Home / Browse projects / Bengaluru Urban, Karnataka / Nitesh Columbus Square Phase II
Nitesh Columbus Square Phase II
By NITESH HOUSING DEVELOPERS PRIVATE LIMITED
RG-KA-20863 · RERA PRM/KA/RERA/1251/310/PR/180509/001673 · Last updated on RERA Karnataka portal: 8 Apr 2021
Source: official RERA Karnataka filing
Red flags
- 14 complaints at RERA Karnataka
Clear
- Completion date never moved
- Separate project account declared
Saved.
Nitesh Columbus Square Phase II is a Residential/Group Housing project by NITESH HOUSING DEVELOPERS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/180509/001673 on 9 May 2018. Possession is promised by 31 Dec 2018. 14 complaints are on record with the regulator.
At a glance
Project
- NameNitesh Columbus Square Phase II
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/180509/001673
- ReraGenie IDRG-KA-20863
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on9 May 2018
- Promised completion31 Dec 2018
- Revised completionNone
- Buildings3 building records
- Documents filed99 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block A | - | - | - | 78 | 0 | 78 |
| Block B | - | - | - | 88 | 0 | 88 |
| Block C | - | - | - | 66 | 0 | 66 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 8 Apr 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | Not applicable |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 8 Apr 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | Yes | - |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Dutta Kannan Architects |
| Engineer | V K BUILDING SERVICES |
Complaints filed with RERA Karnataka14
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CMP/190302/0002335 | - | NITESH HOUSING DEVELOPERS PRIVATE LIMITED | 02/03/2019 |
| CMP/190325/0002497 | - | NITESH HOUSING DEVELOPERS PRIVATE LIMITED | 25/03/2019 |
| CMP/190327/0002527 | - | NITESH HOUSING DEVELOPERS PRIVATE LIMITED | 27/03/2019 |
| CMP/190417/0002295 | - | NITESH HOUSING DEVELOPERS PRIVATE LIMITED | 17/04/2019 |
| CMP/190624/0002421 | - | NITESH HOUSING DEVELOPERS PRIVATE LIMITED | 24/06/2019 |
| CMP/190903/0004116 | - | NITESH HOUSING DEVELOPERS PRIVATE LIMITED | 03/09/2019 |
| CMP/191002/0004380 | - | NITESH HOUSING DEVELOPERS PRIVATE LIMITED | 02/10/2019 |
| CMP/191029/0004367 | - | NITESH HOUSING DEVELOPERS PRIVATE LIMITED | 29/10/2019 |
| CMP/200710/0006112 | - | NITESH HOUSING DEVELOPERS PRIVATE LIMITED | 10/07/2020 |
| CMP/200724/0006250 | - | NITESH HOUSING DEVELOPERS PRIVATE LIMITED | 24/07/2020 |
| CMP/200727/0006265 | - | NITESH HOUSING DEVELOPERS PRIVATE LIMITED | 27/07/2020 |
| CMP/200831/0002515 | - | NITESH HOUSING DEVELOPERS PRIVATE LIMITED | 31/08/2020 |
| CMP/210806/0008216 | - | NITESH HOUSING DEVELOPERS PRIVATE LIMITED | 06/08/2021 |
| 00182/2023 | - | NITESH HOUSING DEVELOPERS PRIVATE LIMITED | 09/02/2023 |
Documents filed99
As listed on the registration, under the names the promoter filed them with; the newest 80 of 99 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/180509/001673 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Bank change - We have already clarified that there is no change in the bank last time also.Pls chkFile: Note on NCS bank accounts.pdf | 8 Apr 2021 |
| Letter add to Hon'ble Secy clarifying that there is no change in the bank a/c. We have uploaded alsFile: LETTER.pdf | 8 Apr 2021 |
| We have already uploaded in 2019 the delay for extn of project once again uploading the sameFile: NCS Delay Letter TO RERA.pdf | 8 Apr 2021 |
| We hv already uploaded the reason for delay already uploaded once again uploadingFile: Delay transport strike & Sand lorry strike.pdf | 8 Apr 2021 |
| RERA Complaints- We have already updated the status. Out of 13 complainted, we have settled 2 complFile: MRSatyanarayanCertifiedCopyofOrder.pdf | 8 Apr 2021 |
| We have settled 2 cases balance we are trying to settle shortlyFile: NeethaHeerziCMP6250.pdf | 8 Apr 2021 |
| Pls find attached the screenshot for delay in project which was uploaded in 2019. So, it is very clFile: DELAYUPLOADEDONRERA.pdf | 8 Apr 2021 |
| RESPONSE TO YOUR E-MAIL DTD 16.3.2021File: LETTER.pdf | 17 Mar 2021 |
| COMMENCEMENT CERTIFICATEFile: BD-NCS-Commencement Certificate -12.06.2012.pdf | 17 Mar 2021 |
| BANK IS NOT CHANGED - BANK STATEMENTS ATTACHEDFile: NHDPL COLUMBUS SQUARE PROMOTER ESC 30% ACCOUNT.pdf | 17 Mar 2021 |
| BANK IS NOT CHANGED - BANK STATEMENTS ATTACHEDFile: NHDPL COLUMBUS SQUARE PROMOTER ESC- Aug to Oct'19 30% ACCOUNT.pdf | 17 Mar 2021 |
| BANK IS NOT CHANGED - BANK STATEMENTS ATTACHEDFile: NHDPL COLUMBUS SQUARE RERA 70% ACCOUNT.pdf | 17 Mar 2021 |
| BANK IS NOT CHANGED - BANK STATEMENTS ATTACHEDFile: NHDPL COLUMBUS SQUARE RERA ACAug to Oct'19 70% ACCOUNT.pdf | 17 Mar 2021 |
| BANK IS NOT CHANGED - BANK STATEMENTS ATTACHEDFile: NHDPL2 30% ACCOUNT.pdf | 17 Mar 2021 |
| BANK IS NOT CHANGED - BANK STATEMENTS ATTACHEDFile: NHDPL7 -01.04.2017 to 30.06.2017 30% ACCOUNT.pdf | 17 Mar 2021 |
| BANK IS NOT CHANGED - BANK STATEMENTS ATTACHEDFile: NITESH COLUMBUS SQUARE RECEIVABLAug to Oct'19 100% ACCOUNT.pdf | 17 Mar 2021 |
| BANK IS NOT CHANGED - BANK STATEMENTS ATTACHEDFile: NITESH COLUMBUS SQUARE RECEIVABLE 100% ACCOUNT.pdf | 17 Mar 2021 |
| BANK IS NOT CHANGED - BANK STATEMENTS ATTACHEDFile: NITESH2 100% ACCOUNT.pdf | 17 Mar 2021 |
| CA CERTIFICATEFile: CA CERTIFICATE OLD.pdf | 17 Mar 2021 |
| PROJECT DELAY WE HAVE ALREADY UPLOADED IN THE PREVIOUS PAGE IN 2019 ITSELF. ONCE AGAIN ATTACHINGFile: Delay transport strike & Sand lorry strike.pdf | 17 Mar 2021 |
| DELAY LETTER UPOLOADED IN 2019 ITSELFFile: NCS Delay Letter TO RERA.pdf | 17 Mar 2021 |
| REGARDING CHANGE OF ENTITY WE HAVE ALREADY INTIMATED AND SEVERAL REMINDERS HAVE BEEN SENT. ATTACHEDFile: Reg.NHDPL entity change.pdf | 17 Mar 2021 |
| Bank StatmentsFile: 002266200001345Aug'2020 to Nov'2020.pdf | 8 Mar 2021 |
| Bank StatmentsFile: 002266200001345-Oct'2017 to Aug'20.pdf | 8 Mar 2021 |
| Bank StatmentsFile: 002280200000742 Nov'2015 to Aug'2020.pdf | 8 Mar 2021 |
| Bank StatmentsFile: 002280200000742.pdf | 8 Mar 2021 |
| Bank StatmentsFile: 002281400002806- Aug'2020 to 6th Nov'2020.pdf | 8 Mar 2021 |
| Bank StatmentsFile: 002281400002806 Nov'2015 to Aug'2020.pdf | 8 Mar 2021 |
| Bank StatmentsFile: NHDPL COLUMBUS SQUARE PROMOTER ESC.pdf | 8 Mar 2021 |
| Bank StatmentsFile: NHDPL COLUMBUS SQUARE RERA.pdf | 8 Mar 2021 |
| Bank StatmentsFile: NITESH COLUMBUS SQUARE RECEIVABLE.pdf | 8 Mar 2021 |
| Regarding Consent LettersFile: Projextnfinal.pdf | 8 Mar 2021 |
| Affidavit1File: 5. 2021.03.05 - Affidavit NHDPL.pdf | 8 Mar 2021 |
| Affidavit2File: 6. 2021.03.05 - Affidavit Cum Declaration NHDPL.pdf | 8 Mar 2021 |
| Bldg.Extn-Already paid the fee and obatined partial OC from BBMP and Receipt attachedFile: NCSFees.pdf | 8 Mar 2021 |
| Partial OC will be obtained after all the clearance which is attachedFile: PartialOC.pdf | 8 Mar 2021 |
| CertificateFile: 1Registration cirtificate - NHDPL.pdf | - |
| Architect Certificate for Work Completion Schedule till DateFile: NCS_Architect_Work Done.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: NCS_Engg_Work Done.pdf | - |
| CA Certificate for Funds UtilizationFile: NCS_CA_Fund Utilization.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: NCS_Architect_Work Pending.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: NCS_Engg_Work Pending.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: NCS_CA_Fund Reqd.pdf | - |
| AffidavitFile: form B Final.pdf | - |
| Latest Encumbrance CertificateFile: EC - from - 04082016 to 16032017.pdf | - |
| Consent letter from 2/3rd of AllotteesFile: Communication to customer.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: Sold Unsold Details.xlsx | - |
| Document 1File: Delay transport strike & Sand lorry strike.pdf | - |
| Document 2File: Delay_Arbitration_ACIL.pdf | - |
| Document 3File: Delay Letter.pdf | - |
| sanction letter | - |
| building plan | - |
| Site Plan | - |
| Columbus Square - Sale Deed | - |
| Columbus Square - Sale Agreements | - |
| sale deed & RTC | - |
| sectional view | - |
| RERA - NCS - Services | - |
| Allotment Letter_Apartment_NHDPL | - |
| NCS v1 | - |
| ALL NOCs | - |
| NCS-REV SPECS 27 TH MAY 2015 | - |
| EC 2004-2017 | - |
| Katha Certificate & Extract - 2010 | - |
| JDA - Regd - Doc No - 2256 - 2009-10compressed-split-merge | - |
| Title Report | - |
| Conversion Order | - |
| mutation merged | - |
| Sale Deed - Doc No - 6714-2005-06, Shashikala and Suresh | - |
| NoC - Fire | - |
| NoC - AAI | - |
| NoC - BESCOM | - |
| NoC - BWSSB | - |
| NoC - KSPCB | - |
| NoC - SEIAA | - |
| NoC - BSNL | - |
| Unnamed document | - |
| Str Safety | - |
| sectional view | - |
| Balance Sheet 2015 - 2016File: NHDPL - Mar16 Balance sheet.pdf | - |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Nitesh Melbourne Park | - | Ongoing | Mar 2022 | Not delivered |
| Nitesh Napa Valley | - | Ongoing | Mar 2021 | Not delivered |
| Nitesh Hyde Park | - | Ongoing | Dec 2018 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Nitesh Columbus Square Phase II on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 11 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: NITESH HOUSING DEVELOPERS PRIVATE LIMITED
Nitesh Housing Developers Private Limited has 4 registrations on RERA Karnataka, including Nitesh Napa Valley and Nitesh Columbus Square Phase II. Its filings declare 4 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Nitesh Columbus Square Phase II is delayed beyond 31 Dec 2018?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Nitesh Columbus Square Phase II?
The registered promoter entity is NITESH HOUSING DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U45201KA2007PTC044553 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Nitesh Columbus Square Phase II?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Nitesh Columbus Square Phase II?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Nitesh Columbus Square Phase II?
The professionals named in the filing: Architect: Dutta Kannan Architects; Engineer: V K BUILDING SERVICES. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Nitesh Columbus Square Phase II?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback