Home / Browse projects / Bengaluru Urban, Karnataka / PARTH GARDENIA
PARTH GARDENIA
By PARTH CONSTRUCTIONS PVT LTD
RG-KA-13485 · RERA PRM/KA/RERA/1251/309/PR/171019/000265 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- 29 complaints at RERA Karnataka
- Completion date moved by 70 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
Saved.
PARTH GARDENIA is a Mixed Development project by PARTH CONSTRUCTIONS PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/171019/000265 on 19 Oct 2017. Possession is promised by 31 Dec 2029. The completion date has moved by 70 months from the original filing. 0 of the 182 units on this registration are recorded sold or booked, and 4 of 19 construction stages are filed complete. 29 complaints are on record with the regulator.
At a glance
Project
- NamePARTH GARDENIA
- TypeMixed Development
- Location
- Bengaluru North
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/309/PR/171019/000265
- ReraGenie IDRG-KA-13485
Builder
- NamePARTH CONSTRUCTIONS PVT LTD
- Entity typeCompany
- CINU45201KA2007PTC044213
- Authorized SignatoryGOPAL PANDURANG SHINDE
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on19 Oct 2017
- Promised completion31 Dec 2029
- Revised completionRevised to 31 Dec 2029 (originally 16 Feb 2024)
- Buildings7 building records
- Documents filed97 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING 1 | - | - | - | - | - | 26 |
| WING 2 | - | - | - | - | - | 26 |
| WING 3 | - | - | - | - | - | 26 |
| WING 4 | - | - | - | - | - | 26 |
| WING 5 | - | - | - | - | - | 26 |
| WING 6 | - | - | - | - | - | 26 |
| WING 7 | - | - | - | - | - | 26 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 19 construction stages are filed complete. The stage furthest along is Masonry construction: Bricks, at 98%.
Building: 71% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Retaining wall (All types) | 100% |
| Plinth level Beam | 90% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 90% |
| RCC or MS Framed structure | 100% |
| Masonry construction: Bricks, Concrete blocks etc | 98% |
| Plastering inside , outside & Ceiling | 70% |
| Joinery: Doors, Windows, Ventilators etc | 70% |
| Basic work of Water supply, Sanitary and Electrification | 70% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 70% |
| Railing and Grill fixing | 70% |
| Electrification, Water supply and Sanitary Finishing | 70% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 70% |
| Fire prevention and fire fighting fitting and fixture with network | 70% |
| Weather Proof work(tile,concrete) | 70% |
| Painting | 20% |
| Elevation work | 10% |
| Internal and External work including landscapes as per santioned drawings | 10% |
Progress on shared amenities41
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 70% |
| Internal Roads & Footpaths | Yes | 50% |
| Sewage and Drainage System | Yes | 50% |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | 0% |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | 50% |
| Solid waste management and disposal | Yes | 45% |
| Water conservation | Yes | 40% |
| Energy management | Yes | 40% |
| Fire protection and fire safety requirements | Yes | 40% |
| Education/Health/Other public amenities | Yes | 40% |
| Electricity supply transformer and substation | Yes | 40% |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | Yes | 45% |
| Use of renewable energy | Yes | 40% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 40% |
| Electricity | Yes | 60% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 50% |
| Club House | Yes | 40% |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | 40% |
| Swimming Pool | Yes | 30% |
| Gym | Yes | 20% |
| Parks | No | Not applicable |
| Power Backup | Yes | 20% |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | 20% |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | 70% |
| Lifts | Yes | 70% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 60% |
| Fire escapes | Yes | 50% |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 50% |
| Basement | Yes | 50% |
| Terrace | Yes | 40% |
| Outer Wall | Yes | 40% |
| Open parking areas and common storage spaces | Yes | 40% |
| Provision for lodging of management staff and security staff | Yes | 20% |
| Water conservation and renewable energy | Yes | 20% |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 65.00 cr | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Reason as filed by the promoterForce Majeure
No reason recorded in the filing
Complaints filed with RERA Karnataka29
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00845/2024 | - | PARTH CONSTRUCTIONS PVT LTD | 09/09/2024 |
| 00036/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 04/01/2025 |
| 00512/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 19/03/2025 |
| 00513/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 19/03/2025 |
| 00527/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 19/03/2025 |
| 00969/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 29/07/2025 |
| 00973/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 29/07/2025 |
| 00974/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 29/07/2025 |
| 01359/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 11/11/2025 |
| 01360/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 11/11/2025 |
| 01361/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 11/11/2025 |
| 01362/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 11/11/2025 |
| 01363/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 11/11/2025 |
| 01364/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 11/11/2025 |
| 01365/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 11/11/2025 |
| 01366/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 11/11/2025 |
| 01367/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 11/11/2025 |
| 01368/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 11/11/2025 |
| 01369/2025 | - | PARTH CONSTRUCTIONS PVT LTD | 11/11/2025 |
| 00933/2026 | - | PARTH CONSTRUCTIONS PVT LTD | 04/08/2026 |
| 00934/2026 | - | PARTH CONSTRUCTIONS PVT LTD | 04/08/2026 |
| 00935/2026 | - | PARTH CONSTRUCTIONS PVT LTD | 04/08/2026 |
| 00936/2026 | - | PARTH CONSTRUCTIONS PVT LTD | 04/08/2026 |
| 00937/2026 | - | PARTH CONSTRUCTIONS PVT LTD | 04/08/2026 |
| 00938/2026 | - | PARTH CONSTRUCTIONS PVT LTD | 04/08/2026 |
| 00939/2026 | - | PARTH CONSTRUCTIONS PVT LTD | 04/08/2026 |
| 00940/2026 | - | PARTH CONSTRUCTIONS PVT LTD | 04/08/2026 |
| 00941/2026 | - | PARTH CONSTRUCTIONS PVT LTD | 04/08/2026 |
| 00942/2026 | - | PARTH CONSTRUCTIONS PVT LTD | 04/08/2026 |
Documents filed97
As listed on the registration, under the names the promoter filed them with; the newest 80 of 97 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/171019/000265 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: PARTH GARDENIA (1).pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Q2.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Parth Gardenia form 6 Q2 2026-27.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Q3 2025 26.pdf | 15 Apr 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: AC Q3 2025-26.pdf | 15 Apr 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: EC Q4 2025-26.pdf | 15 Apr 2026 |
| Q3 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q3 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q3 2025-26 Fire and Safety | 15 Apr 2026 |
| Q3 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Q4 2025 26 1.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: AC Q4 2025-26.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: EC Q4 2025-26.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Approved PlanFile: Approved Plan.jpg | 24 Sep 2025 |
| 52Commencement Certificate BDA ParthaFile: 52Commencement Certificate BDA Partha.pdf | 24 Sep 2025 |
| Ex_5_250924_114518File: Ex_5_250924_114518.pdf | 24 Sep 2025 |
| Ex_7 Affidavit_250924_114551File: Ex_7 Affidavit_250924_114551.pdf | 24 Sep 2025 |
| Form_B_250924_114449File: Form_B_250924_114449.pdf | 24 Sep 2025 |
| Letter_250924_114639File: Letter_250924_114639.pdf | 24 Sep 2025 |
| FORM 1 ARCHITECT CERTIFICATFile: Form 1 AC status of work.pdf | 7 Aug 2025 |
| FORM 2 ARCHITECT CERTIFICATEFile: Form 2 AC pending work.pdf | 7 Aug 2025 |
| FORM 3 CA CERTIFICATE FUND UTILIZATIONFile: Form 3 CA utilization certificate.pdf | 7 Aug 2025 |
| FORM 4 CA CERTIFICATE FUND REQUIREMENTFile: Form 4 CA fund.pdf | 7 Aug 2025 |
| FORM 5 ENGINEER CERTIFICATEFile: Form 5 EC status of work.pdf | 7 Aug 2025 |
| FORM 6 ENGINEER CERTIFICATEFile: Form 6 EC Work pending.pdf | 7 Aug 2025 |
| FORM B AFFIDAVITFile: Form B affidavit.pdf | 7 Aug 2025 |
| REQUEST LETTERFile: Request letter.pdf | 7 Aug 2025 |
| PLANFile: Plan.jpg | 7 Aug 2025 |
| CertificateFile: Incorporation Certificate.pdf | - |
| Project Details | - |
| Architect Certificate for Work Completion Schedule till DateFile: Form 1 AC status of work.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: Form 4 EC Work pending.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Form 2 AC pending work.pdf | - |
| AffidavitFile: Affidavit Form Ex7.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx | - |
| 52Commencement Certificate BDA | - |
| scan028reduced25 | - |
| Draft sale deed | - |
| AGREEMENT FOR SALE | - |
| LoactionPin | - |
| Section Elevation | - |
| eBrochureParthGardenia | - |
| ENVIORTNAMENT AUTHORITY | - |
| Specifications | - |
| 51Encomberance Certificate | - |
| khata certificate kodige halli (1) | - |
| Title Search Report | - |
| ConversionLowReso | - |
| 29Endorsement No PTCL CR 3290-2012 - 13 | - |
| FIRE NOC | - |
| AIRPORT AUTHORITY OF INDIA | - |
| BESCOM - 2011 | - |
| BWSSB | - |
| KARNATAKA STATE POLLUTION CONTROL BOARD -2 | - |
| ENVIORTNAMENT AUTHORITY | - |
| BSNL | - |
| Section Elevation | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep PARTH GARDENIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: PARTH CONSTRUCTIONS PVT LTD
PARTH CONSTRUCTIONS PVT LTD has 1 registration on RERA Karnataka, including PARTH GARDENIA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if PARTH GARDENIA is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of PARTH GARDENIA?
The registered promoter entity is PARTH CONSTRUCTIONS PVT LTD, a company as per the filing. Its CIN U45201KA2007PTC044213 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in PARTH GARDENIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PARTH GARDENIA?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
What should I check before booking in PARTH GARDENIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback