Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Aug 2022Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 50 documents Report an error

ONE&ONLY (Phase 1 of GR Santhrupthi) is a Residential/Group Housing project by GR CONSTRUCTIONS in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/180319/002414 on 19 Mar 2018. Possession is promised by 30 Aug 2022. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameONE&ONLY (Phase 1 of GR Santhrupthi)
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/180319/002414
  • ReraGenie IDRG-KA-32838

Builder

  • NameGR CONSTRUCTIONS
  • Entity typePartnership Firm
  • Authorized SignatoryG.Ramana Babu
  • DirectorR.M.Eshwar Naidu
  • Other registrations2 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2018First promiseNov 2021Revised toAug 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on19 Mar 2018
  • Promised completion30 Aug 2022
  • Revised completionRevised to 30 Aug 2022 (originally 30 Nov 2021)
  • Buildings3 building records
  • Documents filed50 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---16016
B---16016
C---13013

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyNoNot applicable
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Staircases and Lift lobbies, corridor,lobbies, corridorNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,500 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 48.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. Grey scale DESIGN Studio LLP
EngineerCIVITECH DESIGNS

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionNov 2021 → Aug 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed50

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/180319/002414 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Acknowkedgement Registration of firm.pdf-
Sanction letter-
SANCTION PLAN 1-2-
SANCTION PLAN 3-
Sale deed New-
Agreement draft upload-
Transfer deed-
SANCTION PLAN 4-
SANCTION PLAN 5-
allotment letter-
Brocher-
Specifications New-
EC-
Khatha-
Land documents-
Transfer deed-
Convertion order-
Water NOC-
Pollution NOC-
SANCTION PLAN-
SANCTION PLAN-
BDA Change of land letter ,Betterment charges and Receipt-
Balance Sheet 2016 - 2017File: Balance Sheet 1617.PDF-
Balance Sheet 2015 - 2016File: balance sheet 15-16.PDF-
Balance Sheet 2014 - 2015File: Balance sheet 14-15.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Profit & Loss 16-17.PDF-
Audited Profit and Loss Statement 2015 - 2016File: profit & loss 15-16.PDF-
Audited Profit and Loss Statement 2014 - 2015File: profit & loss 14-15.pdf-
Director's Report 2016 - 2017File: Audit report 2016-17.pdf-
Director's Report 2015 - 2016File: audit report 15-16.pdf-
Director's Report 2014 - 2015File: auditreport 14-15.pdf-
Cash Flow Statement 2016 - 2017File: cash flow 16-17.pdf-
Cash Flow Statement 2015 - 2016File: cash flow 15-16.pdf-
Auditor's Report 2016 - 2017File: Audit report 2016-17.pdf-
Auditor's Report 2015 - 2016File: audit report 15-16.pdf-
Auditor's Report 2014 - 2015File: auditreport 14-15.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 16-17.PDF-
Income Tax Return Acknowledgement 2015 - 2016File: ITR 15-16.PDF-
Income Tax Return Acknowledgement 2014 - 2015File: ITR 14-15.pdf-
Declaration Form B-
Prospectus/BrochureFile: broucher.pdf-
Advertisement Copy 1File: advertisment copy.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_308_PR_180319_002414.xlsx-
Loan raised documentFile: Image_1005.pdf-
Stability CertificateFile: Structural certificate one and only phase l.pdf-
Occupancy CertificateFile: Santrupthi Phase I OC.pdf-
Consent for operation issued by KSPCBFile: CFO .pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: Water NOC (2).pdf-
Architect certificate for having completed the work(in format no 5)File: completion certificate one and only phase l.pdf-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Image_992.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep ONE&ONLY (Phase 1 of GR Santhrupthi) on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmONE&ONLY (Phase 1 of GR Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 44 registered projects within 2 km.

Builder: GR CONSTRUCTIONS

GR CONSTRUCTIONS has 3 registrations on RERA Karnataka, including GR SITARA and ONE&ONLY (Phase 1 of GR Santhrupthi). Its filings declare 1 earlier project, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if ONE&ONLY (Phase 1 of GR Santhrupthi) is delayed beyond 30 Aug 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of ONE&ONLY (Phase 1 of GR Santhrupthi)?

The registered promoter entity is GR CONSTRUCTIONS, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in ONE&ONLY (Phase 1 of GR Santhrupthi)?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at ONE&ONLY (Phase 1 of GR Santhrupthi)?

The professionals named in the filing: Architect: M/s. Grey scale DESIGN Studio LLP; Engineer: CIVITECH DESIGNS. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ONE&ONLY (Phase 1 of GR Santhrupthi)?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ONE&ONLY (Phase 1 of GR Santhrupthi). Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ONE&ONLY (Phase 1 of GR Santhrupthi) to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.