Home / Browse projects / Nanded, Maharashtra / PALDEWAR CITY
PALDEWAR CITY
RG-MH-01913 · RERA P51100012289 · Last updated on MahaRERA portal: 12 Dec 2024
Source: official MahaRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nanded registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PALDEWAR CITY is a Plotted project by PRAVEEN NAGNATH PALDEWAR in Nanded, Maharashtra, registered with MahaRERA as P51100012289 on 1 Sep 2017. The registration is recorded completed; possession was promised by 30 Jul 2024. The completion date has moved by 12 months from the original filing. 30 of the 40 units on this registration are recorded sold or booked.
At a glance
Project
- NamePALDEWAR CITY
- TypePlotted
- Location
- Nanded Waghala (M Corp.)
- Nanded
- 431605
- Pincode431605
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51100012289
- ReraGenie IDRG-MH-01913
Builder
- NamePRAVEEN NAGNATH PALDEWAR
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on1 Sep 2017
- Promised completion30 Jul 2024
- Revised completionRevised to 30 Jul 2024 (originally 31 Jul 2023)
- BuildingsNot stated in filing
- Documents filed72 files
Current status
Figures as on 12 Dec 2024, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities16
As on 12 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 70% |
| Water Supply | No | Not applicable |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| LAYOUT AREA FENCING AND PLOT DEMARKATION | Yes | 8% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners1
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DEEPAK KULKARNI AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| PRAVEEN NAGNATH PALDEWAR | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe delay in development of land was caused due to scarcity of labour & material during the covid time. The area is located at a remote location and there is a huge shortage of labour supply. However, major development work has been completed and only few work is pending which will be easily completed in a year time. Therefore, it is requested to grant the extension.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 5 Aug 2024
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Signed Form 4.pdf | 12 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: NA.pdf | 5 Aug 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Final Layout.pdf | 5 Aug 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Final Layout part.pdf | 5 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Adobe Scan 13 Dec 2023 (1).pdf | 13 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Self Certification for no withdrawal June 23.pdf | 5 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Self Certification for no withdrawal Sept 23.pdf | 5 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Self Certification for no withdrawal June 23.pdf | 5 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Self Certification for no withdrawal Sept 23.pdf | 5 Dec 2023 |
| Certificates of CA (Form 3)File: Self Certification for no withdrawal Sept 23.pdf | 5 Dec 2023 |
| Certificates of CA (Form 3)File: Self Certification for no withdrawal June 23.pdf | 5 Dec 2023 |
| Declaration in FORM BFile: declaration-supported-by-an-affidavit-which-shall-be-signed-by-the-promoter-or-any-person- | 8 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf | 8 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Quality Assurance Certificate New 2023.pdf | 2 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 14 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2023.pdf | 30 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 March 23 compressed.pdf | 18 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Self Certification 2017-18.pdf | 22 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Self Certification 2018-19.pdf | 22 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Self Certification 2019-20.pdf | 22 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Self Certification 2020-21.pdf | 22 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Self Certification 31-12-2021.pdf | 22 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Self Certification 31-03-2022.pdf | 22 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Self Certification 30-06-2022.pdf | 22 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Self Certification 30-09-2022.pdf | 22 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Self Certification 31-12-2022.pdf | 22 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Self Certification 31-12-2022.pdf | 22 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Self Certification 2017-18.pdf | 22 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Self Certification 2018-19.pdf | 22 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Self Certification 2019-20.pdf | 22 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Self Certification 2020-21.pdf | 22 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Self Certification 31-12-2021.pdf | 22 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Self Certification 31-03-2022.pdf | 22 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Self Certification 30-09-2022.pdf | 22 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Self Certification 30-06-2022.pdf | 22 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Self Certification 31-12-2022.pdf | 22 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A - Quality Assurance Certificate New 2020.pdf | 22 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Quality Assurance Certificate New 2021.pdf | 22 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Quality Assurance Certificate New 2022.pdf | 22 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - Quality Assurance Certificate New 2023.pdf | 22 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 5 2019-20.pdf | 19 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 5 2020-21.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Self Certification 2017-18.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Self Certification 2018-19.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Self Certification 2020-21.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Self Certification 2019-20.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Self Certification 31-12-2021.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Self Certification 31-03-2022.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Self Certification 30-06-2022.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Self Certification 30-09-2022.pdf | 19 Apr 2023 |
| Certificates of CA (Form 3)File: Self Certification 31-12-2022.pdf | 19 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 2017-18.pdf | 19 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19.pdf | 19 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20.pdf | 19 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020-21.pdf | 19 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 2021-22.pdf | 19 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-ilovepdf-compressed.pdf | 30 Apr 2018 |
| Building plan approval or NA orderFile: LAYOUT_PLAN.PDF | 1 Aug 2017 |
| Layout approvalFile: SANCTIONED LAYOUT PLAN.pdf | 1 Aug 2017 |
| Layout approvalFile: SANCTIONED LAYOUT PLAN.pdf | 1 Aug 2017 |
| PAN CardFile: Pan_Card Praveen Sir.PDF | 1 Aug 2017 |
| Copy of the legal title reportFile: Tittle Report.pdf | 1 Aug 2017 |
| Details of encumbrancesFile: Paldewar_Non_Encurbance.PDF | 1 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: SANCTIONED LAYOUT PLAN.pdf | 1 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: SANCTIONED LAYOUT PLAN.pdf | 1 Aug 2017 |
| Building Plan Approval (IOD)File: LAYOUT_PLAN.PDF | 1 Aug 2017 |
| Declaration in FORM BFile: NEW PROMOTERS AGREEMENT.pdf | 1 Aug 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: NEW ARCHITECT REPORT.pdf | 1 Aug 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: New Engineers Certificate.pdf | 1 Aug 2017 |
| Certificates of CA (Form 3)File: CA Certificate-Form 3.pdf | 1 Aug 2017 |
| Proforma of Allotment letterFile: AGREEMENT TO SALE LATEST-ilovepdf-compressed.pdf | 1 Aug 2017 |
| Proforma of Allotment letterFile: AGREEMENT TO SALE LATEST-ilovepdf-compressed.pdf | 1 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nanded
Computed across the 100+ Nanded projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 72 filed documents as one ZIP, foldered, with a manifest
Keep PALDEWAR CITY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nanded Waghala (M Corp.)100+ in Nanded
Filed coordinates, straight-line distance. 5 registered projects within 2 km.
Padmavati Empire
Padmavati Developers
Padmavati Empire Wing B
Padmavati Developers
DEEPJYOTI
JYOTI DEEPAK PUJARI
Om residency
Sangam developers
SHREE RAMA TOWNSHIP
SHREE RAMA CONSTRUCTION
SIDDHI ENCLAVE
SIDDHI HOMES
See every Nanded project, with the district possession charts
Builder: PRAVEEN NAGNATH PALDEWAR
PRAVEEN NAGNATH PALDEWAR has 1 registration on MahaRERA, including PALDEWAR CITY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nanded district page.
Frequently asked questions
What are my rights if PALDEWAR CITY is delayed beyond 30 Jul 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PALDEWAR CITY?
The registered promoter entity is PRAVEEN NAGNATH PALDEWAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PALDEWAR CITY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PALDEWAR CITY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PALDEWAR CITY?
The professionals named in the filing: Architect: DEEPAK KULKARNI AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PALDEWAR CITY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback