Completed No litigation declared Residential / Group Housing project

NEW VRINDAVAN SPACES

By SONIA ANIL TINANI

RG-MH-28938 · RERA P51800027335 · Last updated on MahaRERA portal: 28 Apr 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 27 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

NEW VRINDAVAN SPACES is a Residential / Group Housing project by SONIA ANIL TINANI in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800027335 on 2 Dec 2020. The registration is recorded completed; possession was promised by 30 Jun 2025. The completion date has moved by 27 months from the original filing.

At a glance

Project

  • NameNEW VRINDAVAN SPACES
  • TypeResidential / Group Housing
  • Location
    • TARUN BHARAT SOC ROAD
    • CHAKALA
    • Andheri
    • Mumbai Suburban
    • 400099
  • Pincode400099
  • RERA no.P51800027335
  • ReraGenie IDRG-MH-28938

Builder

  • NameSONIA ANIL TINANI
  • Entity typeIndividual

Key dates

this monthRegisteredDec 2020First promiseMar 2023Revised toJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on2 Dec 2020
  • Promised completion30 Jun 2025
  • Revised completionRevised to 30 Jun 2025 (originally 30 Mar 2023)
  • Buildings1 building record
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
NEW VRINDAVAN SPACESNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

NEW VRINDAVAN SPACES: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 28 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area392 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
NEW VRINDAVAN CO OPERATIVE HOUSING SOCIETY LTDAndheriMumbai Suburban

Approvals and building plan

Permissible FSI1059.21
Proposed, not sanctioned391 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMumbai - Santacruz West

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
SONIA ANIL TINANI-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800013953Mar 2023 → Mar 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

EXT51800024523Mar 2023 → Dec 2024

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 7(3) in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19. We have consent of 55.56% allottees for purpose of extension of RERA registration period of the said project.

EXT51800028036Mar 2023 → Jun 2025

Reason as filed by the promoterWe apologize for the delay in the completion of the project and the submission of this request. The delay has occurred due to issues with procurement, unforeseen site conditions, coordination challenges, delays in obtaining the Occupancy Certificate (OC), and temporary financial constraints. Despite these setbacks, we are working diligently to address these issues and complete the remaining work. We are closely monitoring progress and taking all necessary steps to ensure timely completion. Given the circumstances, we kindly request an extension until 30-06-2025 to complete the project and fulf

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Nov 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Nov 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Apr 2025

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DOC-20250417-WA0047.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 New Vrindavan Spaces.PDF28 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate New Vrindavan Spaces.PDF28 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 New Vrindavan Spaces.PDF28 Mar 2025
Disclosure of sold/ booked inventoryFile: Revised Circular 29 - New Vrindavan Spaces.pdf28 Mar 2025
Other - TechnicalFile: Pert Chart New Vrindavan Spaces.PDF28 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 New Vrindavan Spaces.PDF28 Mar 2025
Declaration in FORM BFile: affidavir rera.PDF27 Mar 2025
Declaration about Commencement CertificateFile: Format D.pdf27 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A- 23-24.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: New Vrindavan Spaces - Form 1.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - New Vrindavan Spaces as on June 2024.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - New Vrindavan Spaces as on Sep 2024.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New Vrindavan Space as on 30-09-2024.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - New Vrindavan Spaces as on Sep 2024.pdf28 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - New Vrindavan Spaces June 2024.pdf7 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-2024.pdf7 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21 new vrindavan spaces.pdf7 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22 new vrindavan spaces -.pdf7 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23 new vrindavan spaces -.pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - New Vrindavan Space as on June 2024.pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 30-06-2024.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: gggggggggggg.pdf20 Jul 2024
Declaration in FORM BFile: Form B.PDF10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mar 24.PDF10 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 23.PDF10 Jul 2024
Disclosure of sold/ booked inventoryFile: Circular 29.pdf10 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 23.PDF10 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf10 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.PDF10 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.PDF10 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.PDF10 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - New Vrindavan Spaces as on March 2024.pdf19 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - New Vrindavan Spaces as on March 2024.pdf17 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - New Vrindavan Space as on March 2024.pdf17 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - New Vrindavan Spaces as on Dec 2023_compressed.pdf8 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - New Vrindavan Spaces Dec 2023.pdf6 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - New Vrindavan Spaces Dec 2023.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New Vrindavan Space as on 31-12-2023.pdf30 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_New Vrindavan Spaces_FY 2022-23.pdf30 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- New Vrindavan Spaces as on 17-10-2023 (REVISED).pdf1 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- New Vrindavan Spaces as on 17-10-2023.pdf31 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: New Vrindavan Spaces Sept 23 -Form 2.pdf27 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New Vrindavan Space as on 30-09-2023.pdf27 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- New Vrindavan Spaces as on June 2023.pdf26 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- New Vrindavan Spaces as on 30-06-2023.pdf25 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- New Vrindavan Spaces as on 16-08-2023.pdf18 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- New Vrindavan Spaces as on 23-03-2023_compressed.pdf8 Aug 2023
Building plan approvalFile: Latest Layout Plan.pdf19 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Latest Layout Plan.pdf19 May 2023
Commencement Certificates / NA Order for plotted developmentFile: Latest CC.pdf19 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- New Vrindavan Spaces as on March 2023.pdf19 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- New Vrindavan Spaces as on March 2023.pdf19 May 2023
Disclosure of sold/ booked inventoryFile: circular 29 (7).pdf21 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_New Vrindavan Spaces_FY 2021-22.pdf20 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- New Vrindavan Spaces.pdf14 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31st March 2022.pdf30 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- March 2022.pdf30 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: New_Vrindavan_Spaces-_Form_1_03_March_2022.pdf7 Mar 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 New Vrindavan Spaces .pdf7 Mar 2022
CERSAI detailsFile: New Vrindavan Spaces.pdf7 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 -New Vrindavan Spaces .pdf7 Mar 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New Vrindavan Spaces 30-09-2021 (1).pdf26 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 New Vrindavan Spaces FY 20-21.pdf18 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 New Vrndavan_compressed.pdf25 Sep 2021
Declaration about Commencement CertificateFile: New Vrindavan Spaces.pdf16 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: 2276637_FurtherCC_signed (1).pdf13 May 2021
Layout approvalFile: Space infra Plan.pdf27 Nov 2020
Building plan approvalFile: Space infra Plan.pdf27 Nov 2020
Copy of Layout Approval (in case of layout)File: Space infra Plan.pdf27 Nov 2020
Building Plan Approval / NA Order for plotted developmentFile: Space infra Plan.pdf27 Nov 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Space Infra.pdf27 Nov 2020
Details of encumbrancesFile: ENCUMBRANCE_compressed.pdf26 Nov 2020
Declaration in FORM BFile: FORM B_compressed.pdf26 Nov 2020
PAN CardFile: PAN CARD.pdf24 Nov 2020
Copy of the legal title reportFile: TITLE CERTIFICATE_compressed.pdf24 Nov 2020
Commencement Certificates / NA Order for plotted developmentFile: VRINDAVAN CC PLINTH.pdf24 Nov 2020

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 27 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep NEW VRINDAVAN SPACES on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHAKALA6,700+ in Mumbai Suburban

Builder: SONIA ANIL TINANI

SONIA ANIL TINANI has 1 registration on MahaRERA, including NEW VRINDAVAN SPACES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if NEW VRINDAVAN SPACES is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of NEW VRINDAVAN SPACES?

The registered promoter entity is SONIA ANIL TINANI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in NEW VRINDAVAN SPACES?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for NEW VRINDAVAN SPACES?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in NEW VRINDAVAN SPACES?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NEW VRINDAVAN SPACES. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NEW VRINDAVAN SPACES to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.