Home / Browse projects / Thane, Maharashtra / paramount park

Completed No litigation declared Residential / Group Housing project

paramount park

By dilip sudhakar deshmukh

RG-MH-24111 · RERA P51700002072 · Last updated on MahaRERA portal: 21 Oct 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2034Possession promisedregistration recorded completed
11 of 55Construction stages doneacross 5 buildings; furthest along: Slabs of Super Structure, 95%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

paramount park is a Residential / Group Housing project by dilip sudhakar deshmukh in Thane, Maharashtra, registered with MahaRERA as P51700002072 on 31 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2034.

At a glance

Project

  • Nameparamount park
  • TypeResidential / Group Housing
  • Location
    • Bhopar
    • Kalyan
    • Thane
    • 421203
  • Pincode421203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700002072
  • ReraGenie IDRG-MH-24111

Builder

  • Namedilip sudhakar deshmukh
  • Entity typeIndividual
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2017PromisedDec 2034Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on31 Jul 2017
  • Promised completion30 Dec 2034
  • Revised completionNone
  • Buildings5 building records
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA00000
B WINGNA00000
C WINGNA110000
D WINGNA120000
E WINGNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 21 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

A WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C WING87%
ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)100%
Plinth90%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
D WING90%
ActivityProgress
Excavation100%
Basement (if any)95%
Podiums (if any)100%
Plinth95%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E WING0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 21 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes95%
Street LightingYes95%
Community BuildingsYes95%
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingYes95%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes95%
Aggregate area of recreational Open SpaceYes95%
Open ParkingNoNot applicable
Temporary parking 2 and 4 wheelerYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,161 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI13552.47
Proposed, not sanctioned1,914 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch3668 SITARAM NIVAS NEAR STAR COLONY MANPADA ROAD SAGOAN DOMBIVALI EAST PINCODE 421201

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Pramod Shinde
PartnerRole in project
dilip sudhakar deshmukh-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Oct 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
OtherFile: letter of intent .pdf21 Oct 2023
OtherFile: FIRE DRAWING .pdf21 Oct 2023
OtherFile: FIRE NOC.pdf21 Oct 2023
Building plan approvalFile: d wing sanctioned plan 2008.pdf23 Oct 2020
Building Plan Approval (IOD)File: d wing sanctioned plan 2008.pdf23 Oct 2020
Status of ConveyanceFile: APARTMENT (2).pdf22 May 2020
OtherFile: apartment.pdf22 May 2020
OtherFile: apartment 1.pdf22 May 2020
OtherFile: apartment 2.pdf22 May 2020
OtherFile: document for rera 2.pdf18 May 2020
OtherFile: document for rera 3.pdf18 May 2020
OtherFile: document for rera 4.pdf18 May 2020
OtherFile: document to be uploaded on rera.pdf14 May 2020
Details of encumbrancesFile: ENCOMBERANCE.pdf29 Jul 2017
Declaration in FORM BFile: NOTARY AFFI 1.pdf29 Jul 2017
Declaration in FORM BFile: NOTARY AFFI 2.pdf29 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT LATTER.pdf29 Jul 2017
Proforma of Allotment letterFile: Draft Agreement.pdf29 Jul 2017
Building plan approvalFile: IMAG1630.pdf26 Jul 2017
Layout approvalFile: LAYOUT 1.pdf26 Jul 2017
Layout approvalFile: IMAG1634.pdf26 Jul 2017
PAN CardFile: Scanned_20170708-1205.pdf26 Jul 2017
Copy of the legal title reportFile: TITAL PAGE 1.pdf26 Jul 2017
Copy of the legal title reportFile: TITAL PAGE 2.pdf26 Jul 2017
Copy of the legal title reportFile: TITAL PAGE 3.pdf26 Jul 2017
Copy of the legal title reportFile: TITAL PAGE 4.pdf26 Jul 2017
Copy of the legal title reportFile: TITAL PAGE 5.pdf26 Jul 2017
Copy of the legal title reportFile: TITAL PAGE 6.pdf26 Jul 2017
Copy of the legal title reportFile: TITAL PAGE 7.pdf26 Jul 2017
Copy of the legal title reportFile: TITAL PAGE 8.pdf26 Jul 2017
Copy of the legal title reportFile: TITAL PAGE 9.pdf26 Jul 2017
Details of encumbrancesFile: IMAG1630.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: IMAG1634.pdf26 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT 1.pdf26 Jul 2017
Building Plan Approval (IOD)File: IMAG1630.pdf26 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: IMAG page 111.pdf26 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: IMAG page 222.pdf26 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: IMAG page 333.pdf26 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: IMAG page 444.pdf26 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: IMAG page 555.pdf26 Jul 2017
Declaration in FORM BFile: NOTARY AFFI 3.pdf26 Jul 2017
Declaration in FORM BFile: IMAG1559 (13)(1).pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IMAG1552.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IMAG1553.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IMAG1554.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IMAG1555.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IMAG1556.pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IMAG1607 (35)1(1).pdf26 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: IMAG1608 (34).pdf26 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SVP 1.pdf26 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SVP 2.pdf26 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SVP 3.pdf26 Jul 2017
Certificates of CA (Form 3)File: IMAG FORM 3 PAGE 1.pdf26 Jul 2017
Certificates of CA (Form 3)File: IMAG FORM 3 PAGE 2.pdf26 Jul 2017
Certificates of CA (Form 3)File: IMAG FORM 3 PAGE 3.pdf26 Jul 2017
Certificates of CA (Form 3)File: IMAG FORM 3 PAGE 4.pdf26 Jul 2017
Certificates of CA (Form 5)File: IMAG FORM 5.pdf26 Jul 2017
Certificates of CA (Form 5)File: IMAG FORM 5 PAGE 2.pdf26 Jul 2017
Proforma of Allotment letterFile: IMAG1629 (1).pdf26 Jul 2017
Certificates of Architect (Form 4)File: IMG-20170721-WA0020 (1).pdf26 Jul 2017
Certificates of Architect (Form 4)File: IMG-20170721-WA0021.pdf26 Jul 2017
Certificates of Architect (Form 4)File: IMAG1545.pdf26 Jul 2017
Certificates of Architect (Form 4)File: IMAG1547 (1).pdf26 Jul 2017
OtherFile: Sold Flat.pdf26 Jul 2017
OtherFile: Challan Pavati Summery.pdf26 Jul 2017
OtherFile: Building calculation.pdf26 Jul 2017
OtherFile: Company Policy.pdf26 Jul 2017
OtherFile: Annexure 1.pdf26 Jul 2017
OtherFile: Annexure 22.pdf26 Jul 2017
OtherFile: Annexure 3.pdf26 Jul 2017
OtherFile: Annexure 4.pdf26 Jul 2017
OtherFile: IMAG1631 2222.pdf26 Jul 2017
OtherFile: IMAG1632.pdf26 Jul 2017
OtherFile: IMAG1560.pdf26 Jul 2017

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
paramount park'C' paramount park ground floor behind premier automobiles sandap village road in front of lodha regency complex village bhopar taluka kayan dist thane62CompletedAug 2016Aug 2016
paramount park'D' paramount park ground floor behind premier automobiles sandap village road in front of lodha regency complex village bhopar taluka kayan dist thane24CompletedFeb 2009Feb 2009

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep paramount park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhopar7,600+ in Thane

2 kmparamount parkCompleted 11Lapsed / revoked 8Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 61 registered projects within 2 km.

Builder: dilip sudhakar deshmukh

dilip sudhakar deshmukh has 1 registration on MahaRERA, including paramount park. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if paramount park is delayed beyond 30 Dec 2034?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of paramount park?

The registered promoter entity is dilip sudhakar deshmukh, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in paramount park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for paramount park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at paramount park?

The professionals named in the filing: Architect: Ar Pramod Shinde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in paramount park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About paramount park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save paramount park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.