Home / Browse projects / Bengaluru Urban, Karnataka / Nitesh Caesars Palace Phase 2

Registration transferred Residential/Group Housing project

Nitesh Caesars Palace Phase 2

By NITESH ESTATES LIMITED

RG-KA-05757 · RERA PRM/KA/RERA/1251/310/PR/180509/001675

Source: official RERA Karnataka filing

Red flags

  • Registration transferred
  • 2 complaints at RERA Karnataka

Clear

  • Completion date never moved
  • Separate project account declared
Mar 2018Possession promisedno revision filed
2Complaints at RERA Karnatakaon this registration
Jump to the 70 documents Report an error

Nitesh Caesars Palace Phase 2 is a Residential/Group Housing project by NITESH ESTATES LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/180509/001675 on 9 May 2018. Possession is promised by 31 Mar 2018. 2 complaints are on record with the regulator.

At a glance

Project

  • NameNitesh Caesars Palace Phase 2
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/180509/001675
  • ReraGenie IDRG-KA-05757

Builder

  • NameNITESH ESTATES LIMITED
  • Entity typeCompany
  • CINU07010KA2004PLC033412
  • Authorized SignatoryMr. Pradeep Narayan
  • Other registrations5 more →
  • Declared earlier projects9 →

Key dates

Registered
9 May 2018
Promised
31 Mar 2018

Key facts

Registration and timeline

  • StatusRegistration transferred
  • Registered on9 May 2018
  • Promised completion31 Mar 2018
  • Revised completionNone
  • Buildings4 building records
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
E Block-----48
F Block---64064
G Block---64064
H Block---66066

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area19,930 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 111.34 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDesign Front Architects
EngineerM/s Design Ventures Engineering

Complaints filed with RERA Karnataka2

Case no.ComplainantRespondentFiled
CMP/190903/0004114-NITESH ESTATES LIMITED03/09/2019
CMP/210129/0007444-NITESH ESTATES LIMITED29/01/2021

Documents filed70

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/180509/001675 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Registration certificate-NEL.pdf-
Certificate form Architect,Engineer,CA etc.File: NCP.pdf-
Architect Certificate for Work Completion Schedule till DateFile: NCAP_Architect_Work Done.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: NCAP_Engg_Work Done.pdf-
CA Certificate for Funds UtilizationFile: NCAP_CA_Funds utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: NCAP_Architect_Work Pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: NCAP_Engg_Work Pending.pdf-
CA Certificate for Funds required for Project CompletionFile: NCAP_CA_Funds Required.pdf-
AffidavitFile: form B Final.pdf-
Latest Encumbrance CertificateFile: EC - from - 11-Jul-2016 to 16-Mar-2017.pdf-
Consent letter from 2/3rd of AllotteesFile: 15th Feb 2019-NCAP-Project status - February 2019_compressed.pdf-
Details Of Sold/ Un-sold UnitsFile: Sold Unsold Details.xlsx-
Document 1File: TDR 2.jpg-
Document 2File: TDR.jpg-
Document 3File: Delay transport strike & Sand lorry strike.pdf-
Document 4File: Delay NCDRC Legal Notice.pdf-
Document 5File: Delay NCDRC Complaint copy -CC 351-2017.pdf-
Document 6File: Delay NCDRC Latest order Daily Order in CC 351 of 2017_compressed.pdf-
commencement certificate-
building plan-
Site plan-
Caesar's Palace- Sale Deed-
Caesar's Palace- Sale agreement-
Ncaep-Site Plan-
Ncaep-Site Plan_high res_old-
will deed & RTC-
section of building-
RERA - NCaP - Services-
Allotment Letter_Apartment_NEL-
NCAP-
NOCs final-
NCaeP-SPECIFICATIONS - 25th July 2017-
Encumbrence certificate merged-
Katha Certificate & Extract - 2016-
JDA-Regd- Doc No - JPN-1-01946 - 2010-11-
Title opinion-pdf-
Convesion Order Sy No-17-2 No-SR-105-2009-10,compressed-
Mutation Register - No-2-2005-06-
Will Deed- Doc No-2-1990-91-
fire-
hal-
bescom-
bwssb-compressed-
kspcb-
moef-
bsnl-
Unnamed document-
BMRCL - Noc-
Str Safety-
section of building-
Balance Sheet 2015 - 2016File: NEL - Mar 2016 Balance Sheet.pdf-
Balance Sheet 2014 - 2015File: NEL - Mar 2015 Balance Sheet.pdf-
Balance Sheet 2013 - 2014File: NEL - Mar 2014 Balance Sheet.pdf-
Audited Profit and Loss Statement 2015 - 2016File: NEL - Mar 2016 Profit and loss account.pdf-
Audited Profit and Loss Statement 2014 - 2015File: NEL - Mar 2015 Profit and loss account.pdf-
Audited Profit and Loss Statement 2013 - 2014File: NEL - Mar 2014 Profit and Loss Account.pdf-
Director's Report 2015 - 2016File: 2016 DP.pdf-
Director's Report 2014 - 2015File: 2015 DP.pdf-
Director's Report 2013 - 2014File: 2014 DP.pdf-
Cash Flow Statement 2015 - 2016File: NEL - Mar 2016 Cash Flow.pdf-
Cash Flow Statement 2014 - 2015File: NEL - Mar 2015 Cash Flow.pdf-
Auditor's Report 2015 - 2016File: NEL - Mar 2016 Audit Report.pdf-
Auditor's Report 2014 - 2015File: NEL - Mar 2015 Audit Report.pdf-
Auditor's Report 2013 - 2014File: NEL - Mar 2014 Audit Report.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: NEL AY 2016-17.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: NEL AY 2015-16.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: NEL AY 2014-15.pdf-
form B Final-
Prospectus/BrochureFile: NCAP brochure.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_180509_001675.xlsx-

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 not delivered by the promised date
ProjectLocationStatusPromisedDelivered
Nitesh Park Avenue-OngoingMar 2021Not delivered
Nitesh KnightsBridge-OngoingMar 2020Not delivered
Nitesh RIO-OngoingMar 2019Not delivered
Nitesh Long Island-OngoingDec 2018Not delivered
Nitesh Caesar's Palace-OngoingDec 2018Not delivered

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Nitesh Caesars Palace Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmNitesh Caesars Palace PhOther 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 36 registered projects within 2 km.

Builder: NITESH ESTATES LIMITED

NITESH ESTATES LIMITED has 6 registrations on RERA Karnataka, including Nitesh Long Island and Nitesh Madison Square. Its filings declare 9 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Nitesh Caesars Palace Phase 2 is delayed beyond 31 Mar 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Nitesh Caesars Palace Phase 2?

The registered promoter entity is NITESH ESTATES LIMITED, a company as per the filing. Its CIN U07010KA2004PLC033412 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Nitesh Caesars Palace Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Nitesh Caesars Palace Phase 2?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Nitesh Caesars Palace Phase 2?

The professionals named in the filing: Architect: Design Front Architects; Engineer: M/s Design Ventures Engineering. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nitesh Caesars Palace Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nitesh Caesars Palace Phase 2. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nitesh Caesars Palace Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.