ReraGenieLog inGet a buyer report

Home / Browse projects / Sangli, Maharashtra / PENTAGON-GANPATI SAHANIWAS

Completed No litigation declared Residential / Group Housing project

PENTAGON-GANPATI SAHANIWAS

By PENTAGON INFRASTRUCTURE

RG-MH-16415 · RERA P53100026204 · Last updated on MahaRERA portal: 16 Mar 2022

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 15 documents Report an error

PENTAGON-GANPATI SAHANIWAS is a Residential / Group Housing project by PENTAGON INFRASTRUCTURE in Sangli, Maharashtra, registered with MahaRERA as P53100026204 on 29 Aug 2020. The registration is recorded completed; possession was promised by 30 Mar 2023.

At a glance

Project

  • NamePENTAGON-GANPATI SAHANIWAS
  • TypeResidential / Group Housing
  • Location
    • BEHIND TULUNADU BHAVAN SANGLI MIRAJ ROAD MIRAJ
    • NEAR KRUPAMAI HOSPITAL OPP BHOKARE COLLAGE
    • Sangli Miraj Kupwad (M Corp.)
    • Miraj
    • Sangli
    • 416410
  • Pincode416410
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100026204
  • ReraGenie IDRG-MH-16415

Builder

  • NamePENTAGON INFRASTRUCTURE
  • Entity typePartnership
  • PartnersDILIP SHAMRAO PATIL, RAMCHANDRA PANDURANG MORE, BASAVESHWAR MAHALINGAYYA SWAMI
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredAug 2020PromisedMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Aug 2020
  • Promised completion30 Mar 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed15 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PENTAGON-GANPATI SAHANIWASNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Mar 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

PENTAGON-GANPATI SAHANIWAS: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Mar 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes4%

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered4
Open Space4

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area303 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
AMIT APPASAHEB JAGDALESangli Miraj Kupwad (M Corp.)Sangli

Approvals and building plan

Permissible FSI427.59
Proposed, not sanctioned428 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSANGLI MIRAJ ROAD VIJAYNAGAR CHOWK WANLESSWADI SANGLI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSURESH G SAKHARE
Engineersandeep a mahadik
Chartered Accountantshriniwas bhosale
PartnerRole in project
PENTAGON INFRASTRUCTURE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Aug 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Aug 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Aug 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Aug 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Mar 2022

Documents filed15

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: form 4.pdf16 Mar 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: permission certificate.pdf15 Mar 2022
Status of ConveyanceFile: pentagon ganpati declaration deed.pdf15 Mar 2022
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf4 Nov 2020
Layout approvalFile: NAKASHA.pdf19 Aug 2020
Building plan approvalFile: DWG.pdf19 Aug 2020
PAN CardFile: pan card pentagon.pdf19 Aug 2020
Copy of the legal title reportFile: search report.pdf19 Aug 2020
Details of encumbrancesFile: encumbrance cert.pdf19 Aug 2020
Copy of Layout Approval (in case of layout)File: NAKASHA.pdf19 Aug 2020
Building Plan Approval / NA Order for plotted developmentFile: DWG.pdf19 Aug 2020
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION CERTIFICATE.pdf19 Aug 2020
Declaration in FORM BFile: FORM B PENTAGON.pdf19 Aug 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE NEW.pdf19 Aug 2020
Proforma of Allotment letterFile: allotment letter PENT.pdf19 Aug 2020

How this compares with Sangli

11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is completed

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep PENTAGON-GANPATI SAHANIWAS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR KRUPAMAI HOSPITAL OPP BHOKARE COLLAGE790+ in Sangli

2 kmPENTAGON-GANPATI SAHANIWCompleted 19Lapsed / revoked 11Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 48 registered projects within 2 km.

Builder: PENTAGON INFRASTRUCTURE

PENTAGON INFRASTRUCTURE has 2 registrations on MahaRERA, including PENTAGON SHARADA and PENTAGON-GANPATI SAHANIWAS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if PENTAGON-GANPATI SAHANIWAS is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PENTAGON-GANPATI SAHANIWAS?

The registered promoter entity is PENTAGON INFRASTRUCTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PENTAGON-GANPATI SAHANIWAS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PENTAGON-GANPATI SAHANIWAS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PENTAGON-GANPATI SAHANIWAS?

The professionals named in the filing: Architect: SURESH G SAKHARE; Engineer: sandeep a mahadik; Chartered Accountant: shriniwas bhosale. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PENTAGON-GANPATI SAHANIWAS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PENTAGON-GANPATI SAHANIWAS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PENTAGON-GANPATI SAHANIWAS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.