Home / Browse projects / Dakshina Kannada, Karnataka / PARK SQUARE

Registration approved No litigation declared Commercial project

PARK SQUARE

By MRANAL MOHAN

RG-KA-15773 · RERA PRM/KA/RERA/1257/336/PR/170622/005004 · Last updated on RERA Karnataka portal: 4 Jun 2022

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2023Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 86 documents Report an error

PARK SQUARE is a Commercial project by MRANAL MOHAN in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/336/PR/170622/005004 on 17 Jun 2022. Possession is promised by 31 Dec 2023.

At a glance

Project

  • NamePARK SQUARE
  • TypeCommercial
  • Location
    • Bantwala
    • Dakshina Kannada
    • 574219
  • Pincode574219
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/336/PR/170622/005004
  • ReraGenie IDRG-KA-15773

Builder

  • NameMRANAL MOHAN
  • Entity typeProprietorship Firm
  • GSTIN29BEIPR4053MIZV
  • Authorized SignatoryMRANAL MOHAN

Key dates

this monthRegisteredJun 2022PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on17 Jun 2022
  • Promised completion31 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed86 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
GSII PARK SQUARE---02222

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 4 Jun 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 4 Jun 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesYes-

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area698 sq m
Named landowners1
LandownerVillageDistrict
MRANAL MOHAN--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.83 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 2.83 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRINIDHI BHAT TN
EngineerSHRINIDHI BHAT TN
Chartered AccountantGAYATHRI C H

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed86

As listed on the registration, under the names the promoter filed them with; the newest 80 of 86 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/336/PR/170622/005004 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Upload last 3 years financial statement for balance sheet, profit and loss account and ITR with CAFile: CA certificate.pdf4 Jun 2022
bank account holder name should be as per RERA direction circular,File: RERA Escrow Account.pdf4 Jun 2022
NEED TITLE DEED TO VEDVATHI AND OTHERS.File: sale deed vedavathi.pdf4 Jun 2022
Upload Change of land use/ certified Extract of Master Plan.File: conversion Park Square_compressed.pdf4 Jun 2022
Upload Location and Demarcation Drawing.File: Approved Plan Layout Park Square.pdf4 Jun 2022
Upload Relinquishment Deed.File: reliquishment deed.pdf4 Jun 2022
Engineer certificateFile: Engineers form 3 RERA signed Park Square.pdf4 Jun 2022
Architect certificateFile: Architects form 2 RERA signed Park Square.pdf4 Jun 2022
Please upload the signed copy of the project specification.File: Building Specifications attested.pdf4 Jun 2022
Please upload the attested copy of water supply NOC along with copy of fee paid receipt towards NOCFile: Water NOC self attested.pdf4 Jun 2022
Provision of STP/Septic Tank, Soak pit and sewer line in the project is to be clarified by the promoFile: STP.jpg4 Jun 2022
Please mention the project name and ack. number and upload the scanned copy of section 391) notarizFile: notarized affidavit 3(i).pdf4 Jun 2022
Master planFile: master plan.pdf4 Jun 2022
Village PlanFile: village plan.pdf4 Jun 2022
Please upload the Advocate Search Report.File: Park Square Legal Opinion Brief version.pdf4 Jun 2022
RTC, survey 74/13-
Mutation, survey 74/13-
Encumbrance Certificate, survey 74/13-
Conversion/Alienation Order, survey 74/13-
Sale/Title/Gift Deed, survey 74/13-
Khatha, survey 74/13-
Registration CertificateFile: GSII Trade License_compressed.pdf-
Certificate issued by CA Form 1File: form 1.pdf-
Certificate issued by Architect Form 2File: Architects form 2 RERA signed Park Square.pdf-
Certificate issued by Engineer Form 3File: Engineers form 3 RERA signed Park Square.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: non litigation park square.pdf-
Certificate from Chartered AccountFile: form 1.pdf-
Balance Sheet 2020 - 2021File: NA PL BS.pdf-
Balance Sheet 2019 - 2020File: CA letter NEW.pdf-
Balance Sheet 2018 - 2019File: CA letter NEW.pdf-
Audited Profit and Loss Statement 2020 - 2021File: NA PL BS.pdf-
Audited Profit and Loss Statement 2019 - 2020File: CA letter NEW.pdf-
Audited Profit and Loss Statement 2018 - 2019File: CA letter NEW.pdf-
Director's Report 2020 - 2021File: CA letter NEW.pdf-
Director's Report 2019 - 2020File: CA letter NEW.pdf-
Director's Report 2018 - 2019File: CA letter NEW.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: Mranal IT Return 2020-2021.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: CA letter NEW.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: CA letter NEW.pdf-
License Order-
Approved Plan-
Approved Plan-
Approved Plan-
Approved Plan-
Approved Plan-
Park Square Building Specification_compressed-
Approved Plan-
Approved Plan-
Single layout order & sketch_compressed-
conversion Park Square_compressed-
AOS PARK SQUARE NEW-
ALLOTMENT letter-
Form B Park Square-
notorized affidavit 3(i) park square-
Mescom Fees Paid Receipt Park Square-
Water NOC-
Unnamed document-
Unnamed document-
fire noc-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Mescom NOC-
Park Square Floor Plan (without Basement) Final v1-
NOC issued by the Fire Force department after completion of workFile: fire noc.pdf-
Occupancy CertificateFile: Completion Certificate (Pravesha Patra).pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: Lift Erection Permission.pdf-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep PARK SQUARE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmPARK SQUAREOther 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: MRANAL MOHAN

MRANAL MOHAN has 1 registration on RERA Karnataka, including PARK SQUARE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if PARK SQUARE is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of PARK SQUARE?

The registered promoter entity is MRANAL MOHAN, a proprietorship firm as per the filing. Its GSTIN 29BEIPR4053MIZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in PARK SQUARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at PARK SQUARE?

The professionals named in the filing: Architect: SHRINIDHI BHAT TN; Engineer: SHRINIDHI BHAT TN; Chartered Accountant: GAYATHRI C H. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PARK SQUARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PARK SQUARE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PARK SQUARE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.