ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / NIDHAAN CORPORATE PARK

Registered No litigation declared Others project

NIDHAAN CORPORATE PARK

By NIDHAAN PROPERTIES LLP

RG-MH-19234 · RERA P51800078312 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 49.00 crore secured on the land, in favour of AU Small Finance Bank Ltd
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
9 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 75%
137 of 143Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

NIDHAAN CORPORATE PARK is a Others project by NIDHAAN PROPERTIES LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078312 on 4 Dec 2024. Possession is promised by 30 Dec 2027. 6 of the 143 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.

At a glance

Project

  • NameNIDHAAN CORPORATE PARK
  • TypeOthers
  • Location
    • GHOTKOPAR-KIROL
    • KURLA
    • Ghatkopar
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800078312
  • ReraGenie IDRG-MH-19234

Builder

  • NameNIDHAAN PROPERTIES LLP
  • Entity typePartnership
  • PartnersNEHAL MULCHAND SAVLA, RAHUL MOHANLAL SHAH

Key dates

this monthRegisteredDec 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2024
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed79 files

Current status

4%6 of 143 units booked
44.5%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
COMMERCIAL - WING ANA19170128128
RESIDENTIAL WING BNA10715015

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 75%.

COMMERCIAL - WING A45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RESIDENTIAL WING B52%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed157

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots157
Closed/Covered157
BuildingClosed/CoveredTotal
COMMERCIAL - WING A149149
RESIDENTIAL WING B88

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,218 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAU Small Finance Bank Ltd
Secured amountRs 49.00 crore
CERSAI search filedYes
Declared on21 Jul 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI8242.21
Proposed, not sanctioned8,232 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO -2& 3,50 VINOD KUNJ,MG ROAD,VILE PARLE -E,MUMBAI -400057
Estimated costRs 40.50 cr
Cost incurredRs 18.02 cr
Work done44.5%
BuildingWingEstimatedIncurred
COMMERCIAL - WING ANARs 40.50 crRs 18.02 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSSA CONSULTANT
EngineerUnisteps Consulting Pvt Ltd
EngineerSharad Teli
Chartered AccountantHARSH NAGDA
Chartered AccountantM
PartnerRole in project
NIDHAAN PROPERTIES LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: NP LLP Form 2A certificate March 2026.pdf25 Apr 2026
Commencement certificateFile: CC-1.pdf15 Apr 2026
Withdrawal Update Form 1File: NPLLP Form 1 Architect Certificate March 26.pdf15 Apr 2026
Withdrawal Update Form 2File: NPLLP Form 2 Engineer Certificate March 2026.pdf15 Apr 2026
Withdrawal Update Form 3File: NPLLP Form 3 C A Certificate March 2026_compressed.pdf15 Apr 2026
Form 5 (FY 2025-2026)File: NPLLP-Form 5 March 2026.pdf14 Apr 2026
Withdrawal Update Form 1File: Nidhaan Properties LLP Form 1 Dec 2025.pdf15 Jan 2026
Withdrawal Update Form 2File: Nidhaan Properties LLP Form 2 Dec 2025.pdf15 Jan 2026
Withdrawal Update Form 3File: Nidhaan Properties LLP Form 3 Dec 2025.pdf15 Jan 2026
Layout approvalFile: Ghatkopar Amend Drawing 12-6-25 hgih.pdf20 Dec 2025
Withdrawal Update Form 1File: Nidhaan Properties LLP Form 1 Sep 25.pdf9 Oct 2025
Withdrawal Update Form 2File: Nidhaan Properties LLP Form 2 Sep 25.pdf9 Oct 2025
Withdrawal Update Form 3File: Nidhaan Properties LLP Form 3 Sep 25.pdf9 Oct 2025
Form 2A (FY 2024-2025)File: Ghatkopar Form 2A for FY 24-25.pdf8 Sep 2025
Form 5 (FY 2024-2025)File: form 5 NCP.pdf8 Sep 2025
Withdrawal Update Form 1File: NP LLP Form- 1 June 2025.pdf21 Aug 2025
Withdrawal Update Form 2File: NP LLP Form - 2 June 2025.pdf21 Aug 2025
Withdrawal Update Form 3File: NP LLP Form -3 CA Certificate June 2025.pdf21 Aug 2025
Building plan approvalFile: amended approval 12062025.pdf5 Aug 2025
Building plan approvalFile: amended approval drawing 12062025.pdf5 Aug 2025
Commencement certificateFile: FurtherCC_signed.pdf5 Aug 2025
Building plan approvalFile: amended approval 12062025.pdf5 Aug 2025
Building plan approvalFile: amended approval drawing 12062025.pdf5 Aug 2025
Form 1File: NP LLP Form 1 Architect Certificate March 25.pdf5 Aug 2025
Form 2File: NP LLP Form 2 Engineer Certificate March 25.pdf5 Aug 2025
Form 3File: NP LLP Form 3 March 25.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: NP LLP disclosure of inventory March 25.pdf5 Aug 2025
Withdrawal Update Form 1File: NP LLP Form- 1 June 2025.pdf5 Aug 2025
Withdrawal Update Form 2File: NP LLP Form - 2 June 2025.pdf5 Aug 2025
Withdrawal Update Form 3File: NP LLP Form -3 CA Certificate June 2025.pdf5 Aug 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: form 5 NCP.pdf16 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NP LLP Form 2A March 25.pdf15 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: NP LLP form 5 march 25.pdf15 Apr 2025
Details of encumbrances concerned to FinanceFile: Encumbrance financial.pdf25 Mar 2025
Details of encumbrances concerned to LegalFile: Encumbrance financial.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 revised final.pdf11 Mar 2025
Disclosure of sold/ booked inventoryFile: sold_booked inventory Nidhaan Corporate Park.pdf11 Mar 2025
Proforma of Agreement for saleFile: revised nidhaan agreement for sale 11032025 - with loan clause.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 revised Nidhaan Corporate Park (1).pdf17 Jan 2025
Layout approvalFile: PLANS.pdf16 Jan 2025
Building plan approvalFile: IOD.pdf16 Jan 2025
Copy of Layout Approval (in case of layout)File: PLANS.pdf16 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Nidhaan Corporate Park Dec 24.pdf14 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Nidhaan Corporate Park Dec 24.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Nidhaan Corporate Park Dec 24.pdf14 Jan 2025
Other - LegalFile: PRCard.pdf23 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: revised CC declaration (1).pdf15 Nov 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment Letter (1).pdf29 Oct 2024
Other - TechnicalFile: Amalgamation order by collector- Ghatkopar (1).pdf29 Oct 2024
Other - TechnicalFile: Ann- A declaration (1).pdf29 Oct 2024
Deviation Report with respect to model copy of AgreementFile: deviation report - agreement for sale (2) (1) (1)_1-14.pdf29 Oct 2024
Deviation Report with respect to model copy of AgreementFile: deviation report - agreement for sale (2) (1) (1)_15-end.pdf29 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI Anneruxe-A,Nehal (1).pdf29 Oct 2024
Proforma of Allotment letterFile: Nidhan allotment letter marked in blue is changes made by us marked in yellow is deviation28 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Nidhaan Corporate Park (2).pdf28 Oct 2024
Proforma of Agreement for saleFile: revised nidhan agreement for sale 13112024 (2).pdf28 Oct 2024
Declaration in FORM BFile: form B (17) (1).pdf25 Oct 2024
Declaration about Commencement CertificateFile: Format D CC declaration.pdf25 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format-A bank letter revised (1).pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 (2).pdf24 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 2449929_FurtherCC_signed.pdf24 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B Bank letter.pdf24 Oct 2024
Disclosure for secured/unsecured finance availed for the projectFile: secured-unsecured loan declaration.pdf24 Oct 2024
Copy of the legal title reportFile: 001 Legal Title Report-(final) RERA (1).pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form no 01,Architect's Certificate.pdf19 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI Annexure-A,RMS.pdf19 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI Annexure-A,NMS.pdf19 Oct 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI Annexure-A,BAD.pdf19 Oct 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Letter (1).pdf5 Jan 2024
CERSAI detailsFile: Cersai declaration (9).pdf5 Jan 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Letter (1).pdf5 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DOI Annexure -A,JVS.pdf5 Jan 2024
Building plan approvalFile: IOD.pdf28 Nov 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (12).pdf28 Nov 2023
PAN CardFile: Nidhaan Properties LLP PAN.pdf28 Nov 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (12).pdf28 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Certificate.pdf28 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf28 Nov 2023

How this compares with Mumbai Suburban

4%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NIDHAAN CORPORATE PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KURLA6,700+ in Mumbai Suburban

2 kmNIDHAAN CORPORATE PARKCompleted 132Lapsed / revoked 107Other 141Dot size: filed unitsN

Filed coordinates, straight-line distance. 380 registered projects within 2 km.

Builder: NIDHAAN PROPERTIES LLP

NIDHAAN PROPERTIES LLP has 1 registration on MahaRERA, including NIDHAAN CORPORATE PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if NIDHAAN CORPORATE PARK is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NIDHAAN CORPORATE PARK?

The registered promoter entity is NIDHAAN PROPERTIES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NIDHAAN CORPORATE PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NIDHAAN CORPORATE PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at NIDHAAN CORPORATE PARK?

The professionals named in the filing: Architect: SSA CONSULTANT; Engineer: Unisteps Consulting Pvt Ltd; Engineer: Sharad Teli; Chartered Accountant: HARSH NAGDA; Chartered Accountant: M. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NIDHAAN CORPORATE PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NIDHAAN CORPORATE PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NIDHAAN CORPORATE PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.