Home / Browse projects / Bengaluru Urban, Karnataka / NVT MYSTIC GARDEN

Registration approved Residential/Group Housing project

NVT MYSTIC GARDEN

By NVT QUALITY LIFESTYLE PROJECTS PRIVATE LIMITED

RG-KA-85466 · RERA PRM/KA/RERA/1251/308/PR/180222/002616

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2022Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 78 documents Report an error

NVT MYSTIC GARDEN is a Residential/Group Housing project by NVT QUALITY LIFESTYLE PROJECTS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/180222/002616 on 22 Feb 2018. Possession is promised by 30 Mar 2022. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameNVT MYSTIC GARDEN
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/180222/002616
  • ReraGenie IDRG-KA-85466

Builder

  • NameNVT QUALITY LIFESTYLE PROJECTS PRIVATE LIMITED
  • Entity typeCompany
  • Authorized SignatoryVIVEK GARG
  • DirectorNITIN GARG
  • Other registrations1 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredFeb 2018First promiseJun 2021Revised toMar 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on22 Feb 2018
  • Promised completion30 Mar 2022
  • Revised completionRevised to 30 Mar 2022 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NVT MYSTIC GARDEN---83083

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)Not applicable
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesNoNot applicable
LiftsNoNot applicable
Staircases and Lift lobbies, corridor,lobbies, corridorNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area28,732 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 45.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectChaitanya KK
EngineerPruthviraj

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionJun 2021 → Mar 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed78

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/180222/002616 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Certificate of Incorporation- NVTQLS.pdf-
cc-
Approved Plan-
Approved Plan-
SD PROF-
AGS Prof-
Sale Deed & RTC-
Approved Plan-
Approved Plan-
Proforma Allotment letter-
BROCHURE-
Specificaiton-
EC all-
Khatha-
JDA 2-
Title Deed compressed-
Conversion-Compressed_compressed-
APPROVAL OR NOC U SEC 14 OF KTCP ACT-
UTITLISATION CERTIFICATE-
TRANSFER OF DEVELOPMENT RIGHTS CERTIFICATE-
RELINQUISHMENT DEED-
FIRE DEPARTMENT-
AIRPORT AUTHORITY-
BESCOM BWSSB-
BESCOM BWSSB-
KSPCB-NOC_compressed-
SEIAA-
BSNL-
NOC IN CASE OF BUILDING PROPOSALS ABUTTING TO NEIGHBOURING PROEPRTIES-
Unnamed document-
URBAN LAND CEILING-
BMRCL-
BANGALORE ARTS COMMISSION-
INPECTOR OF FACTORIES CONTRLLER OF EXPLOSIVES RAILWAYSINSPECTOR OF FACTORIES CONTROL OF EX-
DISTRICT MAGISTRATE-
COASTAL REGULATION ZONE AUTHORITY-
CERTIFICATE FROM REG ENG OR STRUCTURAL SAFETY-
Section Drawings-
Approved Plan-
Plan and Drawings-
Change of Land Use Order-
Adv Search Report compressed-
Balance Sheet 2016 - 2017File: BALANCE SHEET 2017.pdf-
Balance Sheet 2015 - 2016File: Balance Sheet 2015-16.pdf-
Balance Sheet 2014 - 2015File: Balance Sheet 2015-16.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Statement of Profit and Loss 2017.pdf-
Audited Profit and Loss Statement 2015 - 2016File: auditor report 15-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Auditor Report 13 14.pdf-
Director's Report 2016 - 2017File: Directorreport15_16.pdf-
Director's Report 2015 - 2016File: Directorreport15_16.pdf-
Director's Report 2014 - 2015File: Director Report F Y 1415.pdf-
Cash Flow Statement 2016 - 2017File: Directorreport15_16.pdf-
Cash Flow Statement 2015 - 2016File: NVT Auditor Report 1516.pdf-
Auditor's Report 2016 - 2017File: NVT Auditor Report 1516.pdf-
Auditor's Report 2015 - 2016File: NVT Auditor Report 1516.pdf-
Auditor's Report 2014 - 2015File: Audit Report 1415.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: Income Tax 2017.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: NVT QUALITY LIFESTYLE PROJECTS PRIVATE LIMITED_30-Sep-2015_836333881.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: NVT QUALITY LIFESTYLE PROJECTS PRIVATE LIMITED_13-Oct-2016_493652511.pdf-
Form B (2)-
Prospectus/BrochureFile: NVT Mystic Garden Brochure.pdf-
Advertisement Copy 1File: Advertisement.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_308_PR_180222_002616.xlsx-
Stability CertificateFile: STRUCTURAL STABILITY.pdf-
NOC issued by the Fire Force department after completion of workFile: FIRE NOC.pdf-
Occupancy CertificateFile: OC & CC.pdf-
Consent for operation issued by KSPCBFile: KSPCB STP.pdf-
Certificate of operation for lifts issued by the Chief of Department of Electrical inspectorate Government of File: BESCOM NOC.pdf-
Sanctioned Letter issued by concerned ESCOM of Power sanction and details of transformer installed and whetherFile: BESCOM NOC.pdf-
Sanctioned letter issued by concerned water supply and sanitary board for the projectFile: WATER NOC.pdf-
Details of external infrastructure work such as drive way, play area, park, STP and water treatment plant, WheFile: OC & CC.pdf-
Architect certificate for having completed the work(in format no 5)File: Form 5 Architect CC.pdf-
Chartered Accountant certificate for having completed the work(in format no 4)File: Form 4 CA CC.PDF-
Affidavit cum declaration from promoter for having completed the project as per specification and as per adverFile: Affidavits.pdf-
Aprooved PlanFile: Aprooved Plan.pdf-
Site PlanFile: Site Plan.pdf-
Form 6 Engineer CCFile: Form 6 Engineer CC.pdf-
Relinquishment DeedFile: Relinquishment Deed.pdf-

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
NVT LIFE SQUARE-OngoingAug 2021Not delivered

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep NVT MYSTIC GARDEN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmNVT MYSTIC GARDENOther 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: NVT QUALITY LIFESTYLE PROJECTS PRIVATE LIMITED

NVT QUALITY LIFESTYLE PROJECTS PRIVATE LIMITED has 2 registrations on RERA Karnataka, including NVT MYSTIC GARDEN and NVT STOPPING BY THE WOODS. Its filings declare 4 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if NVT MYSTIC GARDEN is delayed beyond 30 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of NVT MYSTIC GARDEN?

The registered promoter entity is NVT QUALITY LIFESTYLE PROJECTS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in NVT MYSTIC GARDEN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at NVT MYSTIC GARDEN?

The professionals named in the filing: Architect: Chaitanya KK; Engineer: Pruthviraj. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NVT MYSTIC GARDEN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NVT MYSTIC GARDEN. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NVT MYSTIC GARDEN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.