Registration approved Residential/Group Housing project

Parkwest - Mahogany - Tower 7

By Relationship Properties Private limited

RG-KA-21393 · RERA PRM/KA/RERA/1251/310/PR/181204/002196

Source: official RERA Karnataka filing

Red flags

  • 2 complaints at RERA Karnataka
  • Completion date moved by 15 months
  • 2 extensions taken

Clear

  • Separate project account declared
Jun 2024Possession promisedmoved 15 months from the original
2Complaints at RERA Karnatakaon this registration
Jump to the 79 documents Report an error

Parkwest - Mahogany - Tower 7 is a Residential/Group Housing project by Relationship Properties Private limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/181204/002196 on 4 Dec 2018. Possession is promised by 30 Jun 2024. The completion date has moved by 15 months from the original filing. 2 complaints are on record with the regulator.

At a glance

Project

  • NameParkwest - Mahogany - Tower 7
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/181204/002196
  • ReraGenie IDRG-KA-21393

Builder

  • NameRelationship Properties Private limited
  • Entity typeCompany
  • CINU45200MH2008PTC178830
  • Authorized SignatoryAnand Rao
  • DirectorsMs. Sunita Khanna, Mr. Nirav Dalal, Mr. Makarand Desai
  • Other registrations10 more →
  • Declared earlier projects9 →

Key dates

this monthRegisteredDec 2018First promiseMar 2023Revised toJun 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on4 Dec 2018
  • Promised completion30 Jun 2024
  • Revised completionRevised to 30 Jun 2024 (originally 31 Mar 2023)
  • Buildings1 building record
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Mahogany---1820182

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,299 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 111.80 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLalit Narula
EngineerDesigntree Service Consultants Private Limited

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMar 2023 → Dec 2023

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/240205/002196Dec 2023 → Jun 2024

Reason as filed by the promoterAwaiting Approvals

Complaints filed with RERA Karnataka2

Case no.ComplainantRespondentFiled
01869/2023-Relationship Properties Private limited26/12/2023
00372/2024-Relationship Properties Private limited10/04/2024

Documents filed79

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/181204/002196 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: RPPL_Registration Certificate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: T7 EXTENSION ARCHITECT CERTIFICATE- Work completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: T7 EXTENSION ENGR CERTIFICATE- Work Completed.pdf-
CA Certificate for Funds UtilizationFile: CA Certificate Fund Utilized December 2023.pdf-
Architect Certificate for Pending Work Completion Schedule.File: T7 EXTENSION ARCHITECT CERTIFICATE- Work pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: T7 EXTENSION ENGR CERTIFICATE work Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA Certificate Fund Required December 2023.pdf-
AffidavitFile: Form B Affidavit.pdf-
Details Of Sold/ Un-sold UnitsFile: Sold unsold inventory - Tower 7.xlsx-
Document 1File: NOC KSPCB clarification.pdf-
Document 3File: T7- ack copy dated 07-12-2023.pdf-
Document 4File: T7 - KSPCB CFO Online Ack dated 04092023.pdf-
Document 5File: Tower 07 Fire Clearance 18112023.pdf-
Document 6File: BESCOM NOC with substation order.pdf-
Document 7File: BWSSB NOC Self-attested.pdf-
Document 8File: KSPCB Addendum dated 13082021.pdf-
Document 9File: SEIAA NOC.pdf-
Document 10File: AAI NOC dated 05-07-2021.pdf-
Document 11File: HAL NOC dated 07-01-2023.pdf-
Tower 1 -6 cc-
TOWER 07 FLOOR PLANS-
Phase 2 BBMP Appvd Site Plan Dt 18-09-2015-
Sale Deed - KRERA 12-01-18-
Agreement to Sale - KRERA 12-01-18-
COMBINED-
T7 - Section A 0-
COMBINED AREA STATEMENT-
RERA Application for Allotment Mahogany Parkwest-
Brochure-
General Specifications for Mahogany-
Encumbrance Certificate-
Latest BBMP Khatha Certificate & Extract-
JDA_ 28-03-2011-
Relinquishment Deed11-
Fire NOC-
AAI NOC for Parkwest_26 06 15-
Revised Bescom NOC Dt 24-09-2015-
BWSSB NOC-
Mod CFE issd by KSPCB Dtd 24-06-2016 Pg 01-09-compressed-
SEIAA NOC-
BSNL NOC DTD 25042009-
Unnamed document-
Certificate from Registered Engineer-
T7 - Section A 0-
BDA approved Mod Dev Plan - Park West Dt 06-04-2015-
T7 - Ground Floor Plan-
Title Report-
Balance Sheet 2017 - 2018File: Balance Sheet_FY 17-18.pdf-
Balance Sheet 2016 - 2017File: Balance Sheet 16-17.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet _ FY 15-16.pdf-
Audited Profit and Loss Statement 2017 - 2018File: Profit Loss FY 17-18.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Profit Loss FY 16-17.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit Loss _ FY 15-16.pdf-
Director's Report 2017 - 2018File: Directors Report_RPPL_16-17.pdf-
Director's Report 2016 - 2017File: Director's Report_FY 15-16.pdf-
Director's Report 2015 - 2016File: Director's Report_FY 14-15.pdf-
Cash Flow Statement 2017 - 2018File: Cash Flow Statement_FY 17-18.pdf-
Cash Flow Statement 2016 - 2017File: Cash Flow Statement_FY 15-16.pdf-
Auditor's Report 2017 - 2018File: Auditor report_2017-2018.pdf-
Auditor's Report 2016 - 2017File: RPPL-Signed Financials 16-17.pdf-
Auditor's Report 2015 - 2016File: Auditor Report_FY 15-16.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: RPPL-ITR-AY 2017-18-Acknwoledgmnets.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITRV-2015-16.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITRV-2014-15.pdf-
Declaration (Form B)_Affidavit - Mahogany-
Prospectus/BrochureFile: Phase 2 brochure.pdf-
Advertisement Copy 1File: JACKET AD page 1.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_181204_002196.xlsx-
Loan raised documentFile: Loan Release Deed.pdf-
Stability CertificateFile: Strucural stability certificate TOWER-7.pdf-
NOC issued by the Fire Force department after completion of workFile: Fire Clerance Tower 7.pdf-
Occupancy CertificateFile: Tower 07 - Occupancy Certificate.pdf-
Consent for operation issued by KSPCBFile: KSPCB CFO Tower 7.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: BESCOM NOC.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: BWSSB NOC.pdf-
Architect certificate for having completed the work(in format no 5)File: Form-5 Architect Closure Certificate.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form-4 CC CA Certificate.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affadavit Tower 7 RERA Closure.pdf-
Form-6 Engineer Closure CertificateFile: Form-6 Engineer Closure Certificate.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 15 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Parkwest - Mahogany - Tower 7 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Relationship Properties Private limited

Relationship Properties Private Limited has 11 registrations on RERA Karnataka, including Parkwest - Olive - Tower 1 and Parkwest - Maple - Tower 4. Its filings declare 9 earlier projects, 3 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Parkwest - Mahogany - Tower 7 is delayed beyond 30 Jun 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Parkwest - Mahogany - Tower 7?

The registered promoter entity is Relationship Properties Private limited, a company as per the filing. Its CIN U45200MH2008PTC178830 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Parkwest - Mahogany - Tower 7?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Parkwest - Mahogany - Tower 7?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Parkwest - Mahogany - Tower 7?

The professionals named in the filing: Architect: Lalit Narula; Engineer: Designtree Service Consultants Private Limited. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Parkwest - Mahogany - Tower 7?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Parkwest - Mahogany - Tower 7. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Parkwest - Mahogany - Tower 7 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.