ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / ONE&ONLY (Phase II of GR Santhrupthi)

Registration approved Residential/Group Housing project

ONE&ONLY (Phase II of GR Santhrupthi)

By GR CONSTRUCTIONS

RG-KA-05434 · RERA PRM/KA/RERA/1251/308/PR/190829/002827

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Apr 2023Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 55 documents Report an error

ONE&ONLY (Phase II of GR Santhrupthi) is a Residential/Group Housing project by GR CONSTRUCTIONS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/190829/002827 on 29 Aug 2019. Possession is promised by 30 Apr 2023. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameONE&ONLY (Phase II of GR Santhrupthi)
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/190829/002827
  • ReraGenie IDRG-KA-05434

Builder

  • NameGR CONSTRUCTIONS
  • Entity typePartnership Firm
  • Authorized SignatoryEshwar Naidu.RM
  • OthersEshwar Naidu.RM
  • Other registrations2 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2019First promiseJul 2022Revised toApr 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on29 Aug 2019
  • Promised completion30 Apr 2023
  • Revised completionRevised to 30 Apr 2023 (originally 31 Jul 2022)
  • Buildings1 building record
  • Documents filed55 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D---29029

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Staircases and Lift lobbies, corridor,lobbies, corridorNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,262 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 25.01 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. Grey scale DESIGN Studio LLP
EngineerCIVITECH DESIGNS

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJul 2022 → Apr 2023

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed55

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/190829/002827 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Acknowkedgement Registration of firm.pdf-
Plan License-
EC from apr 2016 to may 2019-
All plans-
SALE DEED-
SALE AGREEMENT-
Tax Paid-
plan 4-
GRPLAN-
Allotment letter-
GRSanthrupthi_Brochure_Phase2-
Affidavit notary-
Specificfation-
EC April 14 to March 16-
Plan License-
CONVERSION ORDER-
Katha-
JD-
will deed-
affidavit cum declaration-
EC aprl 16 to may 2019 Phase-2-
sanction plan marking-
Water NOC-
EC 2004 to 2014-
Land detailes-
Pollution NOC-
ALL PLANS-
ALL PLANS-
KSP Pollution control board-
CHANGE OF LAND USE-
SEIAA NOC-
Balance Sheet 2017 - 2018File: Balance cheet 17-18.pdf-
Balance Sheet 2016 - 2017File: Balance Sheet 16-17.PDF-
Balance Sheet 2015 - 2016File: balance sheet 15-16.PDF-
Audited Profit and Loss Statement 2017 - 2018File: Profit & Loss 17-18.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Profit & Loss 16-17.PDF-
Audited Profit and Loss Statement 2015 - 2016File: audit report 15-16.pdf-
Director's Report 2017 - 2018File: Audit report 17-18.pdf-
Director's Report 2016 - 2017File: Audit report 2016-17.pdf-
Director's Report 2015 - 2016File: audit report 15-16.pdf-
Cash Flow Statement 2017 - 2018File: Audit report 17-18.pdf-
Cash Flow Statement 2016 - 2017File: cash flow 16-17.pdf-
Auditor's Report 2017 - 2018File: Audit report 17-18.pdf-
Auditor's Report 2016 - 2017File: Audit report 2016-17.pdf-
Auditor's Report 2015 - 2016File: audit report 15-16.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITR 17-18.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 16-17.PDF-
Income Tax Return Acknowledgement 2015 - 2016File: ITR 15-16.PDF-
Form-B notary-
Prospectus/BrochureFile: P II Brochure.pdf-
Advertisement Copy 1File: P II Brochure.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_308_PR_190829_002827.xlsx-
Loan raised documentFile: phase-2 sanscen letter.pdf-
Occupancy CertificateFile: Phase 2 OC.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affdavit.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep ONE&ONLY (Phase II of GR Santhrupthi) on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmONE&ONLY (Phase II of GROther 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 46 registered projects within 2 km.

Builder: GR CONSTRUCTIONS

GR CONSTRUCTIONS has 3 registrations on RERA Karnataka, including GR SITARA and ONE&ONLY (Phase 1 of GR Santhrupthi). Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if ONE&ONLY (Phase II of GR Santhrupthi) is delayed beyond 30 Apr 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ONE&ONLY (Phase II of GR Santhrupthi)?

The registered promoter entity is GR CONSTRUCTIONS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ONE&ONLY (Phase II of GR Santhrupthi)?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ONE&ONLY (Phase II of GR Santhrupthi)?

The professionals named in the filing: Architect: M/s. Grey scale DESIGN Studio LLP; Engineer: CIVITECH DESIGNS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ONE&ONLY (Phase II of GR Santhrupthi)?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ONE&ONLY (Phase II of GR Santhrupthi). Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ONE&ONLY (Phase II of GR Santhrupthi) to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.