Red flags
- No red flags in this filing
Clear
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
NEWYORK BY MANJEERA is a Residential/Group Housing project by Manjeera Construction Ltd in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/220104/004620 on 4 Jan 2022. Possession is promised by 1 Jul 2025.
At a glance
Project
- NameNEWYORK BY MANJEERA
- TypeResidential/Group Housing
- Location
- Bengaluru North
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/309/PR/220104/004620
- ReraGenie IDRG-KA-30911
Builder
- NameManjeera Construction Ltd
- Entity typeCompany
- CINL45200TG1987PLC007228
- Authorized SignatoryG.Vivekananda
- DirectorsGajjala Yogananda, G.Vivekananda
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on4 Jan 2022
- Promised completion1 Jul 2025
- Revised completionNone
- Buildings1 building record
- Documents filed89 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Newyork By Manjeera | - | - | - | 370 | 0 | 370 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 23 Dec 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | Not applicable |
| Painting | - |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 23 Dec 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | Yes | - |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | - |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | Yes | - |
| Education/Health/Other public amenities | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Storm water drains | Yes | - |
| Use of renewable energy | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | - |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | Yes | - |
| Power Backup | Yes | - |
| Gas | Yes | - |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
Land and ownership3
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| K V Jayaprakash | - | - |
| M.Sridharreddy | - | - |
| MANI | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M.A Architect |
| Engineer | Manohar Consultants (Manohar N) |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed89
As listed on the registration, under the names the promoter filed them with; the newest 80 of 89 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/220104/004620 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| PROFORMA SALE DEED - UPLOADEDFile: Draft Sale Deed -NEWYORK BY MANJEERA.pdf | 23 Dec 2021 |
| PROFORMA AGREEMENT OF SALE - UPLOADEDFile: Draft AOS NEWYORK BY MANJEERA.pdf | 23 Dec 2021 |
| NO MORTGAGE AFFIDAVIT - UPLOADEDFile: No mortgage affidavit.pdf | 23 Dec 2021 |
| BWSSB NOCFile: BWSSB NOC.pdf | 16 Nov 2021 |
| DECLARATIONFile: Declaration.pdf | 16 Nov 2021 |
| KSPCB NOCFile: KSPCB NOC.pdf | 24 Sep 2021 |
| BWSSB AFFIDAVITFile: BWSSB NOC AFFIDAVIT.pdf | 11 Aug 2021 |
| DECLARATION ON BWSSBFile: declaration of bwssb.pdf | 23 Jun 2021 |
| BWSSB ACKNOWLEDGMENTFile: BWSSB ACK.jpeg | 10 Jun 2021 |
| DECLARATION ON BWSSBFile: declaration of bwssb.pdf | 10 Jun 2021 |
| SANCTION CONDITION / PLAN SANCTION LETTERFile: manjeera conditions.pdf | 10 Jun 2021 |
| REPLY TO QUERYFile: REPLY TO QUERY.pdf | 10 Jun 2021 |
| FINANCIALS OF 2019-20 WITH UDINFile: Financials 19 20 with UDIN.pdf | 25 May 2021 |
| AMALGAMATED KATHAFile: AMALGAMATED CERTIFICATE.pdf | 25 May 2021 |
| RELINQUISHMENT DEEDFile: RELINQUISHMENT DEED.pdf | 25 May 2021 |
| DECLARATION FOR BWSSB NOCFile: DECLARATION BWSSB NOC NEW.pdf | 25 May 2021 |
| LICENSE CONDITIONS BY BBMPFile: BUILDING LICENSE LETTER.pdf | 25 May 2021 |
| ELEVATIONFile: North side elevation.pdf | 25 May 2021 |
| section planFile: Section Plan.pdf | 25 May 2021 |
| site planFile: Site plan.pdf | 25 May 2021 |
| 1st, 2nd 3rd basement floor plansFile: 1 2 3 basement floor plans.pdf | 25 May 2021 |
| 1st & 2nd - 17th typical floor planFile: 1st floor & typical 2nd to 17th floor.pdf | 25 May 2021 |
| 18th floor & terrace planFile: 18th floor plan & Terrace plan.pdf | 25 May 2021 |
| ground floor planFile: Ground Floor Plan.pdf | 25 May 2021 |
| CertificateFile: Certificate of Incorporation.pdf | - |
| NOT AVIALABLE | - |
| APPROVAL LETEER& SANCTION PLAN | - |
| Approved plan | - |
| PROFORMA OF SALE DEED | - |
| PROFORMA OF AOS | - |
| SALE DEED RTC MR AKARBAND | - |
| section plan | - |
| NOT AVIALABLE | - |
| PROFORMA OF ALLOTMENT LETTER | - |
| NOT AVIALABLE | - |
| PROJECT SPECIFICATION | - |
| EC NEW | - |
| Affidavit 3(1) | - |
| JD AFFIDAVIT | - |
| KATHA | - |
| JDA | - |
| CONVERSTION ORDER & EC &RTC | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| FIRE NOC | - |
| Airport authority | - |
| BESCOM NOC | - |
| Unnamed document | - |
| KSPCB NOC | - |
| SEIAA NOC | - |
| BSNL NOC | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| SECTION PLAN | - |
| section plan | - |
| SECTION PLAN & SPECIFICATION | - |
| NOT AVIALABLE | - |
| CONVERSION ORDER | - |
| Balance Sheet 2019 - 2020File: Balancesheet 2020.pdf | - |
| Balance Sheet 2018 - 2019File: BALANCE SHEET 2019.pdf | - |
| Balance Sheet 2017 - 2018File: BALANCE SHEET 2018.pdf | - |
| Audited Profit and Loss Statement 2019 - 2020File: Profit & loss 2020.pdf | - |
| Audited Profit and Loss Statement 2018 - 2019File: PROFIT&LOSS2019.pdf | - |
| Audited Profit and Loss Statement 2017 - 2018File: PROFIT & LOSS 2018.pdf | - |
| Director's Report 2019 - 2020File: Directors Report-2020.pdf | - |
| Director's Report 2018 - 2019File: Directors Report-2019.pdf | - |
| Director's Report 2017 - 2018File: Directors Report-18.pdf | - |
| Cash Flow Statement 2019 - 2020File: Cashflow 2020.pdf | - |
| Cash Flow Statement 2018 - 2019File: CASHFLOW STATEMENT.pdf | - |
| Auditor's Report 2019 - 2020File: Auditor-2020.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep NEWYORK BY MANJEERA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 34 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Manjeera Construction Ltd
Manjeera Construction Ltd has 1 registration on RERA Karnataka, including NEWYORK BY MANJEERA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if NEWYORK BY MANJEERA is delayed beyond 1 Jul 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of NEWYORK BY MANJEERA?
The registered promoter entity is Manjeera Construction Ltd, a company as per the filing. Its CIN L45200TG1987PLC007228 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in NEWYORK BY MANJEERA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at NEWYORK BY MANJEERA?
The professionals named in the filing: Architect: M.A Architect; Engineer: Manohar Consultants (Manohar N). Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NEWYORK BY MANJEERA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback