Home / Browse projects / Bengaluru Urban, Karnataka / Opulent SPIRE

Registration approved Mixed Development project

Opulent SPIRE

By B and B INFRASTRUCTURE LTD

RG-KA-62900 · RERA PRM/KA/RERA/1251/310/PR/171015/000561 · Last updated on RERA Karnataka portal: 24 Mar 2022

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 18 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Jun 2022Possession promisedmoved 18 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 88 documents Report an error

Opulent SPIRE is a Mixed Development project by B and B INFRASTRUCTURE LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171015/000561 on 15 Oct 2017. Possession is promised by 30 Jun 2022. The completion date has moved by 18 months from the original filing.

At a glance

Project

  • NameOpulent SPIRE
  • TypeMixed Development
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/171015/000561
  • ReraGenie IDRG-KA-62900

Builder

  • NameB and B INFRASTRUCTURE LTD
  • Entity typeCompany
  • Authorized SignatoryS.K. BHASKAR RAJU

Key dates

this monthRegisteredOct 2017First promiseDec 2020Revised toJun 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 Oct 2017
  • Promised completion30 Jun 2022
  • Revised completionRevised to 30 Jun 2022 (originally 23 Dec 2020)
  • Buildings2 building records
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
South-----31
North-----30

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 24 Mar 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 24 Mar 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,778 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 71.53 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVenkataramanan associates
EngineerDesign Tree Service consultants Pvt. Ltd.

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2020 → Sep 2021

No reason recorded in the filing

EX/PRM/KA/RERA/1251/310/PR/220604/000561Sep 2021 → Jun 2022

Reason as filed by the promoterAwaiting OC

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed88

As listed on the registration, under the names the promoter filed them with; the newest 80 of 88 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171015/000561 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form BFile: Form B.pdf24 Mar 2022
Bank Letter for change of accountFile: letter from bank.pdf25 Nov 2021
Covid ExtensionFile: rera revised completion date circular.pdf25 Nov 2021
Revised Form BFile: ReraFormB.pdf25 Nov 2021
Form BFile: Form B.pdf14 Oct 2021
Affidavit abiding to pay compensationsiFile: Affidavit (18 (1)).pdf14 Oct 2021
Site PlanFile: Site plan.pdf14 Oct 2021
Covid extensionFile: rera revised completion date circular.pdf14 Oct 2021
NOC from buyersFile: NOC from buyers.pdf14 Oct 2021
List of AllotteesFile: List of allottees.pdf14 Oct 2021
Airport NOCFile: HAL NOC-compressed.pdf14 Oct 2021
Fire ForceFile: NOC (Fire)-compressed.pdf14 Oct 2021
BWSSBFile: BWSSB NOC-compressed.pdf14 Oct 2021
BESCOMFile: BESCOM NOC-compressed.pdf14 Oct 2021
BSNLFile: BSNL NOC-compressed.pdf14 Oct 2021
SEIAAFile: SEIAA-MOEF NOC-compressed.pdf14 Oct 2021
KSPCBFile: CFO.pdf14 Oct 2021
Project member detailsFile: DETAILS OF PROJECT MEMBERS.pdf14 Oct 2021
STP commissioning certificateFile: STP COMPLETITION CERTIFICATE.pdf14 Oct 2021
Engineer CertificateFile: Form 6 Engg certificate.pdf14 Oct 2021
CertificateFile: Registration Certificate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Form Ex 1 (VA).pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Form 5 Engg certificate.pdf-
CA Certificate for Funds UtilizationFile: CA certificate Form Ex-3.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Form Ex 2 (VA).pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Form 6 Engg certificate.pdf-
CA Certificate for Funds required for Project CompletionFile: CA certificate Form Ex-4.pdf-
AffidavitFile: Form Ex 7.pdf-
Latest Encumbrance CertificateFile: EC latest.pdf-
Consent letter from 2/3rd of AllotteesFile: NOC from buyers.pdf-
Details Of Sold/ Un-sold UnitsFile: Sold and unsold units details.pdf-
NOC DetailsFile: CFO.pdf-
Commencement Certificte-
License-
google map-
Sale deed - draft-
Agreement of Sale -draft-
site plan-compressed-
Section-
RTC-
Approved section-
google map-
Allotment letter -draft-
Brochure-
All NOC-
Specifications-
EC 15 -Jul 17-
Khata latest-
Agreement for Development and marketing-
Legal Opinion-compressed-
Conversion Order-
NOC (Fire)-compressed-
HAL NOC-compressed-
BESCOM NOC-compressed-
BWSSB NOC-compressed-
KSPCB NOC-compressed-
SEIAA-MOEF NOC-compressed-
BSNL NOC-compressed-
BMRCL NOC-
site plan-compressed-
Balance Sheet 2015 - 2016File: BS - 16-17.pdf-
Balance Sheet 2014 - 2015File: BS 15-16.pdf-
Balance Sheet 2013 - 2014File: BS-14-15.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P & L 16-17.pdf-
Audited Profit and Loss Statement 2014 - 2015File: P & L 15-16.pdf-
Audited Profit and Loss Statement 2013 - 2014File: P & L 14-15.pdf-
Director's Report 2015 - 2016File: Dir Rep-16-17.pdf-
Director's Report 2014 - 2015File: Dir rep 15-16.pdf-
Director's Report 2013 - 2014File: Dir rep 14-15.pdf-
Cash Flow Statement 2015 - 2016File: Cash flow 16-17.pdf-
Cash Flow Statement 2014 - 2015File: Cash flow 15-16.pdf-
Auditor's Report 2015 - 2016File: Auditors rep-16-17.pdf-
Auditor's Report 2014 - 2015File: Auditors report-15-16.pdf-
Auditor's Report 2013 - 2014File: Auditors report 14-15.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: IT ack --16-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: IT ack 15-16.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: IT Ack -14-15.pdf-
Form B-
Prospectus/BrochureFile: BB-Spire-Brochure_Web.pdf-
Advertisement Copy 1File: Ad.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 18 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Opulent SPIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmOpulent SPIREOther 8Dot size: filed unitsN

Filed coordinates, straight-line distance. 8 registered projects within 2 km.

Builder: B and B INFRASTRUCTURE LTD

B and B INFRASTRUCTURE LTD has 1 registration on RERA Karnataka, including Opulent SPIRE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Opulent SPIRE is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Opulent SPIRE?

The registered promoter entity is B and B INFRASTRUCTURE LTD, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Opulent SPIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Opulent SPIRE?

The professionals named in the filing: Architect: Venkataramanan associates; Engineer: Design Tree Service consultants Pvt. Ltd.. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Opulent SPIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Opulent SPIRE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Opulent SPIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.