Red flags
- 2 complaints at RERA Karnataka
- Completion date moved by 75 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
Saved.
OZONE CHAMBERS is a Commercial project by ITALIX LIVING SPACES PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as TOR/PRM/KA/RERA/1251/310/PR/200109/001521 on 9 Jan 2020. Possession is promised by 31 Dec 2025. The completion date has moved by 75 months from the original filing. 16 of the 16 units on this registration are recorded sold or booked, and 0 of 17 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameOZONE CHAMBERS
- TypeCommercial
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.TOR/PRM/KA/RERA/1251/310/PR/200109/001521
- ReraGenie IDRG-KA-70607
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on9 Jan 2020
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Sep 2019)
- Buildings1 building record
- Documents filed67 files
Current status
Figures as on 24 Feb 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Ozone Chamber | - | - | - | 0 | 16 | 16 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 24 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 17 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 98%.
Building: 31% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 98% |
| Foundation footing work | 70% |
| Retaining wall (All types) | 50% |
| Plinth level Beam | Not applicable |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| RCC or MS Framed structure | 0% |
| Masonry construction: Bricks, Concrete blocks etc | 53% |
| Plastering inside , outside & Ceiling | 42% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 22% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 50% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | 50% |
| Weather Proof work(tile,concrete) | 50% |
| Painting | 0% |
| Elevation work | 0% |
| Internal and External work including landscapes as per santioned drawings | 50% |
Progress on shared amenities41
As on 24 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Water conservation | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Education/Health/Other public amenities | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 0% |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning And incerntion | Yes | 0% |
| Staircases | Yes | 55% |
| Lifts | Yes | 55% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 55% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 55% |
| Outer Wall | Yes | 55% |
| Open parking areas and common storage spaces | Yes | 0% |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | Yes | 0% |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 245.09 cr | Rs 132.90 cr |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Reason as filed by the promoterAwaiting Approvals; Delay in Approvals
No reason recorded in the filing
Complaints filed with RERA Karnataka2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| 01895/2023 | - | ITALIX LIVING SPACES PVT LTD | 30/12/2023 |
| 00290/2026 | - | ITALIX LIVING SPACES PVT LTD | 24/03/2026 |
Documents filed67
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number TOR/PRM/KA/RERA/1251/310/PR/200109/001521 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: RERA CA FORM 4 DEC 2025 OZONE CHAMBERS.pdf | 24 Feb 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: dec.pdf | 24 Feb 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer (QU)_Chambers Q3 Dec-2025 (1).pdf | 24 Feb 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 24 Feb 2026 |
| Q3 2025-26 KPTCL- BESCOM | 24 Feb 2026 |
| Q3 2025-26 Fire and Safety | 24 Feb 2026 |
| Q3 2025-26 Airport Authority of India | 24 Feb 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 24 Feb 2026 |
| CertificateFile: COI MOA AOA ITALIX.PDF | - |
| Project Details | - |
| Architect Certificate for Work Completion Schedule till DateFile: Affidavit for Extension OC.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: Engineer Certificate Ozone chambers.pdf | - |
| CA Certificate for Funds UtilizationFile: CA certificate.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Affidavit for Extension OC.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: Engineer Certificate Ozone chambers.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: CA certificate.pdf | - |
| AffidavitFile: Affidavit for Extension OC.pdf | - |
| Latest Encumbrance CertificateFile: EC.pdf | - |
| Consent letter from 2/3rd of AllotteesFile: Consent Letter.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: Sold & unsold units.xlsx | - |
| Document 1File: Form B Declaration.pdf | - |
| Document 2File: Bank statement.pdf | - |
| Document 3File: Affidavit for Comm Sec 18.pdf | - |
| Document 4File: Partial C C for Resi Commercial.pdf | - |
| Document 5File: CA certificate - funds required Chambers.pdf | - |
| Document 6File: CA certificate - fund utilized Chambers.pdf | - |
| COMMENCEMENT CERTIFICATE (1) | - |
| Approved Building Plan | - |
| Approved Layout Plan | - |
| Sale deed final | - |
| Elevation Section | - |
| BDA_DP_Signed_Commercial | - |
| Project Specification Commercial FINAL | - |
| EC | - |
| Sec 3 Affidavit | - |
| BBMP Khatha and Extract | - |
| Note Raheja Chambers | - |
| Relinquish Deed | - |
| FIRE Noc | - |
| Airports Authority NOC | - |
| KSPCB Noc | - |
| MOEF Noc | - |
| Approved Layout Plan | - |
| Elevation Section | - |
| conversion orders | - |
| Title Search Report | - |
| Balance Sheet 2018 - 2019File: Declaration for Financial Details.pdf | - |
| Balance Sheet 2017 - 2018File: Declaration for Financial Details.pdf | - |
| Balance Sheet 2016 - 2017File: Declaration for Financial Details.pdf | - |
| Audited Profit and Loss Statement 2018 - 2019File: Declaration for Financial Details.pdf | - |
| Audited Profit and Loss Statement 2017 - 2018File: Declaration for Financial Details.pdf | - |
| Audited Profit and Loss Statement 2016 - 2017File: Declaration for Financial Details.pdf | - |
| Director's Report 2018 - 2019File: Declaration for Financial Details.pdf | - |
| Director's Report 2017 - 2018File: Declaration for Financial Details.pdf | - |
| Director's Report 2016 - 2017File: Declaration for Financial Details.pdf | - |
| Cash Flow Statement 2018 - 2019File: Declaration for Financial Details.pdf | - |
| Cash Flow Statement 2017 - 2018File: Declaration for Financial Details.pdf | - |
| Auditor's Report 2018 - 2019File: Declaration for Financial Details.pdf | - |
| Auditor's Report 2017 - 2018File: Declaration for Financial Details.pdf | - |
| Auditor's Report 2016 - 2017File: Declaration for Financial Details.pdf | - |
| Income Tax Return Acknowledgement 2018 - 2019File: Declaration for Financial Details.pdf | - |
| Income Tax Return Acknowledgement 2017 - 2018File: Declaration for Financial Details.pdf | - |
| Income Tax Return Acknowledgement 2016 - 2017File: Declaration for Financial Details.pdf | - |
| Form B | - |
| Prospectus/BrochureFile: Ozone Chambers ebrochure_compressed (1).pdf | - |
| Advertisement Copy 1File: Ozone Chambers ebrochure_compressed (1).pdf | - |
| Tower Excel SheetFile: TORPRMKARERA1251310PR200109001521 (1).xlsx | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep OZONE CHAMBERS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: ITALIX LIVING SPACES PVT LTD
ITALIX LIVING SPACES PVT LTD has 4 registrations on RERA Karnataka, including Pebble Bay -Koramangala Phase I and OZONE CHAMBERS. Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if OZONE CHAMBERS is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of OZONE CHAMBERS?
The registered promoter entity is ITALIX LIVING SPACES PVT LTD, a company as per the filing. Its CIN U45500KA2018PTC115146 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in OZONE CHAMBERS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against OZONE CHAMBERS?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
What should I check before booking in OZONE CHAMBERS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback