Red flags

  • No red flags in this filing

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Nov 2023Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 59 documents Report an error

PENTA SQUARE is a Commercial project by Rajarajeshware builddcon pvt ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/210409/004108 on 9 Apr 2021. Possession is promised by 30 Nov 2023.

At a glance

Project

  • NamePENTA SQUARE
  • TypeCommercial
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/210409/004108
  • ReraGenie IDRG-KA-87935

Builder

  • NameRajarajeshware builddcon pvt ltd
  • Entity typeCompany
  • Authorized SignatoryRamanlal M Sha
  • Other registrations3 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredApr 2021PromisedNov 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on9 Apr 2021
  • Promised completion30 Nov 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PENTA SQUARE---055

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 8 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 8 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,119 sq m
Named landowners1
LandownerVillageDistrict
Dayanand--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 13.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr.Indraneel dutta
EngineerJAYANTI SENTHIL

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed59

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/210409/004108 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Affidavit Cum declarationFile: Affidavit - Penta Square.pdf8 Nov 2024
Annual AuditFile: Form 7 Penta Square - 2023-2024.pdf8 Nov 2024
BALANCE SHEET WITH UDIN NUMBERFile: Balance Sheet.pdf22 Mar 2021
PROFIT AND LOSS WITH UDIN NUMBERFile: Profit & Loss account.pdf22 Mar 2021
CASH FLOW STATEMENT WITH UDIN NUMBERFile: Cashflow Statement.pdf22 Mar 2021
Enclosed BMP katha as the jurisdiction has changed from panchayath to Bangalore Mahanagara PalikeFile: Srinivasa Reddy corporation & BMP katha.pdf22 Mar 2021
EC 2016 TO 2021File: EC 2016 to 2021.pdf22 Mar 2021
PLAN LICENSE LETTERFile: bbmp license.pdf22 Mar 2021
CertificateFile: Incorporation certificate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Arch - completion.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engineer certificate work completed.jpeg-
CA Certificate for Funds UtilizationFile: Ca Certificate - fund Utilization.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arch - Pending Work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engineer certificate work pending.jpeg-
CA Certificate for Funds required for Project CompletionFile: Ca Certificate - fund Required.pdf-
AffidavitFile: Seeking extension affidavit.pdf-
Latest Encumbrance CertificateFile: ECC.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: Affidavit - Penta Square.pdf-
sanction drg-
sanction drg-
Proforma of sale deed-
Proforma of sale deed-
Sale deed-
RRBC Section-
allotment letter-
penta square brochure approved blue opt 1-
Penta Square Specifications-
EC from 2004 to 2016-
Affidavit-
Joint Affidavit-
Khatha Certificate & extract-
JDA-
BWSSB - NOC (2)_compressed-
CFE-
Unnamed document-
RRBC Section-
Balance Sheet 2019 - 2020File: Balance Sheet.pdf-
Balance Sheet 2018 - 2019File: Balance Sheet 2018-19.pdf-
Balance Sheet 2017 - 2018File: Balance Sheet 2017-18.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Profit & Loss.pdf-
Audited Profit and Loss Statement 2018 - 2019File: Profit & Loss 2018-19.pdf-
Audited Profit and Loss Statement 2017 - 2018File: Profit & Loss 2017-18.pdf-
Director's Report 2018 - 2019File: Director Report 2018-19.pdf-
Director's Report 2017 - 2018File: Directors Report 2017-18 .pdf-
Cash Flow Statement 2019 - 2020File: Cash Flow Statement.pdf-
Cash Flow Statement 2018 - 2019File: Cash Flow statement 2018-19.pdf-
Auditor's Report 2019 - 2020File: AUDITORS REPORT.pdf-
Auditor's Report 2018 - 2019File: Audit Report 2018-19.pdf-
Auditor's Report 2017 - 2018File: Audit Report 2017-18.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR Acknowledgment.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ITR Acknowledgment 2018-19.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR Acknowledgent 2017-18.pdf-
Form B_compressed-
Prospectus/BrochureFile: PS_Brochure.pdf-
Advertisement Copy 1File: PS-ADV.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_210409_004108 (1).xlsx-
Occupancy CertificateFile: OC_PENTA LANDMAARK.pdf-
Completion certificate issued by the competent authorityFile: OC_PENTA LANDMAARK.pdf-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
Prashanti BaluEnclave-OngoingAug 2021Not delivered

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep PENTA SQUARE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmPENTA SQUAREOther 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 9 registered projects within 2 km.

Builder: Rajarajeshware builddcon pvt ltd

Rajarajeshware Builddcon Pvt Ltd has 4 registrations on RERA Karnataka, including Prashanti Balu Enclave and PANCHSHEEL ENCLAVE. Its filings declare 3 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if PENTA SQUARE is delayed beyond 30 Nov 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of PENTA SQUARE?

The registered promoter entity is Rajarajeshware builddcon pvt ltd, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in PENTA SQUARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at PENTA SQUARE?

The professionals named in the filing: Architect: Mr.Indraneel dutta; Engineer: JAYANTI SENTHIL. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PENTA SQUARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PENTA SQUARE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PENTA SQUARE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.