Home / Browse projects / Bengaluru Urban, Karnataka / PERODY CLASSIC
PERODY CLASSIC
By M/S PERODY BUILDERS PVT LTD
RG-KA-37569 · RERA PRM/KA/RERA/1251/310/PR/181010/002044 · Last updated on RERA Karnataka portal: 23 Feb 2022
Source: official RERA Karnataka filing
Red flags
- 2 complaints at RERA Karnataka
- Completion date moved by 32 months
- 3 extensions taken
Clear
- Separate project account declared
Saved.
PERODY CLASSIC is a Residential/Group Housing project by M/S PERODY BUILDERS PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/181010/002044 on 10 Oct 2018. Possession is promised by 30 Nov 2023. The completion date has moved by 32 months from the original filing. 2 complaints are on record with the regulator.
At a glance
Project
- NamePERODY CLASSIC
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/181010/002044
- ReraGenie IDRG-KA-37569
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on10 Oct 2018
- Promised completion30 Nov 2023
- Revised completionRevised to 30 Nov 2023 (originally 1 Mar 2021)
- Buildings1 building record
- Documents filed188 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PERODY CLASSIC | - | - | - | 228 | 0 | 228 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 23 Feb 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | - |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | - |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities33
As on 23 Feb 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | Yes | - |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | Yes | - |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | Yes | - |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Reason as filed by the promoterApplied for modification
No reason recorded in the filing
Complaints filed with RERA Karnataka2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00966/2023 | - | M/S PERODY BUILDERS PVT LTD | 26/06/2023 |
| 00967/2023 | - | M/S PERODY BUILDERS PVT LTD | 26/06/2023 |
Documents filed188
As listed on the registration, under the names the promoter filed them with; the newest 80 of 188 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/181010/002044 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| BANK CONFIRMATIONFile: BANK CONFIRMATION.pdf | 23 Feb 2022 |
| BANK CONFIRMATIONFile: DECLARATION20220223_16275652.pdf | 23 Feb 2022 |
| 1)CONSENT LETTERFile: MOD CONSENT LETTER 120220223_11521114.pdf | 23 Feb 2022 |
| 1) CONSENT LETTERFile: MOD CONSENT LETTER 220220223_12045431.pdf | 23 Feb 2022 |
| 1) CONSENT LETTERFile: MOD CONSENT LETTER 320220223_12084788.pdf | 23 Feb 2022 |
| 1) CONSENT LETTERFile: MOD CONSENT LETTER 420220223_12134281.pdf | 23 Feb 2022 |
| 1) CONSENT LETTERFile: MOD CONSENT LETTER 520220223_12184667.pdf | 23 Feb 2022 |
| 1) CONSENT LETTERFile: MOD CONSENT LETTER 620220223_12270265.pdf | 23 Feb 2022 |
| 2) DEVELOPEMENT DETAILSFile: DEVELOPEMENT DETAILS AS PER MODIFIED PLAN.xlsx | 23 Feb 2022 |
| 3) AGREEMENT OF SALEFile: Agreement of Sale-converted.pdf | 23 Feb 2022 |
| 3) AGREEMENT OF SALEFile: DECLARATION20220223_16275652.pdf | 23 Feb 2022 |
| 4) STPFile: STP20211211_15502204.pdf | 23 Feb 2022 |
| 1.1 BANK CONFIRMATIONFile: BANK CONFIRMATION.pdf | 29 Jan 2022 |
| 2.1 LICENCEFile: LICENSE LETTER20220129_12313675.pdf | 29 Jan 2022 |
| 2.2 COMMENCEMENT CERTIFICATEFile: COMMENCEMENT CERTIFICATE.pdf | 29 Jan 2022 |
| 2.3 BUILDING DRAWINGS MODIFIEDFile: BASEMENT.pdf | 29 Jan 2022 |
| 2.3 BUILDING DRAWING MODIFIEDFile: GROUND AND FIRST FLOOR.pdf | 29 Jan 2022 |
| 2.3 BUILDING DRAWING MODIFIEDFile: 2ND 3RD & 5TH FLOOR.pdf | 29 Jan 2022 |
| 2.3 BUILDING DRAWING MODIFIEDFile: 4TH 6TH & 7TH FLOOR.pdf | 29 Jan 2022 |
| 2.3 BUILDING DRAWING MODIFIEDFile: 8TH FLOOR.pdf | 29 Jan 2022 |
| 3.1 EXTENSION OF PROJECTFile: Extension of Perody Classic20211111_13015421.pdf | 29 Jan 2022 |
| 3.2 CONSENT LETTERFile: CONSENT LETTER 220220129_12061428.pdf | 29 Jan 2022 |
| 3.2 CONSENT LETTERFile: CONSENT LETTER 320220129_12221431-1-45.pdf | 29 Jan 2022 |
| 3.2 CONSENT LETTERFile: CONSENT LETTER 320220129_12221431-46-70.pdf | 29 Jan 2022 |
| 3.2 CONSENT LETTERFile: CONSENT LETTER20220129_11563695.pdf | 29 Jan 2022 |
| 3.3 BREAK UP DEVELOPMENTFile: BREAK UP DEVELOPMENT AS PER MODIFIED PLAN20220108_16272306.pdf | 29 Jan 2022 |
| 3.4 FIRE NOCFile: fire_compressed 5MB.pdf | 29 Jan 2022 |
| 3.6 PROFORMA OF AGREEMENT OF SALEFile: RERA FINAL AGREEMENT TO SELL.pdf | 29 Jan 2022 |
| 3.7 PROFORMA OF SALE DEEDFile: RERA ABSSOLUTE SALE DEED.pdf | 29 Jan 2022 |
| 3.8 ALLOTMENT LETTERFile: ALLOTEMENT LETTER20220129_16452698.pdf | 29 Jan 2022 |
| 3.8 BROCHUREFile: brochure (1).pdf | 29 Jan 2022 |
| 3.9 STPFile: STP20211211_15502204.pdf | 29 Jan 2022 |
| FORM NO 4 CHARTERED ACCOUNTANTFile: RERA Form-4 Q3_Attested.pdf | 14 Jan 2022 |
| CHANGE OF BANK ACCOUNTFile: CHANGE OF BANK MERGE20220108_15174547.pdf | 14 Jan 2022 |
| NOTEFile: NOTE20220114_17242003.pdf | 14 Jan 2022 |
| CHANGE OF BANK ACCOUNTFile: CHANGE OF BANK MERGE20220108_15174547.pdf | 8 Jan 2022 |
| BANK STATEMENTFile: BANK STATEMENT 1.pdf | 8 Jan 2022 |
| BANK STATEMENTFile: BANK STATEMENT 2.pdf | 8 Jan 2022 |
| BANK STATEMENTFile: BANK STATEMENT 3.pdf | 8 Jan 2022 |
| BANK STATEMENTFile: BANK STATEMENT 4.pdf | 8 Jan 2022 |
| BANK STATEMENTFile: BANK STATEMENT 5.pdf | 8 Jan 2022 |
| QUATERLY UPDATE DETAILFile: QUATERLY UPDATE DETAIL20220108_15203980.pdf | 8 Jan 2022 |
| 1) DRAWING AS PER MODIFIED PLANFile: SITE PLAN SY NO 90.pdf | 8 Jan 2022 |
| 1) DRAWING AS PER MODIFIED PLANFile: BASEMENT.pdf | 8 Jan 2022 |
| 1) DRAWING AS PER MODIFIED PLANFile: GROUND AND FIRST FLOOR.pdf | 8 Jan 2022 |
| 1) DRAWING AS PER MODIFIED PLANFile: 2ND 3RD & 5TH FLOOR.pdf | 8 Jan 2022 |
| 1) DRAWING AS PER MODIFIED PLANFile: 4TH 6TH & 7TH FLOOR.pdf | 8 Jan 2022 |
| 1) DRAWING AS PER MODIFIED PLANFile: 8TH FLOOR.pdf | 8 Jan 2022 |
| 3) COMMENCEMENT CERTIFICATEFile: Commencement Certificate.pdf | 8 Jan 2022 |
| 1) CONSENT LETTERFile: consent letter 3.pdf | 8 Jan 2022 |
| 1) CONSENT LETTERFile: consent letter 4.pdf | 8 Jan 2022 |
| 1) CONSENT LETTERFile: consent letter 5.pdf | 8 Jan 2022 |
| 1) CONSENT LETTERFile: consent letter 6.pdf | 8 Jan 2022 |
| 1) CONSENT LETTERFile: consent letter 7.pdf | 8 Jan 2022 |
| 1) CONSENT LETTERFile: consent letter 1.pdf | 8 Jan 2022 |
| 1) CONSENT LETTERFile: consent letter 8.pdf | 8 Jan 2022 |
| 2) ENGINEER CONTRACTOR ARCHITECTFile: ENGINEEER CONTRACTOR ARCHITECT DETAIL20220108_15455303.pdf | 8 Jan 2022 |
| 3) UNIT DETAIL AS PER MODIFIED PLANFile: UNIT DETAILS20220108_16221353.pdf | 8 Jan 2022 |
| 3) ABSTRACT SOLD AND UNSOLDFile: ABSTRACT SOLD AND UNSOLD20220108_16241849.pdf | 8 Jan 2022 |
| BREAK UP DEVELOPMENT AS PER MODIFIED PLANFile: BREAK UP DEVELOPMENT AS PER MODIFIED PLAN20220108_16272306.pdf | 8 Jan 2022 |
| BREAK UP DEVELOPMENT AS PER REGISTERED PLANFile: BREAK UP DEVELOPMENT AS PER REGISTERED PLAN 20220108_16312038.pdf | 8 Jan 2022 |
| LATITUDE AND LONGITUDEFile: LATITUDE LONGITUDE TETAIL20220108_15194099.pdf | 8 Jan 2022 |
| PROJECT MEMBER DETAILFile: PROJECT MEMBER DETAIL20220108_15465364.pdf | 8 Jan 2022 |
| BESCOMFile: BESCOM DETAIS.pdf | 8 Jan 2022 |
| BWSSBFile: BWSSB RECEIPT20220108_12375026.pdf | 8 Jan 2022 |
| BSNLFile: BSNL.pdf | 8 Jan 2022 |
| 2)BUILDING DRAWING AS PER REGISTERED PLANFile: LOWER BASEMENT 1 OF 5.pdf | 8 Jan 2022 |
| 2) DRAWING AS PER REGISTERED PLANFile: UPPER & GROUND 2 OF 5.pdf | 8 Jan 2022 |
| 2) DRAWING AS PER REGISTERED PLANFile: FIRST & SECOND 3 OF 5.pdf | 8 Jan 2022 |
| 2) DRAWING AS PER REGISTERED PLANFile: THIRD FLOOR TO SIXTH 4 OF 5.pdf | 8 Jan 2022 |
| 2) DRAWING AS PER REGISTERED PLANFile: TERRACE FLOOR 5 OF 5.pdf | 8 Jan 2022 |
| CA CERTIFICATE FOR CHANGE IN THE BANK ACCOUNTFile: Change in Bank particulars_CA Attested.pdf | 6 Jan 2022 |
| CA CERTIFICATEFile: CA EX-3.pdf | 20 Dec 2021 |
| CA CERTIFICATEFile: CA EX-4.pdf | 20 Dec 2021 |
| 2.1 CONTRACTOR DETAILSFile: DETAILS20211211_12231867.pdf | 13 Dec 2021 |
| 2.2 STP DRAWINGFile: STP20211211_15502204.pdf | 13 Dec 2021 |
| 2.3 SOLD AND UNSOLD FLAT DETAILSFile: SOLD DETAILS.pdf | 13 Dec 2021 |
| 1.(1)CA CERTIFICATEFile: EX-3.pdf | 19 Nov 2021 |
| 1.(1)CA CERTIFICATEFile: Form Ex-4.pdf | 19 Nov 2021 |
| 1.(2)BANK STATEMENTFile: BANK ACCOUNT STATEMENT.pdf | 19 Nov 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep PERODY CLASSIC on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: M/S PERODY BUILDERS PVT LTD
M/s Perody Builders Pvt Ltd has 2 registrations on RERA Karnataka, including Perody Peepal Tree and PERODY CLASSIC. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if PERODY CLASSIC is delayed beyond 30 Nov 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of PERODY CLASSIC?
The registered promoter entity is M/S PERODY BUILDERS PVT LTD, a company as per the filing. Its CIN U45201KA2001PTC029558 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in PERODY CLASSIC?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PERODY CLASSIC?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
What should I check before booking in PERODY CLASSIC?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback