ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / Palm Meadows Annexe

Registration approved Residential/Group Housing project

Palm Meadows Annexe

By Adarsh Developers

RG-KA-07494 · RERA PRM/KA/RERA/1251/310/PR/171207/002357

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Aug 2021Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 39 documents Report an error

Palm Meadows Annexe is a Residential/Group Housing project by Adarsh Developers in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171207/002357 on 7 Dec 2017. Possession is promised by 30 Aug 2021. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NamePalm Meadows Annexe
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/171207/002357
  • ReraGenie IDRG-KA-07494

Builder

  • NameAdarsh Developers
  • Entity typePartnership Firm
  • Authorized SignatoryB M Jayeshankar
  • OthersK B Shivamurthy, Muthuraman I
  • Other registrations5 more →
  • Declared earlier projects8 →

Key dates

this monthRegisteredDec 2017First promiseNov 2020Revised toAug 2021

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on7 Dec 2017
  • Promised completion30 Aug 2021
  • Revised completionRevised to 30 Aug 2021 (originally 30 Nov 2020)
  • Buildings9 building records
  • Documents filed39 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1---101
2---101
3---101
4---101
5---101
6---101
7---101
8---101
9---101

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyNoNot applicable
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalNoNot applicable
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Staircases and Lift lobbies, corridor,lobbies, corridorNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,716 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 15.62 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRajani PM
EngineerRADHA B P

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionNov 2020 → Aug 2021

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed39

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171207/002357 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: AD Partnership deed.pdf-
CC-
10-Building plan-
11-Layout plan-
20-Proforma Sale Deed-
12-Sale Agreement-
Sale Deed+RTC-
14-Section plan-
15-Development plan-
16-Allotment Letter-
22-Specs-
8-EC-
Palm Medows Annexe BMP khata-
18-NA-
9-Layout plan-
14-Section plan-
Conversion Order-
Balance Sheet 2016 - 2017File: 2015-16.pdf-
Balance Sheet 2015 - 2016File: 2014-15.pdf-
Balance Sheet 2014 - 2015File: 2013-14.pdf-
Audited Profit and Loss Statement 2016 - 2017File: 2015-16.pdf-
Audited Profit and Loss Statement 2015 - 2016File: 2014-15.pdf-
Audited Profit and Loss Statement 2014 - 2015File: 2013-14.pdf-
Director's Report 2016 - 2017File: 3- NA.pdf-
Director's Report 2015 - 2016File: 3- NA.pdf-
Director's Report 2014 - 2015File: 3- NA.pdf-
Cash Flow Statement 2016 - 2017File: 4- NA.pdf-
Cash Flow Statement 2015 - 2016File: 4- NA.pdf-
Auditor's Report 2016 - 2017File: Auditor report 16-17.pdf-
Auditor's Report 2015 - 2016File: Auditor report 15-16.pdf-
Auditor's Report 2014 - 2015File: Auditor report 14-15.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: 2016-17.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: 2015-16.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: 2014-15.pdf-
19-Form B-
Prospectus/BrochureFile: Pam Meadows Brochure 9x9_30-4-18 with rera no (1).pdf-
Advertisement Copy 1File: ET-half-page-ad--Aug22-Final.jpg-
Advertisement Copy 2File: Palm Meadows WhitefieldPlus-329x470mm-Artwork.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_171207_002357.xlsx-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
Adarsh Premia-Phase 1-OngoingJun 2020Not delivered
Adarsh Citrine-OngoingAug 2018Not delivered

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Palm Meadows Annexe on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmPalm Meadows AnnexeOther 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 43 registered projects within 2 km.

Builder: Adarsh Developers

Adarsh Developers has 6 registrations on RERA Karnataka, including Adarsh Welkin Park Villas and Adarsh Premia - Phase 1. Its filings declare 8 earlier projects, none of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Palm Meadows Annexe is delayed beyond 30 Aug 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Palm Meadows Annexe?

The registered promoter entity is Adarsh Developers, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Palm Meadows Annexe?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Palm Meadows Annexe?

The professionals named in the filing: Architect: Rajani PM; Engineer: RADHA B P. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Palm Meadows Annexe?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Palm Meadows Annexe. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Palm Meadows Annexe to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.