ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / PIONEER KINGSTOWN

Registration approved Residential/Group Housing project

PIONEER KINGSTOWN

By PIONEER DEVELOPERS

RG-KA-42779 · RERA PRM/KA/RERA/1251/308/PR/171026/000266

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 15 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Sep 2022Possession promisedmoved 15 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 55 documents Report an error

PIONEER KINGSTOWN is a Residential/Group Housing project by PIONEER DEVELOPERS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/171026/000266 on 26 Oct 2017. Possession is promised by 30 Sep 2022. The completion date has moved by 15 months from the original filing.

At a glance

Project

  • NamePIONEER KINGSTOWN
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/308/PR/171026/000266
  • ReraGenie IDRG-KA-42779

Builder

  • NamePIONEER DEVELOPERS
  • Entity typePartnership Firm
  • Authorized SignatoryY. HANUMANTHA REDDY
  • OthersY. HANUMANTHA REDDY
  • Other registrations1 more →

Key dates

this monthRegisteredOct 2017First promiseJun 2021Revised toSep 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on26 Oct 2017
  • Promised completion30 Sep 2022
  • Revised completionRevised to 30 Sep 2022 (originally 13 Jun 2021)
  • Buildings1 building record
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PIONEER KINGSTOWN---81081

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Ground Clearance-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,046 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 25.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSECANT ARCHITECTS LLP
EngineerP. RAMAKRISHNA

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJun 2021 → Mar 2022

No reason recorded in the filing

EX/PRM/KA/RERA/1251/308/PR/230315/000266Mar 2022 → Sep 2022

Reason as filed by the promoterAwaiting OC

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed55

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/171026/000266 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: FROM D cerificate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Architect Certificate for Completed work.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engg Certificate for Completed work.pdf-
CA Certificate for Funds UtilizationFile: CA Funds Utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Architect Certificate for Pending work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engg Certificate pending work.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Funds Required.pdf-
AffidavitFile: Form B Affidavit.pdf-
Latest Encumbrance CertificateFile: EC.jpeg-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: OC Kingstown.pdf-
Document 2File: OC applied.pdf-
BBMP Katha & katha extrat-
kinstown sanction plan-
kinstown sanction plan-
SALE DEED-
SALE AGREEMENT-
BBmp tax paid 2017-2018-
kinstown sanction plan-
kinstown sanction plan-
ALLOTMENT LETTER - Copy-
Pioneer Kingston SF Brochure_Ver 2_inside-
NOC DOCUMENTS-
SPECIFICATIONS-
KIngstown EC-
BBMP Katha & katha extrat-
JOINT DEVELOPMENT AGREEMENT-
Balance Sheet 2015 - 2016File: balance sheet Fy2015-2016.pdf-
Balance Sheet 2014 - 2015File: balance sheet FY2014-2015.pdf-
Balance Sheet 2013 - 2014File: Balance sheey 2013-2014.pdf-
Audited Profit and Loss Statement 2015 - 2016File: profit &loss Fy2015-2016.pdf-
Audited Profit and Loss Statement 2014 - 2015File: profit &loss Ac Fy2014-2015.pdf-
Audited Profit and Loss Statement 2013 - 2014File: profit &loss fy2013-2014.pdf-
Auditor's Report 2015 - 2016File: FY2015-2016 Audit report.pdf-
Auditor's Report 2014 - 2015File: Reports 3CD &3CA Fy2014-2015.pdf-
Auditor's Report 2013 - 2014File: REports 3CD &3 CAFY2013-2014.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: income tax acknowledgement Fy2015-2016.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: income tax acknowldegement Fy2014-2015.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: income tax acknowledgement Fy2015-2016.pdf-
Form B-
Prospectus/BrochureFile: Broucher.pdf-
Advertisement Copy 1File: 99acres advertisement.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_308_PR_171026_000266.xlsx-
Loan raised documentFile: Bank Loan NOC.pdf-
NOC issued by the Fire Force department after completion of workFile: FIRE NOC.pdf-
Occupancy CertificateFile: OC Kingstown.pdf-
Consent for operation issued by KSPCBFile: KSPCB NOC.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: BESCOm.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: BESCOm.pdf-
Architect certificate for having completed the work(in format no 5)File: Architect Certificate.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: FROM4CC KINGSTOWN.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Closure Affidavit.pdf-
Engineer CertificateFile: Civil Engineering Cerificate.pdf-
BSNLFile: BSNL.pdf-
AIRPORT NOCFile: AIRPORT NOC.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 15 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep PIONEER KINGSTOWN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: PIONEER DEVELOPERS

PIONEER DEVELOPERS has 2 registrations on RERA Karnataka, including PIONEER KINGSTOWN and PIONEER ETERNIS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if PIONEER KINGSTOWN is delayed beyond 30 Sep 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of PIONEER KINGSTOWN?

The registered promoter entity is PIONEER DEVELOPERS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in PIONEER KINGSTOWN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at PIONEER KINGSTOWN?

The professionals named in the filing: Architect: SECANT ARCHITECTS LLP; Engineer: P. RAMAKRISHNA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PIONEER KINGSTOWN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PIONEER KINGSTOWN. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PIONEER KINGSTOWN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.