Registered No litigation declared Commercial project

ORBIT BUSINESS HUB

By EKATVA DEVELOPERS

RG-MH-17650 · RERA P51700055269 · Last updated on MahaRERA portal: 10 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 97%
136 of 318Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

ORBIT BUSINESS HUB is a Commercial project by EKATVA DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700055269 on 14 Mar 2024. Possession is promised by 31 Dec 2028. 182 of the 318 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameORBIT BUSINESS HUB
  • TypeCommercial
  • Location
    • ROAD NO. 16
    • THANE (WAGLE) INDUSTRIAL AREA
    • Thane (M Corp.)
    • Thane
    • 400604
  • Pincode400604
  • RERA no.P51700055269
  • ReraGenie IDRG-MH-17650

Builder

  • NameEKATVA DEVELOPERS
  • Entity typePartnership
  • PartnersJIGNESH SATRA, DHIR SATRA, PRAVIN CHHEDA, NAVIN BAUVA

Key dates

this monthRegisteredMar 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Mar 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed108 files

Current status

57%182 of 318 units booked
57.6%Work done, per cost certificate

Figures as on 10 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ORBIT BUSINESS HUBNA27200318318

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 10 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 97%.

ORBIT BUSINESS HUB: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed327

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots327
Closed/Covered327

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,640 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Jan 2026

Approvals and building plan

Sanctioning authorityMAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION
Permissible FSI21993.0
Proposed, not sanctioned18,869 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHILPAYAN BUILDING SHIVAJI PATH JAMBALI NAKA THANE WEST 400601
Estimated costRs 70.25 cr
Cost incurredRs 40.50 cr
Work done57.65%
BuildingWingEstimatedIncurred
ORBIT BUSINESS HUBNARs 55.85 crRs 40.50 cr
-NARs 14.40 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDhruv D Patel
EngineerMr. D. K. Patel
Chartered AccountantRohit Ramesh Savla
Chartered AccountantVikram Viresh Bhate
Chartered AccountantPooja Ramsurat Prajapati
PartnerRole in project
EKATVA DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Q4- FY 2025-26 Withdrawal Application Form1 OBH.pdf10 Jun 2026
Withdrawal Update Form 1File: Q4- FY 2025-26 Withdrawal Application Form1 OBH.pdf10 Jun 2026
Withdrawal Update Form 1File: Q4- FY 2025-26 Withdrawal Application Form1 OBH.pdf10 Jun 2026
Withdrawal Update Form 2File: Q4- FY 2025-26 Withdrawal Application Form2 final.pdf10 Jun 2026
Withdrawal Update Form 2File: Q4- FY 2025-26 Withdrawal Application Form2 final.pdf10 Jun 2026
Withdrawal Update Form 2File: Q4- FY 2025-26 Withdrawal Application Form2 final.pdf10 Jun 2026
Withdrawal Update Form 3File: Q4- FY 2025-26 Withdrawal Application Form3.pdf10 Jun 2026
Withdrawal Update Form 3File: Q4- FY 2025-26 Withdrawal Application Form3.pdf10 Jun 2026
Withdrawal Update Form 3File: Q4- FY 2025-26 Withdrawal Application Form3.pdf10 Jun 2026
Form 1File: Ekatva Developers Form-1 Q4 24-25.pdf8 Jun 2026
Form 2File: Ekatva Developers Form 2 Q4 24-25.pdf8 Jun 2026
Form 3File: Form 3_Ekatva Developers - FY 2024-25 Q4.pdf8 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q4 24-25.pdf8 Jun 2026
Withdrawal Update Form 1File: Portal generated Form-1 31-12-25.pdf8 Jun 2026
Withdrawal Update Form 2File: Q3- FY 2025-26 Withdrawal Application Form2.pdf8 Jun 2026
Withdrawal Update Form 3File: Portal generated Form-3 31-12-25.pdf8 Jun 2026
Form 1File: Form-1 FY 2024-25 Q1.pdf6 Jun 2026
Form 2File: Form-2 FY 2024-25 Q1.pdf6 Jun 2026
Form 3File: Form-3 FY 2024-25 Q1.pdf6 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q1 24-25.pdf6 Jun 2026
Form 1File: Form-1 FY 2024-25 Q2.pdf6 Jun 2026
Form 2File: Form-2 FY 2024-25 Q2.pdf6 Jun 2026
Form 3File: Form-3 - FY 2024-25 Q2.pdf6 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q2 24-25.pdf6 Jun 2026
Form 1File: Form-1 FY 2024-25 Q3.pdf6 Jun 2026
Form 2File: Form-2 FY 2024-25 Q3.pdf6 Jun 2026
Form 3File: Form-3 FY 2024-25 Q3.pdf6 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Inventory Q3 24-25.pdf6 Jun 2026
Form 1File: Form-1 Ekatva Developers March 2024.pdf6 Jun 2026
Form 2File: Form-2 Ekatva Developers March 2024.pdf6 Jun 2026
Form 3File: Form-3 Ekatva Developers March 2024.pdf6 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Booked Inventory Q4 23-24.pdf6 Jun 2026
Withdrawal Update Form 1File: Portal generated Form-1 30-09-25.pdf16 May 2026
Withdrawal Update Form 2File: Portal generated Form-2 30-09-25.pdf16 May 2026
Withdrawal Update Form 3File: Portal generated Form-3 30-09-25.pdf16 May 2026
Withdrawal Update Form 1File: Portal Generated - Form-1 30-06-25.pdf5 May 2026
Withdrawal Update Form 2File: Portal generated Form-2 30-06-25.pdf5 May 2026
Withdrawal Update Form 3File: Portal generated Form-3 30-06-25.pdf5 May 2026
Form 5 (FY 2024-2025)File: Form-5 FY 2024-25.pdf12 Feb 2026
Form 5 (FY 2023-2024)File: Final Ekatva Developers-FORM 5 FY 23-24.pdf12 Feb 2026
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 FY 2024-25 Q1.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 FY 2024-25 Q2.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 FY 2024-25 Q3.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 September Quater_0001.pdf24 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 December Quater_0001.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form-3.pdf28 Jan 2025
Building plan approvalFile: B67 - FINAL APPROVAL -1-5.pdf16 Jan 2025
Building plan approvalFile: B67 - FINAL APPROVAL -6-10.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Ekatva Developers Q1 FY 2024-25.pdf16 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: B67 - FINAL APPROVAL -1-5.pdf16 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: B67 - FINAL APPROVAL -6-10.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form-3.pdf11 Dec 2024
Building plan approvalFile: 03 Revised Plan_compressed-1-4.pdf2 Dec 2024
Building plan approvalFile: 03 Revised Plan_compressed-5-7.pdf2 Dec 2024
Building plan approvalFile: 03 Revised Plan_compressed-8-10.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 04 Signed Form-3 signed.pdf2 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Final Self Attested CC Copy_compressed.pdf2 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 03 Revised Plan_compressed-1-4.pdf2 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 03 Revised Plan_compressed-5-7.pdf2 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 03 Revised Plan_compressed-8-10.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: 02 Disclosure of Sold_Booked Inventory.pdf2 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final Ekatva Developers-FORM 5 FY 23-24.pdf22 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Ekatva Developers March 2024.pdf16 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Ekatva Developers March 2024.pdf16 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A FY 23-24.pdf16 May 2024
Disclosure of sold/ booked inventoryFile: Booked Sold_Unsold Inventory.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Ekatva Developers March 2024_compressed.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclouser of Interest 1.pdf19 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclouser of Interest 2.pdf19 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclouser of Interest 3.pdf19 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclouser of Interest 4.pdf19 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Dhir Satra.pdf19 Feb 2024
Other - LegalFile: Deed Of Assignment Dtd 22_07_42022.pdf16 Feb 2024
Other - LegalFile: OLD LEASE DEED AGREEMENT 30061969.pdf16 Feb 2024
Other - LegalFile: Delhi High Court Order 22072006_compressed.pdf16 Feb 2024
Other - TechnicalFile: Annexure A Declaration cum Undertaking.pdf12 Feb 2024
Declaration in FORM BFile: FormB Declaration Notarised - Revised.pdf6 Feb 2024
Proforma of Allotment letterFile: Ekatva Developers - B-67 - Allotment revised.pdf6 Feb 2024
Proforma of Agreement for saleFile: Ekatva Developers - B67 - AFS without consent clause.pdf6 Feb 2024
Copy of the legal title reportFile: B67 Title_compressed.pdf3 Feb 2024

How this compares with Thane

57%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ORBIT BUSINESS HUB on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near THANE (WAGLE) INDUSTRIAL AREA7,600+ in Thane

Builder: EKATVA DEVELOPERS

EKATVA DEVELOPERS has 1 registration on MahaRERA, including ORBIT BUSINESS HUB. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ORBIT BUSINESS HUB is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ORBIT BUSINESS HUB?

The registered promoter entity is EKATVA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ORBIT BUSINESS HUB?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ORBIT BUSINESS HUB?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ORBIT BUSINESS HUB?

The professionals named in the filing: Architect: Dhruv D Patel; Engineer: Mr. D. K. Patel; Chartered Accountant: Rohit Ramesh Savla; Chartered Accountant: Vikram Viresh Bhate; Chartered Accountant: Pooja Ramsurat Prajapati. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ORBIT BUSINESS HUB?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ORBIT BUSINESS HUB. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ORBIT BUSINESS HUB to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.