Home / Browse projects / Mumbai Suburban, Maharashtra / North Sea Heights (A1) - 15th to 18th floor
North Sea Heights (A1) - 15th to 18th floor
By Rare Townships Private Limited
RG-MH-10831 · RERA P51800001036 · Last updated on MahaRERA portal: 31 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- 7 complaints at MahaRERA
- Completion date moved by 18 months
- 2 extensions taken
- Rs 296.00 crore secured on the land, in favour of SWAMIH Investment Fund
- The charge is held by SWAMIH Investment Fund, a distressed-debt buyer or stressed-asset fund rather than an originating lender
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
7 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
North Sea Heights (A1) - 15th to 18th floor is a Residential / Group Housing project by Rare Townships Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001036 on 25 Jul 2017. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 18 months from the original filing. 27 of the 32 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 7 complaints are on record with the regulator.
At a glance
Project
- NameNorth Sea Heights (A1) - 15th to 18th floor
- TypeResidential / Group Housing
- Location
- Mankhurd Ghatkopar Link Road
- Ghatkopar East
- Ghatkopar
- Kurla
- Mumbai Suburban
- 400077
- Pincode400077
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800001036
- ReraGenie IDRG-MH-10831
Builder
- NameRare Townships Private Limited
- Entity typeCompany
- CINU70102MH2000PTC126999
- GSTIN27AAACI7331M1ZD
- DirectorDattatreya Prabhu
- Other registrations15 more →
- Completed9 of 16
- No longer live5 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on25 Jul 2017
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed163 files
Current status
Figures as on 31 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Rising City - North Sea Heights - 15 to 18 Floor | NA | 4 | 4 | 32 | 0 | 32 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 31 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
Rising City - North Sea Heights - 15 to 18 Floor: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 31 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 95% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 95% |
| Street Lighting | Yes | 95% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
Parking filed48
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Rising City - North Sea Heights - 15 to 18 Floor | NA | Rs 21.48 cr | Rs 18.79 cr |
| - | NA | Rs 1.45 cr | - |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AAKAR ARCHITECTS (Umesh Pawar) |
| Architect | Citygold Management Service Private Limited |
| Engineer | Structural Engg:- JW+ Cosulants LLP (Mr.Achyut Watve) |
| Engineer | JW Consultants LLP |
| Engineer | PANDURANG BHOITE |
| Chartered Accountant | Niraj D. Adatia & Associates |
| Chartered Accountant | Maloo Rathod and Company |
| Chartered Accountant | NDDA & ASSOCIATES LLP CHARTERED ACCOUNTANT |
| Chartered Accountant | Sanket R Shah & Associates Chartered Accountants |
| Partner | Role in project |
|---|---|
| Rare Townships Private Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterReason for delay:- A Public Interest Litigation had been filed in High Court pleading to restrict the height to 77.68 Mts. The Honorable High Court issued its order on 06.04.2018 restricting the height of the building. Thereafter we received the commencement certificate on 12.04.2022. And only on 25.08.2023, we got revised Environmental Clearance. Due to the said delays and constraints beyond our control the project got delayed. All documents referred to above are attached for your reference. Based on the same, request you to extend the Project completion date for a period of one year i.e. til
Reason as filed by the promoterConstruction completed before due date , however OC received late due to election duties for the government officers.
Complaints filed with MahaRERA7
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000056440 | SUNIL KUMAR | RARE TOWNSHIPS PVT. LTD. | 04/10/2018 |
| CC006000000100369 | ApurvaAshwin Desai Mansi Apurva Desai | Rare Township Private Limited | 01/08/2019 |
| CC006000000196068 | Prakash Yeshwant Karnik and Anjali Karnik | Rare Townships Private Limited | 18/02/2021 |
| CC006000000196356 | Mayur Ramesh Shah | Rare Townships Private Limited | 15/03/2021 |
| CC006000000196478 | Himanshu Gupta and Richa Bans | Rare Townships Private Limited | 24/03/2021 |
| CC006000000195595 | DHARMENDRA KUMAR SHARMA | RARE TOWNSHIPS PVT LTD | 12/02/2021 |
| CC006000000196368 | RARE TOWNSHIPS PRIVATE LIMITED | APURVA ASHWIN DESAI | 16/03/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Aug 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Mar 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed163
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 163 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: North Sea Heights-15th to 18th floor.pdf | 31 Jul 2026 |
| Withdrawal Update Form 1File: FORM - I P51800001036 - RTPL NORTH SEA HEIGHTS (A1) 15TH TO 18TH FLOORS.pdf | 22 Jul 2026 |
| Withdrawal Update Form 2File: Form II - A1-P2 -15th to 18th Floor.pdf | 22 Jul 2026 |
| Withdrawal Update Form 3File: FORM - III Scan RTPL_North_P2_160726 signed.pdf | 22 Jul 2026 |
| Withdrawal Update Form 1File: FORM - I P51800001036 - RTPL NORTH SEA HEIGHTS (A1) 15TH TO 18TH FLOORS.pdf | 16 May 2026 |
| Withdrawal Update Form 2File: FORM - II A1-15th to 18th FL.pdf | 16 May 2026 |
| Withdrawal Update Form 3File: Form III - North Sea Heights (A1) (Mar 26) - 15th to 18th Flr F.pdf | 16 May 2026 |
| Withdrawal Update Form 1File: FORM - I P51800001036 - RTPL NORTH SEA HEIGHTS (A1) 15TH TO 18TH FLOORS.pdf | 12 May 2026 |
| Withdrawal Update Form 2File: FORM - II A1-15th to 18th FL.pdf | 12 May 2026 |
| Withdrawal Update Form 3File: Form III - North Sea Heights (A1) (Mar 26) - 15th to 18th Flr F.pdf | 12 May 2026 |
| Layout approvalFile: A1-P2-SANCTIONED NEW LAYOUT HIGHILIGHTED_.pdf | 27 Mar 2026 |
| Form 2A (FY 2024-2025)File: North Sea Heights (A1) - 15th to 18th floor.pdf | 5 Mar 2026 |
| Withdrawal Update Form 1File: P51800001036 - FORM - 1 - RTPL NORTH SEA HEIGHTS (A1) 15TH TO 18TH FLOORS.pdf | 9 Feb 2026 |
| Withdrawal Update Form 1File: P51800001036 - FORM - 1 - RTPL NORTH SEA HEIGHTS (A1) 15TH TO 18TH FLOORS.pdf | 9 Feb 2026 |
| Withdrawal Update Form 2File: P51800001036 - FORM - 2 - RTPL NORTH SEA HEIGHTS (A1) 15TH TO 18TH FLOORS..pdf | 9 Feb 2026 |
| Withdrawal Update Form 2File: P51800001036 - FORM - 2 - RTPL NORTH SEA HEIGHTS (A1) 15TH TO 18TH FLOORS..pdf | 9 Feb 2026 |
| Withdrawal Update Form 3File: Form -3 RTPL A1 15 to 18 Floor.pdf | 9 Feb 2026 |
| Withdrawal Update Form 3File: Form -3 RTPL A1 15 to 18 Floor.pdf | 9 Feb 2026 |
| Form 5 (FY 2024-2025)File: FORM5 - A1-1518th FL.pdf | 2 Dec 2025 |
| Withdrawal Update Form 1File: P51800001036 - RTPL NORTH SEA HEIGHTS (A1) 15TH TO 18TH FLOORS.pdf | 27 Nov 2025 |
| Withdrawal Update Form 2File: Tower_A1_-_15_to_18_Flr[1].pdf | 27 Nov 2025 |
| Withdrawal Update Form 3File: form3_RTPL_A1_1518F_241125 (1).pdf | 27 Nov 2025 |
| Withdrawal Update Form 1File: P51800001036 - RTPL NORTH SEA HEIGHTS (A1) 15TH TO 18TH FLOORS.pdf | 15 Nov 2025 |
| Withdrawal Update Form 2File: Tower_A1_-_15_to_18_Flr[1].pdf | 15 Nov 2025 |
| Withdrawal Update Form 3File: RTPL Form 3 A1-PH-2-30-06-24.pdf | 15 Nov 2025 |
| Certificates of CA (Form 3)File: RTPL Form 3 A1-PH-2-31-03-25_compressed (1).pdf | 22 May 2025 |
| Certificates of CA (Form 3)File: RTPL Form 3 A1-PH-2-31-12-24_compressed.pdf | 5 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800001036 - RTPL NORTH SEA HEIGHTS (A1) 15TH TO 18TH FLOORS.pdf | 30 Apr 2025 |
| Certificates of CA (Form 3)File: RTPL Form 3 A1-PH-2-31-12-24_compressed.pdf | 30 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: North Sea Heights (A1) - 15th to 18th floor.pdf | 30 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: North Sea Heights (A1) - 15th to 18th floor.pdf | 30 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: P51800001036 - RTPL NORTH SEA HEIGHTS (A1) 15TH TO 18TH FLOORS.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: A1-Phase II.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RTPL Form 5 A1-PH-2-31-03-24.pdf | 14 Nov 2024 |
| Certificates of CA (Form 3)File: RTPL Form 3 A1-PH-2-30-09-24.pdf | 22 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A1-Ph-II.pdf | 19 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 02 A-1 Flr 15 to 18.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Documents of sold-NSH 2.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: North Sea Heights_Ph II.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: RTPL Form 3 A1-PH-2-30-06-24.pdf | 20 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: North Sea Heights_Ph II.pdf | 20 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A1-PH-II.pdf | 18 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A-1 Flr 15 to 19.pdf | 18 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: FCC-03012024-A1-Highlighted.pdf | 28 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NSH-2.pdf | 28 Jun 2024 |
| Certificates of CA (Form 5)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2021-22).pdf | 6 Jun 2024 |
| Certificates of CA (Form 5)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2022-23) (2).pdf | 6 Jun 2024 |
| Building plan approvalFile: RTPL- Amended building plan approval 29122023.pdf | 2 May 2024 |
| Building plan approvalFile: A1- PH-II- LAYOUT_compressed.pdf | 2 May 2024 |
| Building plan approvalFile: A1- PH-II- BUA_compressed.pdf | 2 May 2024 |
| Layout approvalFile: A1- PH-II- LAYOUT_compressed.pdf | 2 May 2024 |
| Details of encumbrancesFile: Encumbrance Certificate-NSH-2.pdf | 2 May 2024 |
| Copy of Layout Approval (in case of layout)File: A1- PH-II- LAYOUT_compressed.pdf | 2 May 2024 |
| Building Plan Approval (IOD)File: RTPL- Amended building plan approval 29122023.pdf | 2 May 2024 |
| Building Plan Approval (IOD)File: A1- PH-II- LAYOUT_compressed.pdf | 2 May 2024 |
| Building Plan Approval (IOD)File: A1- PH-II- BUA_compressed.pdf | 2 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: A-1 15 to 18 th.pdf | 2 May 2024 |
| Proforma of Agreement for saleFile: A1-AFS.pdf | 2 May 2024 |
| Declaration about Commencement CertificateFile: A1-PH-II.pdf | 23 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A1-II.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: A-1- NSH- 15 to 18.pdf | 23 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: A1-Phase_2.pdf | 23 Apr 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200303820120_North Sea Heights.pdf | 23 Apr 2024 |
| Certificates of CA (Form 3)File: RTPL Form 3 A1-PH-2-31-12-23_compressed (2).pdf | 23 Apr 2024 |
| Certificates of CA (Form 3)File: RTPL Form 3 A1-PH-2-31-03-24.pdf | 23 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate bank account letters-NSH- 2.pdf | 23 Apr 2024 |
| Declaration about Commencement CertificateFile: Declaration of CC-A1.pdf | 9 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate-NSH-2_Dec 23.pdf | 9 Mar 2024 |
| CERSAI detailsFile: NSH_CERSAI_Search_Report_200298721375_For_Asset_Based_Search_29_02_2024_18_22_35_924.pdf | 9 Mar 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: A-1 15 th to 18 th.pdf | 5 Mar 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: A1-II.pdf | 1 Mar 2024 |
| Building plan approvalFile: 01-08_Building plans.pdf | 22 Feb 2024 |
| Building plan approvalFile: 09-15_Building plans.pdf | 22 Feb 2024 |
| Building plan approvalFile: 16-22_Building plans.pdf | 22 Feb 2024 |
| Building plan approvalFile: 23-29_Building plans.pdf | 22 Feb 2024 |
| Building Plan Approval (IOD)File: 01-08_Building plans.pdf | 22 Feb 2024 |
| Building Plan Approval (IOD)File: 09-15_Building plans.pdf | 22 Feb 2024 |
| Building Plan Approval (IOD)File: 16-22_Building plans.pdf | 22 Feb 2024 |
| Building Plan Approval (IOD)File: 23-29_Building plans.pdf | 22 Feb 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: RTPL Sale CC - Revalidated till 10022025.pdf | 22 Feb 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 7 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 15 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 163 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep North Sea Heights (A1) - 15th to 18th floor on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ghatkopar East6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 340 registered projects within 2 km.
Mahindra Rainforest Phase 1
Anthurium Developers Limited
Mahindra Rainforest Phase 2
Anthurium Developers Limited
CRYSTAL PRIME MERIDIAN
ARYAMAAN DEVELOPERS PRIVATE LIMITED
AARADHYA ONEPARK
MICL CREATORS LLP
CENTRONA ZEN-A
ELEVATED AVENUE REALTY LLP
CENTRONA ZEN-B
ELEVATED AVENUE REALTY LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Rare Townships Private Limited
Rare Townships Private Limited has 16 registrations on MahaRERA, including North Sea Heights (A1) - 19th floor and North Sea Heights (A1) - upto 14th floor. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that North Sea Heights (A1) - 15th to 18th floor shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if North Sea Heights (A1) - 15th to 18th floor is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of North Sea Heights (A1) - 15th to 18th floor?
The registered promoter entity is Rare Townships Private Limited, a company as per the filing. Its CIN U70102MH2000PTC126999 and GSTIN 27AAACI7331M1ZD can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in North Sea Heights (A1) - 15th to 18th floor?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against North Sea Heights (A1) - 15th to 18th floor?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for North Sea Heights (A1) - 15th to 18th floor?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at North Sea Heights (A1) - 15th to 18th floor?
The professionals named in the filing: Architect: AAKAR ARCHITECTS (Umesh Pawar); Architect: Citygold Management Service Private Limited; Engineer: Structural Engg:- JW+ Cosulants LLP (Mr.Achyut Watve); Engineer: JW Consultants LLP; Engineer: PANDURANG BHOITE; Chartered Accountant: Niraj D. Adatia & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in North Sea Heights (A1) - 15th to 18th floor?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback