Home / Browse projects / Mumbai Suburban, Maharashtra / Neelkanth Prakash
Neelkanth Prakash
RG-MH-05974 · RERA P51800052983 · Last updated on MahaRERA portal: 10 Jun 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Neelkanth Prakash is a Residential / Group Housing project by Integrated Residences LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052983 on 10 Oct 2023. The registration is recorded completed; possession was promised by 31 Mar 2026. 5 of the 17 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameNeelkanth Prakash
- TypeResidential / Group Housing
- Location
- Garodia Nagar
- Gharkopar East
- Ghatkopar
- Kurla
- Mumbai Suburban
- 400077
- Pincode400077
- RERA no.P51800052983
- ReraGenie IDRG-MH-05974
Builder
- NameIntegrated Residences LLP
- Entity typePartnership
- PartnersGrishma Savla, Kantilal Savla, Nishit Savla
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on10 Oct 2023
- Promised completion31 Mar 2026
- Revised completionNone
- Buildings1 building record
- Documents filed82 files
Current status
Figures as on 10 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Neelkanth Prakash | NA | 10 | 9 | 17 | 0 | 17 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 10 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 85%.
Neelkanth Prakash: 67% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 78% |
| Sanitary Fittings within the flats / premises | 10% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Progress on shared amenities15
As on 10 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 20% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed26
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Neelkanth Prakash Co-operative Housing Society Ltd | Ghatkopar | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Neelkanth Prakash | NA | Rs 9.99 cr | Rs 9.54 cr |
| - | NA | Rs 30.00 lakh | Rs 22.00 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SHRI BS SURESHKUMAR |
| Engineer | Amit Nathgosavi |
| Engineer | dayanand salunke |
| Engineer | PRASHANT ANANT PATERE |
| Chartered Accountant | NEHALI & CO |
| Chartered Accountant | GAJARIA SHAH AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| Integrated Residences LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Jan 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: OC.pdf | 10 Jun 2026 |
| Occupational CertificateFile: OC plans.pdf | 10 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 - Neelkanth Dec-25.pdf | 28 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Neelkanth Dec-25.pdf | 28 May 2026 |
| Withdrawal Update Form 3File: Form 3 - NeelKanth Dec 25.pdf | 28 May 2026 |
| Withdrawal Update Form 1File: Form 1 - Neelkanth Dec-25.pdf | 26 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 - Neelkanth Dec-25.pdf | 26 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - NeelKanth Dec 25.pdf | 26 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 SEP 25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Neelkanth.pdf | 13 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - Neelkanth Sept-25.pdf | 13 Jan 2026 |
| Layout approvalFile: Amended plans plans_1-2.pdf | 8 Jan 2026 |
| Layout approvalFile: Amended plans plans_3-end.pdf | 8 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 SEP 25.pdf | 28 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Neelkanth.pdf | 28 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 - Neelkanth Sept-25.pdf | 28 Oct 2025 |
| Withdrawal Update Form 1File: Form1 Neelkanth.pdf | 3 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 - Neelkanth Jun 25 (1).pdf | 3 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 - Neelkanth Jun 25.pdf | 3 Oct 2025 |
| Form 2A (FY 2024-2025)File: Form 2A - Neelkanth.pdf | 3 Oct 2025 |
| Form 5 (FY 2024-2025)File: Signed Form 5 - IRLLP (1).pdf | 3 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (Neelkanth Prakash).pdf | 1 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_From 3- NeelKanth Mar 25.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: IRLLP Neelkanth - Form 2.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 22 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 22 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Full CC_signed.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 21 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 21 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 21 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 21 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 CERTIFICATE.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 10 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 CERTIFICATE.pdf | 10 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 12 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 12 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Neelkanth.pdf | 26 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: further cc upto 8th floor_260624.pdf | 28 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: NP - Rera form 2A.pdf | 5 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Certificate- Neel Kanth March 24.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Neelkant Prakash (1).pdf | 9 May 2024 |
| Disclosure of sold/ booked inventoryFile: Declaration for Inventory.pdf | 5 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Neelkanth Prakash.pdf | 2 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate- Neel Kanth dec'23.pdf | 7 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 23 Neelkanth Prakash.pdf | 29 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01_form 1 (neelkanth).pdf | 11 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: IRLLP Encumbrance.pdf | 4 Nov 2023 |
| Details of encumbrances concerned to LegalFile: IRLLP Encumbrance.pdf | 4 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: IRLLP_Encumbrance_July-Sep 2023.pdf | 2 Nov 2023 |
| Details of encumbrances concerned to LegalFile: IRLLP_Encumbrance_July-Sep 2023.pdf | 2 Nov 2023 |
| Declaration about Commencement CertificateFile: CC Declaration Neelkanth Prakash.pdf | 27 Sep 2023 |
| Other - TechnicalFile: 22a_amended plans - letter_010923 1.pdf | 23 Sep 2023 |
| Other - TechnicalFile: 22b_amended plans - plans_010923 1_1-1.pdf | 23 Sep 2023 |
| Other - TechnicalFile: 22b_amended plans - plans_010923 1_2-2.pdf | 23 Sep 2023 |
| Other - TechnicalFile: 22b_amended plans - plans_010923 1_3-3.pdf | 23 Sep 2023 |
| Other - TechnicalFile: 22b_amended plans - plans_010923 1_4-end.pdf | 23 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 2383935_FirstCC_signed.pdf | 19 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE SELF DECLARATION - NP.pdf | 8 Jun 2023 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE SELF DECLARATION - NP.pdf | 8 Jun 2023 |
| CERSAI detailsFile: CERSAI DECLARATION - NP.pdf | 8 Jun 2023 |
| Proforma of Agreement for saleFile: Neelkanth Prakash Flat Sale- Draft Agreement.pdf | 8 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK ACCOUNT LETTTER.pdf | 8 Jun 2023 |
| Building plan approvalFile: IOD Letter.pdf | 26 May 2023 |
| Layout approvalFile: iod plans_301222_1-1.pdf | 26 May 2023 |
| Layout approvalFile: iod plans_301222_2-2.pdf | 26 May 2023 |
| Layout approvalFile: iod plans_301222_3-end.pdf | 26 May 2023 |
| PAN CardFile: IRLLP PAN CARD_1.pdf | 26 May 2023 |
| Copy of the legal title reportFile: Title Certificate.pdf | 26 May 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance.pdf | 26 May 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrance.pdf | 26 May 2023 |
| Copy of Layout Approval (in case of layout)File: iod plans_301222_1-1.pdf | 26 May 2023 |
| Copy of Layout Approval (in case of layout)File: iod plans_301222_2-2.pdf | 26 May 2023 |
| Copy of Layout Approval (in case of layout)File: iod plans_301222_3-end.pdf | 26 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD Letter.pdf | 26 May 2023 |
| Declaration in FORM BFile: Form B.pdf | 26 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed- Form 3 - CA Certificate- Neelkanth Prakash.pdf | 26 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: DOI - All Director.pdf | 26 May 2023 |
| Proforma of Allotment letterFile: Final Allotment Letter - Neelkanth Prakash.pdf | 26 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 82 filed documents as one ZIP, foldered, with a manifest
Keep Neelkanth Prakash on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Gharkopar East6,700+ in Mumbai Suburban
Mahindra Rainforest Phase 1
Anthurium Developers Limited
Mahindra Rainforest Phase 2
Anthurium Developers Limited
CRYSTAL PRIME MERIDIAN
ARYAMAAN DEVELOPERS PRIVATE LIMITED
AARADHYA ONEPARK
MICL CREATORS LLP
CENTRONA ZEN-A
ELEVATED AVENUE REALTY LLP
CENTRONA ZEN-B
ELEVATED AVENUE REALTY LLP
See every Mumbai Suburban project, with the district possession charts
Builder: Integrated Residences LLP
Integrated Residences LLP has 1 registration on MahaRERA, including Neelkanth Prakash. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Neelkanth Prakash is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Neelkanth Prakash?
The registered promoter entity is Integrated Residences LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Neelkanth Prakash?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Neelkanth Prakash?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Neelkanth Prakash?
The professionals named in the filing: Architect: SHRI BS SURESHKUMAR; Engineer: Amit Nathgosavi; Engineer: dayanand salunke; Engineer: PRASHANT ANANT PATERE; Chartered Accountant: NEHALI & CO; Chartered Accountant: GAJARIA SHAH AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Neelkanth Prakash?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback