NISARGA RESIDENCY
By G R INFRA
RG-KA-86656 · RERA PRM/KA/RERA/1251/310/PR/280324/006754 · Last updated on RERA Karnataka portal: 27 Mar 2024
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
NISARGA RESIDENCY is a Residential/Group Housing project by G R INFRA in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/280324/006754 on 28 Mar 2024. Possession is promised by 31 Jul 2025.
At a glance
Project
- NameNISARGA RESIDENCY
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/310/PR/280324/006754
- ReraGenie IDRG-KA-86656
Builder
- NameG R INFRA
- Entity typePartnership Firm
- GSTIN29AAZFG4473C1ZW
- Authorized SignatoryG R SAI NIKHIL
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on28 Mar 2024
- Promised completion31 Jul 2025
- Revised completionNone
- Buildings1 building record
- Documents filed98 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NISARGA RESIDENCY | - | - | - | 44 | 0 | 44 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 27 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities42
As on 27 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Children's Play Area | No | Not applicable |
| Jogging Track | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | No | Not applicable |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | Yes | - |
| Water conservation and renewable energy | Yes | - |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| G R INFRA | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 16.21 cr | - |
| Principal sum and interest payable to financial institutions-Scheduled Banks | Rs 1.20 cr | - |
| On-site expenditure-Site Overhead | Rs 41.92 lakh | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 40.25 lakh | - |
| On-site expenditure-Salaries of workers | Rs 25.00 lakh | - |
| On-site expenditure-Consultants Fees | Rs 25.00 lakh | - |
| Payment of taxes | Rs 25.00 lakh | - |
| Payment of cess | Rs 25.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | BHANUMATHY G |
| Engineer | ARUN KUMAR S R |
| Chartered Accountant | RADHAKRISHNA TANTRY |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed98
As listed on the registration, under the names the promoter filed them with; the newest 80 of 98 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/280324/006754 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Sketch of proposed site - Kaludari not passing at our project.File: Proposed Site Sketch with explanation.pdf | 27 Mar 2024 |
| ZR CopyFile: ZR Copy.pdf | 27 Mar 2024 |
| Affidavit Cum Declaration -Form BFile: FORM B Affidavit.pdf | 21 Mar 2024 |
| AffidavitFile: AFFIDAVIT.pdf | 21 Mar 2024 |
| Affidavit for NON LitigationFile: DECLARATION FOR NON LITIGATION.pdf | 21 Mar 2024 |
| EC 1.4.2023 to Till DateFile: Latest EC.pdf | 21 Mar 2024 |
| Conversion CopyFile: Conversion copy.pdf | 21 Mar 2024 |
| Certified Carpet AreaFile: Certified Carpet Area.pdf | 21 Mar 2024 |
| ZR Copy for tank bufferFile: ZR Copy.pdf | 21 Mar 2024 |
| Village MAP with Proposed SiteFile: Village map WITH site marking.pdf | 21 Mar 2024 |
| KSPCB CFEFile: KSPCB NOC.pdf | 21 Mar 2024 |
| Relinquishment DeedFile: Mother deed.pdf | 21 Mar 2024 |
| BBMP PLANFile: BBMP Plan copy.pdf | 21 Mar 2024 |
| Eng License self attestedFile: Engineer Certificate.pdf | 21 Mar 2024 |
| Project Image - 1File: 01.jpg | 21 Mar 2024 |
| Project Image - 2File: 02.jpg | 21 Mar 2024 |
| Project Image - 3File: 03.jpg | 21 Mar 2024 |
| Project Image - 4File: 4.jpg | 21 Mar 2024 |
| Eng CertificateFile: ENG FORM 3.pdf | 21 Mar 2024 |
| Eng Ongoing Update CertificateFile: Eng Ongoing Certificate.pdf | 21 Mar 2024 |
| STP DrawingFile: STP Drawing.pdf | 21 Mar 2024 |
| BWSSB self attestedFile: BWSSB -SELF ATTESTED COPY.pdf | 21 Mar 2024 |
| Land Calculation with Sale DeedFile: Land Calc with Sale Deed.pdf | 21 Mar 2024 |
| Borewell Fee receiptFile: Borewell.jpg | 21 Mar 2024 |
| Proforma Sale of AgreementFile: Proforma Sale of Agreement.pdf | 21 Mar 2024 |
| Estimation CopyFile: Estimation Copy.pdf | 21 Mar 2024 |
| RTC, survey 264/2 | - |
| Mutation, survey 264/2 | - |
| Encumbrance Certificate, survey 264/2 | - |
| Sale/Title/Gift Deed, survey 264/2 | - |
| Khatha, survey 264/2 | - |
| Registration CertificateFile: Firm Registration GR INFRA.pdf | - |
| Partnership DeedFile: Partnership Deed.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by CA Form 1File: CA Reg 1.pdf | - |
| Certificate issued by Architect Form 2File: ARC FORM 2.pdf | - |
| Certificate issued by Engineer Form 3File: ENG FORM 3.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: DECLARATION FOR NON LITIGATION.pdf | - |
| Certificate from Chartered AccountFile: Approval Cost Certificate.pdf | - |
| Commencement Certificate | - |
| BESCOM NOC with paid receipt | - |
| BWSSB NOC with Paid receipt | - |
| BBMP Plan copy | - |
| Section Drawing and Specification | - |
| Sectional Drawing | - |
| Project Specification on Letter head | - |
| BBMP Plan copy | - |
| Stability Certificate | - |
| Advocate Search Report | - |
| Sale Deed of the Property | - |
| Allotment letter on letter head | - |
| Brochure NA | - |
| FORM B | - |
| Section 3 Violation | - |
| NA - IT IS NOT JD | - |
| BESCOM NOC with paid receipt | - |
| BWSSB NOC with Paid receipt | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| KSPCB NOC | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep NISARGA RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: G R INFRA
G R INFRA has 2 registrations on RERA Karnataka, including GR GREEN LINE and NISARGA RESIDENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if NISARGA RESIDENCY is delayed beyond 31 Jul 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of NISARGA RESIDENCY?
The registered promoter entity is G R INFRA, a partnership firm as per the filing. Its GSTIN 29AAZFG4473C1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in NISARGA RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at NISARGA RESIDENCY?
The professionals named in the filing: Architect: BHANUMATHY G; Engineer: ARUN KUMAR S R; Chartered Accountant: RADHAKRISHNA TANTRY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NISARGA RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.