ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / Nitesh Knightsbridge

Registration transferred Residential/Group Housing project

Nitesh Knightsbridge

By Nitesh Estates Limited

RG-KA-53086 · RERA PRM/KA/RERA/1251/309/PR/171222/000942

Source: official RERA Karnataka filing

Red flags

  • Registration transferred
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No complaints on record
  • Separate project account declared
Dec 2020Possession promisedmoved 9 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 51 documents Report an error

Nitesh Knightsbridge is a Residential/Group Housing project by Nitesh Estates Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/171222/000942 on 22 Dec 2017. Possession is promised by 31 Dec 2020. The completion date has moved by 9 months from the original filing.

At a glance

Project

  • NameNitesh Knightsbridge
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/171222/000942
  • ReraGenie IDRG-KA-53086

Builder

  • NameNitesh Estates Limited
  • Entity typeCompany
  • CINU07010KA2004PLC033412
  • Authorized SignatoryPradeep Narayan
  • Other registrations5 more →
  • Declared earlier projects9 →

Key dates

this monthRegisteredDec 2017First promiseMar 2020Revised toDec 2020

Key facts

Registration and timeline

  • StatusRegistration transferred
  • Registered on22 Dec 2017
  • Promised completion31 Dec 2020
  • Revised completionRevised to 31 Dec 2020 (originally 31 Mar 2020)
  • Buildings1 building record
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A Block---11011

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities42

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Water Tanks, Sumps And Other Electrical EquipmentYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,285 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 19.50 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectOpen to Sky studio LLP
EngineerAnagha Engineering Consutants

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionMar 2020 → Dec 2020

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed51

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/171222/000942 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Registration certificate-NEL.pdf-
NKB Sanction letter-
Building plan-
Site plan-
SALE DEED - KNIGHTSBRIDGE- 341 PM-
NKB-
JDA & Location map-
Section plan-
RERA - NKB - Services-
Allotment Letter_Apartment_NEL-
Knightsbridge_Prospectus_v2_29 Jul 17-
Final NoCs-
Specs_R1-RERA-NKB-
Encumbrance-
Amalgamation Khata Certificate & Extract-
JDA - Shantesh Gureddi & NELcompressed-split-merge-
Legal opinion- Lokesh-
NA - Conv, MR, RTC-
NA - Conv, MR, RTC-
Sale Deed between Prashanth in favor of Shantesh S Gureddi and Jyothi S Gureddi compressed-
NOC - Fire-
NOC - AAI-
NOC - BESCOM-
NOC - BWSSB-
KSPCB-
SEIAA-
NOC BSNL - NOC-
Unnamed document-
Str Safety-
Section plan-
Balance Sheet 2015 - 2016File: NEL - Mar 2016 Balance Sheet.pdf-
Balance Sheet 2014 - 2015File: NEL - Mar 2015 Balance Sheet.pdf-
Balance Sheet 2013 - 2014File: NEL - Mar 2014 Balance Sheet.pdf-
Audited Profit and Loss Statement 2015 - 2016File: NEL - Mar 2016 Profit and loss account.pdf-
Audited Profit and Loss Statement 2014 - 2015File: NEL - Mar 2015 Profit and loss account.pdf-
Audited Profit and Loss Statement 2013 - 2014File: NEL - Mar 2014 Profit and Loss Account.pdf-
Director's Report 2015 - 2016File: 2016 DR.pdf-
Director's Report 2014 - 2015File: 2015 DR.pdf-
Director's Report 2013 - 2014File: 2014 DR.pdf-
Cash Flow Statement 2015 - 2016File: NEL - Mar 2016 Cash Flow.pdf-
Cash Flow Statement 2014 - 2015File: NEL - Mar 2015 Cash Flow.pdf-
Auditor's Report 2015 - 2016File: NEL - Mar 2016 Audit Report.pdf-
Auditor's Report 2014 - 2015File: NEL - Mar 2015 Audit Report.pdf-
Auditor's Report 2013 - 2014File: NEL - Mar 2014 Audit Report.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: NEL AY 2016-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: NEL AY 2015-16.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: NEL AY 2014-15.pdf-
Final Form B v3-
Prospectus/BrochureFile: Knightsbridge_Prospectus_v2.pdf-
Advertisement Copy 1File: Knightsbridge.jpg-
Tower Excel SheetFile: PRM_KA_RERA_1251_309_PR_171222_000942.xlsx-

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
Nitesh Park Avenue-OngoingMar 2021Not delivered
Nitesh RIO-OngoingMar 2019Not delivered
Nitesh Long Island-OngoingDec 2018Not delivered
Nitesh Caesars Palace-OngoingDec 2018Not delivered

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Nitesh Knightsbridge on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmNitesh KnightsbridgeOther 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 12 registered projects within 2 km.

Builder: Nitesh Estates Limited

NITESH ESTATES LIMITED has 6 registrations on RERA Karnataka, including Nitesh Long Island and Nitesh Madison Square. Its filings declare 9 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Nitesh Knightsbridge is delayed beyond 31 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Nitesh Knightsbridge?

The registered promoter entity is Nitesh Estates Limited, a company as per the filing. Its CIN U07010KA2004PLC033412 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Nitesh Knightsbridge?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Nitesh Knightsbridge?

The professionals named in the filing: Architect: Open to Sky studio LLP; Engineer: Anagha Engineering Consutants. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nitesh Knightsbridge?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nitesh Knightsbridge. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nitesh Knightsbridge to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.