Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jul 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 98 documents Report an error

NISARGA RESIDENCY is a Residential/Group Housing project by G R INFRA in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/280324/006754 on 28 Mar 2024. Possession is promised by 31 Jul 2025.

At a glance

Project

  • NameNISARGA RESIDENCY
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/280324/006754
  • ReraGenie IDRG-KA-86656

Builder

  • NameG R INFRA
  • Entity typePartnership Firm
  • GSTIN29AAZFG4473C1ZW
  • Authorized SignatoryG R SAI NIKHIL
  • Other registrations1 more →

Key dates

this monthRegisteredMar 2024PromisedJul 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on28 Mar 2024
  • Promised completion31 Jul 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NISARGA RESIDENCY---44044

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 27 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities42

As on 27 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
Children's Play AreaNoNot applicable
Jogging TrackNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
G R INFRA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 19.23 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 16.21 cr-
Principal sum and interest payable to financial institutions-Scheduled BanksRs 1.20 cr-
On-site expenditure-Site OverheadRs 41.92 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 40.25 lakh-
On-site expenditure-Salaries of workersRs 25.00 lakh-
On-site expenditure-Consultants FeesRs 25.00 lakh-
Payment of taxesRs 25.00 lakh-
Payment of cessRs 25.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectBHANUMATHY G
EngineerARUN KUMAR S R
Chartered AccountantRADHAKRISHNA TANTRY

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed98

As listed on the registration, under the names the promoter filed them with; the newest 80 of 98 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/280324/006754 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Sketch of proposed site - Kaludari not passing at our project.File: Proposed Site Sketch with explanation.pdf27 Mar 2024
ZR CopyFile: ZR Copy.pdf27 Mar 2024
Affidavit Cum Declaration -Form BFile: FORM B Affidavit.pdf21 Mar 2024
AffidavitFile: AFFIDAVIT.pdf21 Mar 2024
Affidavit for NON LitigationFile: DECLARATION FOR NON LITIGATION.pdf21 Mar 2024
EC 1.4.2023 to Till DateFile: Latest EC.pdf21 Mar 2024
Conversion CopyFile: Conversion copy.pdf21 Mar 2024
Certified Carpet AreaFile: Certified Carpet Area.pdf21 Mar 2024
ZR Copy for tank bufferFile: ZR Copy.pdf21 Mar 2024
Village MAP with Proposed SiteFile: Village map WITH site marking.pdf21 Mar 2024
KSPCB CFEFile: KSPCB NOC.pdf21 Mar 2024
Relinquishment DeedFile: Mother deed.pdf21 Mar 2024
BBMP PLANFile: BBMP Plan copy.pdf21 Mar 2024
Eng License self attestedFile: Engineer Certificate.pdf21 Mar 2024
Project Image - 1File: 01.jpg21 Mar 2024
Project Image - 2File: 02.jpg21 Mar 2024
Project Image - 3File: 03.jpg21 Mar 2024
Project Image - 4File: 4.jpg21 Mar 2024
Eng CertificateFile: ENG FORM 3.pdf21 Mar 2024
Eng Ongoing Update CertificateFile: Eng Ongoing Certificate.pdf21 Mar 2024
STP DrawingFile: STP Drawing.pdf21 Mar 2024
BWSSB self attestedFile: BWSSB -SELF ATTESTED COPY.pdf21 Mar 2024
Land Calculation with Sale DeedFile: Land Calc with Sale Deed.pdf21 Mar 2024
Borewell Fee receiptFile: Borewell.jpg21 Mar 2024
Proforma Sale of AgreementFile: Proforma Sale of Agreement.pdf21 Mar 2024
Estimation CopyFile: Estimation Copy.pdf21 Mar 2024
RTC, survey 264/2-
Mutation, survey 264/2-
Encumbrance Certificate, survey 264/2-
Sale/Title/Gift Deed, survey 264/2-
Khatha, survey 264/2-
Registration CertificateFile: Firm Registration GR INFRA.pdf-
Partnership DeedFile: Partnership Deed.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: CA Reg 1.pdf-
Certificate issued by Architect Form 2File: ARC FORM 2.pdf-
Certificate issued by Engineer Form 3File: ENG FORM 3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: DECLARATION FOR NON LITIGATION.pdf-
Certificate from Chartered AccountFile: Approval Cost Certificate.pdf-
Commencement Certificate-
BESCOM NOC with paid receipt-
BWSSB NOC with Paid receipt-
BBMP Plan copy-
Section Drawing and Specification-
Sectional Drawing-
Project Specification on Letter head-
BBMP Plan copy-
Stability Certificate-
Advocate Search Report-
Sale Deed of the Property-
Allotment letter on letter head-
Brochure NA-
FORM B-
Section 3 Violation-
NA - IT IS NOT JD-
BESCOM NOC with paid receipt-
BWSSB NOC with Paid receipt-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
KSPCB NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep NISARGA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: G R INFRA

G R INFRA has 2 registrations on RERA Karnataka, including GR GREEN LINE and NISARGA RESIDENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if NISARGA RESIDENCY is delayed beyond 31 Jul 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of NISARGA RESIDENCY?

The registered promoter entity is G R INFRA, a partnership firm as per the filing. Its GSTIN 29AAZFG4473C1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in NISARGA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at NISARGA RESIDENCY?

The professionals named in the filing: Architect: BHANUMATHY G; Engineer: ARUN KUMAR S R; Chartered Accountant: RADHAKRISHNA TANTRY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NISARGA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NISARGA RESIDENCY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NISARGA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.