Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
PAVANI MIRABILIA PHASE III is a Residential/Group Housing project by Sai Sravanthi Infra Projects Pvt Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/240626/008750 on 24 Jun 2026. Possession is promised by 3 Mar 2031. 0 of the 239 units on this registration are recorded sold or booked, and 0 of 17 construction stages are filed complete.
At a glance
Project
- NamePAVANI MIRABILIA PHASE III
- TypeResidential/Group Housing
- Location
- Bengaluru East
- Bengaluru Urban
- 546004
- Pincode546004
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/446/PR/240626/008750
- ReraGenie IDRG-KA-00866
Builder
- NameSai Sravanthi Infra Projects Pvt Ltd
- Entity typeCompany
- CINU45203TG2008PTC060151
- GSTIN29AAPCS0464C1Z9
- Authorized SignatoryP V RAGHAVA RAO
- Managing DirectorP V RAGHAVA RAO
- DirectorsP V RAGHAVA RAO, P PAVANI, D PAVANKUMAR
- Project HeadRamesh Reddy K
- Other registrations3 more →
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on24 Jun 2026
- Promised completion3 Mar 2031
- Revised completionNone
- Buildings1 building record
- Documents filed114 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER F | - | - | - | 239 | 0 | 239 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 17 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 75%.
Building: 8% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 75% |
| Foundation footing work | 60% |
| Upto Plinth Level | 0% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 0% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | No | Not applicable |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | Yes | 0% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 0% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SRAVYA SARVEPALLI | - | - |
| sirisha sarvepalli | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 118.94 cr | Rs 1.55 cr |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 27.00 cr | - |
| On-site expenditure-Consultants Fees | Rs 6.61 cr | Rs 7.39 lakh |
| On-site expenditure-Salaries of workers | Rs 4.76 cr | Rs 7.39 lakh |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SNIGDHA DASH |
| Engineer | Ramesh B |
| Chartered Accountant | RAMAKIRHNA REDDY ANIMIREDDY |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed114
As listed on the registration, under the names the promoter filed them with; the newest 80 of 114 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/240626/008750 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM 4 CA CERTIFICATE PAVANI MIRABILIA III.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: FORM 5 ARCHITECT CERTIFICATE PAVANI MIRABILIA III.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 6 ENGINEER CERTIFICATE PAVANI MIRABILIA III.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: FORM 1- CA CERTIFICATE.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: ARCHITECT CERTIFICATE.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: FORM 3 ENGINEER CERTIFICATE.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Once again informed to Kindly upload the AFS with the following corrections earnest money/booking amFile: PROFORMA AGREEMENT FOR SALE 09062026.pdf | 9 Jun 2026 |
| E khata in the name o0f owners issued by lacal bodyFile: E KATHA - SIRISHA & SRAVYA.pdf | 2 Jun 2026 |
| The updated area details in the project details page do not match with the approved plan.Once againFile: COVERING LETTER FOR AREA STATEMENT PHASE WISE.pdf | 2 Jun 2026 |
| Once again informed to kindly upload the amenities declaration.File: COVERING LETTER FOR AMENITIES AND COMMON AREA DETAILS.pdf | 2 Jun 2026 |
| Once again informed to kindly upload the engineer certificate duly signed by engineer whose having vFile: FORM 3 ENGINEER CERTIFICATE.pdf | 2 Jun 2026 |
| Once again informed to kindly upload elaborated structural stability certificate clearly stating theFile: STRUCTURAL STABILITY CERTIFICATE1.pdf | 2 Jun 2026 |
| In the uploaded affidavits,you have not mentioned about responsibilities and liabilities of the builFile: AFFIDAVIT FOR NOC.pdf | 2 Jun 2026 |
| Once again informed to kindly upload brief project estimation with licenced engineer signature.File: PROJECT_ESTIM BY ENGINEER.pdf | 2 Jun 2026 |
| Once again informed to kindly upload the STP drawing certified by the Engineer as per the guidelinesFile: STP DRAWING CERTIFIED BY ENGINEER.pdf | 2 Jun 2026 |
| Once again informed to kindly upload the Land cost calculation sheet as per the guidance value(SelfFile: COVERING LETTER FOR LAND COST WITH GUIDELINE VALUE.pdf | 2 Jun 2026 |
| Once again informed to kindly clarify the main source of water supply to the project along with theFile: COVERING LETTER FOR WATER SOURCES.pdf | 2 Jun 2026 |
| Once again informed to kindly upload AFS as per RERA proforma,some of the clauses are not as per RFile: PROFORMA AGREEMENT FOR SALE.pdf | 2 Jun 2026 |
| Once again informed to kindly upload Proforma Allotment letter as per the standard prescribed formatFile: PROFORMA ALLOTMENT LETTER.pdf | 2 Jun 2026 |
| 1.Upload chartered accountant certificate (CA) in prescribed format form -01. ( with details of 3 baFile: FORM 1- CA CERTIFICATE.pdf | 18 May 2026 |
| 2. Upload the bank affidavit in the prescribed format documents.( Please upload 3 bank accounts as pFile: BANK ACCOUNT AFFIDAVIT.pdf | 18 May 2026 |
| 3. There is revenue from sales/ operation why it is not considered for section 3(1) violation of theFile: LETTER FOR SOURCE OF FUNDS.pdf | 18 May 2026 |
| 4.Upload the Bank 100%, 70%, and 30% account pass sheets or statements, the bank account name shouldFile: HDFC BANK PASS SHEET & LETTER.jpeg | 18 May 2026 |
| 5. What are all the sources of funds to complete the project? With supporting documents. Hence notFile: LETTER FOR SOURCE OF FUNDS.pdf | 18 May 2026 |
| Title deed showing flow of title to the current ownersFile: SALE DEED - SY 21-3.pdf | 18 May 2026 |
| E khata in the name o0f owners issued by lacal bodyFile: E KATHA.pdf | 18 May 2026 |
| non litigation affidavit in correct formatFile: AFFIDAVIT 2.PDF | 18 May 2026 |
| EC upto dateFile: EC.pdf | 18 May 2026 |
| 1)Single Plot layout/Development plan Approved by the competent authority (Original and clearly visiFile: DEVELOPMENT PLAN.pdf | 18 May 2026 |
| 2)Single Plot layout/Development plan order Approved by the competent authority(Original and clearlFile: DEVELOPMENT PLAN.pdf | 18 May 2026 |
| 3)Building License from Local Authority Original Copy.File: BUILDING LICENSE LETTER MODIFIED.pdf | 18 May 2026 |
| 4)ADLR Certified survey sketch Certifying the Boundary of the Proposed land-Original survey sketchFile: ADLR.PDF | 18 May 2026 |
| 7)Demarcation of proposed land in Approved Master plan Certified by the competent authority.File: CDP PLAN.pdf | 18 May 2026 |
| 8)Demarcation of proposed land in original Village map certified by the competent authorityFile: VILLAGE MAP.pdf | 18 May 2026 |
| 9)Approval/NOC under section 14 of the KTCP Act from competent Authority.File: NOC AFFIDAVIT.pdf | 18 May 2026 |
| 1)Kindly upload approved plan.File: SITE PLAN.pdf | 18 May 2026 |
| 1)Kindly upload approved plan. 2)1)Project address entered in project details page is not as per appFile: LETTER FOR PROJECT ADDRESS.pdf | 18 May 2026 |
| 11)Kindly upload elaborated structural stability certificate clearly stating the number of floors coFile: Form3 Pavani Mirabilia phase 3.pdf | 18 May 2026 |
| 13)Kindly upload Proforma Allotment letter as per the standard prescribed format available in RERAFile: ALLOTMENT LETTER AND BOOKING FORM.pdf | 18 May 2026 |
| 14)Uploaded BESCO NOC validity is expired,kindly upload the renewed one.File: NOC AFFIDAVIT.pdf | 18 May 2026 |
| 15)Kindly upload BWSSB NOC along with fee paid receipt.File: NOC AFFIDAVIT.pdf | 18 May 2026 |
| 16)Kindly upload renewed SEIAA NOC.File: NOC AFFIDAVIT.pdf | 18 May 2026 |
| 17)Kindly upload brief project estimation with licenced engineer signature.File: Form3 Pavani Mirabilia phase 3.pdf | 18 May 2026 |
| 18)Kindly upload the STP drawing certified by the Engineer as per the guidelines.File: STP DRAWING.pdf | 18 May 2026 |
| 19)Kindly upload the Land cost calculation sheet as per the guidance value(Self-attested copy) alongFile: GUIDE LINE VALUE SEGEHAALI.pdf | 18 May 2026 |
| 6)Upload all original sanctioned drawings, floor plan, sectional drawings and elevations.File: GROUND AND FIRST FLOOR PLAN.pdf | 18 May 2026 |
| 6)Upload all original sanctioned drawings, floor plan, sectional drawings and elevations.File: SECTION PLAN.pdf | 18 May 2026 |
| 6)Upload all original sanctioned drawings, floor plan, sectional drawings and elevations.File: TYPICAL 2ND TO 19TH & TERRANCE FLOOR PLAN.pdf | 18 May 2026 |
| 6)Upload all original sanctioned drawings, floor plan, sectional drawings and elevations.File: ELEVATION PLAN.pdf | 18 May 2026 |
| Proforma Sale AgreementFile: PROFORMA SALE AGREEMENT.pdf | 18 May 2026 |
| RTC, survey 21/3 | - |
| Mutation, survey 21/3 | - |
| Encumbrance Certificate, survey 21/3 | - |
| Conversion/Alienation Order, survey 21/3 | - |
| JDA, survey 21/3 | - |
| Khatha, survey 21/3 | - |
| Registration CertificateFile: SSIPPL - COI.pdf | - |
| Memorandum of AssociationFile: SSIPPL-MOA.pdf | - |
| Article of AssociationFile: SSIPL-AOA.pdf | - |
| GST CertificateFile: SAI SRAVANTHI GST REGN CERT - BLR.pdf | - |
| Organization StructureFile: SSIPPL - COI.pdf | - |
| Certificate issued by CA Form 1File: FORM 1- CA CERTIFICATE.pdf | - |
| Certificate issued by Architect Form 2File: ARCHITECT CERTIFICATE.pdf | - |
| Certificate issued by Engineer Form 3File: Form3 Pavani Mirabilia phase 3.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: AFFIDAVIT 2.PDF | - |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Pavani Divine | Pavani Divine , SR Palya | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep PAVANI MIRABILIA PHASE III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 30 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Sai Sravanthi Infra Projects Pvt Ltd
Sai Sravanthi Infra Projects Pvt Ltd has 4 registrations on RERA Karnataka, including PAVANI MIRABILIA PHASE I and Pavani Divine. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if PAVANI MIRABILIA PHASE III is delayed beyond 3 Mar 2031?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of PAVANI MIRABILIA PHASE III?
The registered promoter entity is Sai Sravanthi Infra Projects Pvt Ltd, a company as per the filing. Its CIN U45203TG2008PTC060151 and GSTIN 29AAPCS0464C1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in PAVANI MIRABILIA PHASE III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at PAVANI MIRABILIA PHASE III?
The professionals named in the filing: Architect: SNIGDHA DASH; Engineer: Ramesh B; Chartered Accountant: RAMAKIRHNA REDDY ANIMIREDDY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PAVANI MIRABILIA PHASE III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback