSTRUCTION | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jul 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Jul 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Jul 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Jul 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed31
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Details of encumbrances concerned to FinanceFile: Encumbrance Concerned to Legal.pdf | 17 Nov 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Concerned to Legal.pdf | 17 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Account Declaration.pdf | 17 Nov 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter.pdf | 17 Nov 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report ATS.pdf | 17 Nov 2023 |
| PAN CardFile: SR Construction PAN.PDF | 16 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 22-23 NEW.pdf | 16 Nov 2023 |
| CERSAI detailsFile: CERSAI Phase 3.pdf | 16 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23.pdf | 16 Nov 2023 |
| Proforma of Agreement for saleFile: ATS Phase III.pdf | 16 Nov 2023 |
| Declaration about Commencement CertificateFile: Declaration About CC (Format D).pdf | 15 May 2023 |
| Disclosure of sold/ booked inventoryFile: Disclorsure of Sold Unsold Inventory.pdf | 15 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CA Certificate Form 5 FY 19-20.pdf | 15 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Certificate Form 5 FY 20-21.pdf | 15 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Certificate Form 5 FY 21-22.pdf | 15 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate 2A FY 19-20.pdf | 12 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Certificate 2A FY 20-21.pdf | 12 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer Certificate 2A FY 21-22.pdf | 12 May 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Pitaji Sarda Nagari Phase 1, 2 and 3 Society Meeting_compressed.pdf | 25 Jul 2022 |
| Details of encumbrancesFile: Revised No Encumbrace.pdf | 18 Dec 2020 |
| Building plan approvalFile: Building Plan_compressed.pdf | 20 Jul 2019 |
| Layout approvalFile: Layout_compressed.pdf | 20 Jul 2019 |
| Copy of the legal title reportFile: Search Report Lakhera_compressed.pdf | 20 Jul 2019 |
| Details of encumbrancesFile: No Encumbrance Certificate.pdf | 20 Jul 2019 |
| Copy of Layout Approval (in case of layout)File: Layout_compressed.pdf | 20 Jul 2019 |
| Building Plan Approval (IOD)File: Building Plan_compressed.pdf | 20 Jul 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_compressed (1).pdf | 20 Jul 2019 |
| Declaration in FORM BFile: Developer Form B_compressed.pdf | 20 Jul 2019 |
| Certificates of CA (Form 3)File: CA Certificate.PDF | 20 Jul 2019 |
| Proforma of Allotment letterFile: ATS Phase III.pdf | 20 Jul 2019 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 20 Jul 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Beed
Computed across the 95 Beed projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations, which the RERA portal never shows together
- All 31 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep PITAJI NAGARI PHASE III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near JOGAIWADI95 in Beed
Construction of 244 EWS and 70 Shops under PMA
AURANGABAD HOUSING AND AREA DEVELOPMENT BO
NATH REGENCY
KAZI SANGHANI AND BAGWAN CONSTRUCTION
BUNDINAGAR
PRASHANT MORESHWARRAO KULKARNI
BK BUNGALOWS
SHANKAR LAXMAN KARAD AND BHAGWAN DATTU BAR
FORTUNE TOWER
KAZI SANGHANI AND BAGWAN
Modi Dham
Bhushan kantaprasad Modi
Builder: S R CONSTRUCTION
S R CONSTRUCTION has 8 registrations on MahaRERA, including PITAJI NAGARI and PITAJI NAGARI PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Beed district page.
Frequently asked questions
What does it mean that PITAJI NAGARI PHASE III shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PITAJI NAGARI PHASE III is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PITAJI NAGARI PHASE III?
The registered promoter entity is S R CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PITAJI NAGARI PHASE III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PITAJI NAGARI PHASE III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PITAJI NAGARI PHASE III?
The professionals named in the filing: Architect: ANIRUDDHA DESHMUKH. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PITAJI NAGARI PHASE III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback