Parkwest - Pine - Tower 9
By Relationship Properties Private Limited
RG-KA-75860 · RERA PRM/KA/RERA/1251/310/PR/210216/003899 · Last updated on RERA Karnataka portal: 15 Jan 2026
Source: official RERA Karnataka filing
Red flags
- 14 complaints at RERA Karnataka
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
Saved.
Parkwest - Pine - Tower 9 is a Residential/Group Housing project by Relationship Properties Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/210216/003899 on 16 Feb 2021. Possession is promised by 31 Dec 2025. The completion date has moved by 12 months from the original filing. 219 of the 219 units on this registration are recorded sold or booked, and 9 of 18 construction stages are filed complete. 14 complaints are on record with the regulator.
At a glance
Project
- NameParkwest - Pine - Tower 9
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/210216/003899
- ReraGenie IDRG-KA-75860
Builder
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on16 Feb 2021
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed123 files
Current status
Figures as on 15 Jan 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Pine - Tower 9 | - | - | - | 219 | 0 | 219 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 18 construction stages are filed complete. The stage furthest along is Plastering inside, at 99%.
Building: 86% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Retaining wall (All types) | 100% |
| Plinth level Beam | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| RCC or MS Framed structure | 100% |
| Masonry construction: Bricks, Concrete blocks etc | 100% |
| Plastering inside , outside & Ceiling | 99% |
| Joinery: Doors, Windows, Ventilators etc | 90% |
| Basic work of Water supply, Sanitary and Electrification | 90% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 85% |
| Railing and Grill fixing | 97% |
| Electrification, Water supply and Sanitary Finishing | 44% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | 100% |
| Weather Proof work(tile,concrete) | 100% |
| Painting | 50% |
| Elevation work | 97% |
| Internal and External work including landscapes as per santioned drawings | 0% |
Progress on shared amenities41
As on 15 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 60% |
| Internal Roads & Footpaths | Yes | 85% |
| Sewage and Drainage System | Yes | 90% |
| Parks & Tree planting | Yes | 22% |
| Street Lighting | Yes | 0% |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | 100% |
| Solid waste management and disposal | Yes | 0% |
| Water conservation | Yes | 64% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Education/Health/Other public amenities | Yes | 0% |
| Electricity supply transformer and substation | Yes | 52% |
| Emergency Evacuation services | Yes | 100% |
| Storm water drains | Yes | 75% |
| Use of renewable energy | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 64% |
| Electricity | Yes | 52% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Gas | Yes | 0% |
| Water and Sanitation | Yes | 64% |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | 97% |
| Lifts | Yes | 97% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 97% |
| Fire escapes | Yes | 91% |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 90% |
| Basement | Yes | 100% |
| Terrace | Yes | 91% |
| Outer Wall | Yes | 91% |
| Open parking areas and common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 64% |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| ETA Karnataka Estates Limited | - | - |
| ETA Star Infopark | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 155.09 cr | Rs 133.39 cr |
| On-site expenditure-Site Overhead | - | Rs 14.29 cr |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RSP Design Consultants India Private Limited |
| Engineer | Designtree Service Consultants Private Limited |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterForce Majeure
Complaints filed with RERA Karnataka14
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 00092/2023 | - | Relationship Properties Private Limited | 18/01/2023 |
| 00158/2025 | - | Relationship Properties Private Limited | 21/01/2025 |
| 00159/2025 | - | Relationship Properties Private Limited | 21/01/2025 |
| 00222/2025 | - | Relationship Properties Private Limited | 29/01/2025 |
| 00253/2025 | - | Relationship Properties Private Limited | 05/02/2025 |
| 00307/2025 | - | Relationship Properties Private Limited | 17/02/2025 |
| 00357/2025 | - | Relationship Properties Private Limited | 01/03/2025 |
| 00563/2025 | - | Relationship Properties Private Limited | 02/04/2025 |
| 01530/2025 | - | Relationship Properties Private Limited | 26/12/2025 |
| 01531/2025 | - | Relationship Properties Private Limited | 26/12/2025 |
| 00037/2026 | - | Relationship Properties Private Limited | 12/01/2026 |
| 00100/2026 | - | Relationship Properties Private Limited | 10/02/2026 |
| 00403/2026 | - | Relationship Properties Private Limited | 16/04/2026 |
| 00854/2026 | - | Relationship Properties Private Limited | 23/07/2026 |
Documents filed123
As listed on the registration, under the names the promoter filed them with; the newest 80 of 123 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/210216/003899 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4 T9 Q3 25-26.pdf | 15 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 T9 Q3 25-26.pdf | 15 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 T9 Q3 25-26.pdf | 15 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jan 2026 |
| AU Submission T9File: AU Submission T9.png | 26 Feb 2025 |
| Clarification letterFile: T9 clarification letter.pdf | 13 Jan 2021 |
| Supplemental Agreement dated 27052019File: Supplemental agreement 27052019.pdf | 13 Jan 2021 |
| T9 Notarised Joint declaration affidavitFile: T9 Notarised Joint declaration affidavit.pdf | 13 Jan 2021 |
| Architect demarcation plan with area statementFile: 1 Architect demarcation plan with area statement.pdf | 31 Dec 2020 |
| BDA Approved planFile: 2 BDA Approved plan.pdf | 31 Dec 2020 |
| Site Plan BBMPFile: 3 Site Plan BBMP.pdf | 31 Dec 2020 |
| T9 elevationFile: 4 T9 elevation.pdf | 31 Dec 2020 |
| T9 sectionFile: 5 T9 section.pdf | 31 Dec 2020 |
| T9 ground floorFile: 6 T9 ground floor.pdf | 31 Dec 2020 |
| T9 first floorFile: 7 T9 first floor.pdf | 31 Dec 2020 |
| T9 typical floor 2nd floorFile: 8 T9 typical floor 2nd floor.pdf | 31 Dec 2020 |
| T9 3 4 10 11 12 13 19 20 21 22 floorFile: 9 T9 3 4 10 11 12 13 19 20 21 22 floor.pdf | 31 Dec 2020 |
| T9 5 6 7 14 15 16 23 24 25 floorFile: 10 T9 5 6 7 14 15 16 23 24 25 floor.pdf | 31 Dec 2020 |
| T9 8 7 26 floorFile: 11 T9 8 7 26 floor.pdf | 31 Dec 2020 |
| T9 9 27 floorFile: 12 T9 9 27 floor.pdf | 31 Dec 2020 |
| T9 18 floorFile: 13 T9 18 floor.pdf | 31 Dec 2020 |
| T9 28 floorFile: 14 T9 28 floor.pdf | 31 Dec 2020 |
| T9 29 30 31 32 floorFile: 15 T9 29 30 31 32 floor.pdf | 31 Dec 2020 |
| T9 terrace floorFile: 16 T9 terrace floor.pdf | 31 Dec 2020 |
| BBMP plan approval letterFile: BBMP plan approval letter.pdf | 31 Dec 2020 |
| BDA Work OrderFile: BDA Work Order.pdf | 31 Dec 2020 |
| Lower basement plan 01File: Lower basement plan 01.pdf | 31 Dec 2020 |
| Lower Basement Plan 02File: Lower Basement Plan 02.pdf | 31 Dec 2020 |
| Upper Basement Plan 01File: Upper Basement Plan 01.pdf | 31 Dec 2020 |
| Upper Basment Plan 02File: Upper Basment Plan 02.pdf | 31 Dec 2020 |
| Reply to the query dated 11.12.2020File: Reply to notice Tower 9.pdf | 18 Dec 2020 |
| Area demarcation planFile: 1. Architect demarcation plan with area statement.pdf | 18 Dec 2020 |
| BBMP plan approval letterFile: BBMP plan approval letter.pdf | 18 Dec 2020 |
| BDA work orderFile: BDA Work Order.pdf | 18 Dec 2020 |
| BDA approved planFile: 2. BDA Approved plan.pdf | 18 Dec 2020 |
| BBMP site planFile: 3. Site Plan BBMP.pdf | 18 Dec 2020 |
| T9 elevationFile: 4. T9 - elevation.pdf | 18 Dec 2020 |
| T9 sectionFile: 5. T9 - section.pdf | 18 Dec 2020 |
| T9 ground floor planFile: 6. T9 - ground floor.pdf | 18 Dec 2020 |
| T9 1st floor planFile: 7. T9 - first floor.pdf | 18 Dec 2020 |
| T9 2nd floor planFile: 8. T9 - typical floor (2).pdf | 18 Dec 2020 |
| T9 - 3,4,10,11,12,13,19,20,21,22 floor planFile: 9. T9 - 3,4,10,11,12,13,19,20,21,22 floor.pdf | 18 Dec 2020 |
| T9 - 5,6,7,14,15,16,23,24,25 floor planFile: 10. T9 - 5,6,7,14,15,16,23,24,25 floor.pdf | 18 Dec 2020 |
| T9 - 8,7,26 floor planFile: 11. T9 - 8,7,26 floor.pdf | 18 Dec 2020 |
| T9 - 9,27 floor planFile: 12. T9 - 9,27 floor.pdf | 18 Dec 2020 |
| T9 18th floor planFile: 13. T9 - 18 floor.pdf | 18 Dec 2020 |
| T9 28th floor planFile: 14. T9 - 28 floor.pdf | 18 Dec 2020 |
| T9 - 29,30,31,32 floor planFile: 15. T9 - 29,30,31,32 floor.pdf | 18 Dec 2020 |
| T9 terrace planFile: 16. T9 - terrace floor.pdf | 18 Dec 2020 |
| Upper basement plan 1File: Upper Basement Plan 01.pdf | 18 Dec 2020 |
| Upper basement plan 2File: Upper Basment Plan 02.pdf | 18 Dec 2020 |
| Lower basement plan 1File: Lower basement plan 01.pdf | 18 Dec 2020 |
| Lower basement plan 2File: Lower Basement Plan 02.pdf | 18 Dec 2020 |
| Revenue documentsFile: Revenue documents merged.pdf | 18 Dec 2020 |
| Reply to the noticeFile: Reply to Tower-9.pdf | 1 Dec 2020 |
| Document No 1File: Document No 1.pdf | 1 Dec 2020 |
| Document No 2File: Document No 2.pdf | 1 Dec 2020 |
| Document No 3File: Document No 3.pdf | 1 Dec 2020 |
| Document No 4File: Document No 4.pdf | 1 Dec 2020 |
| Document No 5File: Document No 5.pdf | 1 Dec 2020 |
| Document No 6File: Document No 6.pdf | 1 Dec 2020 |
| CertificateFile: RPPL_Registration Certificate.pdf | - |
| Architect Certificate for Work Completion Schedule till DateFile: Ex-1.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: Ex-5.pdf | - |
| CA Certificate for Funds UtilizationFile: Ex-3.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Ex-2.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: Ex-6.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: Ex-4.pdf | - |
| AffidavitFile: Ex-7 Affidavit.pdf | - |
| Latest Encumbrance CertificateFile: EC copy.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: Sold and Unsold Units.pdf | - |
| BBMP License 12-03-2020 | - |
| Blank | - |
| Remodified Devolopment Plan @ 11-03-2020 | - |
| SP-ParkWest- Cluster 3 SALE DEED v1-20200313 | - |
| Parkwest ATS proforma 22112020 | - |
| Sale deed | - |
| Blank | - |
| BDA Remodified Devolopment Plan 11-03-2020_compressed | - |
| Application Of Allotment_06042020 | - |
Promoter's earlier projects7
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Parkwest - Mahogany - Tower 7 | - | Ongoing | Sep 2023 | Not delivered |
| Parkwest - Magnolia - Tower 6 | - | Ongoing | Oct 2022 | Not delivered |
| Parkwest - Sapphire - Tower 5 | - | Ongoing | Jun 2022 | Not delivered |
| Parkwest - Maple - Tower 4 | - | Ongoing | Jun 2021 | Not delivered |
| Parkwest - Olive - Tower 1 | - | Completed | - | No date filed |
| Parkwest - Mulberry - Tower 3 | - | Completed | - | No date filed |
| Parkwest - Emerald - Tower 2 | - | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Parkwest - Pine - Tower 9 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Relationship Properties Private Limited
Relationship Properties Private Limited has 11 registrations on RERA Karnataka, including Parkwest - Olive - Tower 1 and Parkwest - Maple - Tower 4. Its filings declare 9 earlier projects, 3 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Parkwest - Pine - Tower 9 is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Parkwest - Pine - Tower 9?
The registered promoter entity is Relationship Properties Private Limited, a company as per the filing. Its CIN U45200MH2008PTC178830 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Parkwest - Pine - Tower 9?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Parkwest - Pine - Tower 9?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Parkwest - Pine - Tower 9?
The professionals named in the filing: Architect: RSP Design Consultants India Private Limited; Engineer: Designtree Service Consultants Private Limited. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Parkwest - Pine - Tower 9?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback