NCC Urban Lake Springs

By NCC URBAN INFRASTRUCTURE LIMITED

RG-KA-21048 · RERA PRM/KA/RERA/1251/310/PR/221024/007161 · Last updated on RERA Karnataka portal: 15 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jun 2028Possession promisedno revision filed
0 of 18Construction stages donefurthest along: Earth work and other leveling..., 95%
147 of 272Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 198 documents Report an error

NCC Urban Lake Springs is a Residential/Group Housing project by NCC URBAN INFRASTRUCTURE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/221024/007161 on 22 Oct 2024. Possession is promised by 28 Jun 2028. 125 of the 272 units on this registration are recorded sold or booked, and 0 of 18 construction stages are filed complete.

At a glance

Project

  • NameNCC Urban Lake Springs
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/221024/007161
  • ReraGenie IDRG-KA-21048

Builder

  • NameNCC URBAN INFRASTRUCTURE LIMITED
  • Entity typeCompany
  • GSTIN29AACCN2301G1ZV
  • Authorized SignatoryJSR RAJU
  • Managing DirectorNR ALLURI
  • DirectorsJSR RAJU, NR ALLURI
  • Project HeadRaji Reddy G
  • Other registrations4 more →
  • Declared earlier projects5 →

Key dates

this monthRegisteredOct 2024PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on22 Oct 2024
  • Promised completion28 Jun 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed198 files

Current status

46%125 of 272 units booked
12.4%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---68068
B---68068
C---68068
D---68068

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 18 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 95%.

Building: 47% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work95%
Foundation footing work95%
Upto Plinth Level90%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)80%
Retaining wall (All types)95%
RCC or MS Framed structure90%
Masonry Construction65%
Plastering inside , outside & Ceiling55%
Joinery: Doors, Windows, Ventilators etc5%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)30%
Railing and Grill fixing30%
Electrification, Water supply and Sanitary Finishing25%
Painting10%
Fire prevention and fire fighting fitting and fixture with network40%
Weather Proof work(tile,concrete)40%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings3%

Progress on shared amenities30

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes50%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes75%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes20%
StaircasesYes80%
LiftsYes75%
Corridor/LobbiesYes60%
Fire escapesYes5%
Common entrance and exit for the building/common portico/foyer/verandahYes15%
BasementYes65%
TerraceYes30%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesYes0%

Land and ownership8

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners8
LandownerVillageDistrict
S Pratap Reddy--
S Jayaram Reddy--
S PRATHAP REDDY--
J Surendra Reddy--
J Surendra Reddy--
J Surendra Reddy--
J Surendra Reddy--
J Surendra Reddy--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 133.66 cr
Cost incurredRs 16.53 cr
Spent of the estimate12.36%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 103.76 crRs 12.70 cr
On-site expenditure-Salaries of workersRs 18.31 crRs 3.06 cr
On-site expenditure-Site OverheadRs 9.15 crRs 72.28 lakh
On-site expenditure-Consultants FeesRs 2.44 crRs 4.65 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s.Venkataramanan Associates
EngineerDesign Ventures Engineering Consultants (I) Pvt Ltd
Chartered AccountantP Mohan Raju

Litigation declared1

CaseCourtStatus
2891st Additional Civil Judge-

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed198

As listed on the registration, under the names the promoter filed them with; the newest 80 of 198 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/221024/007161 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-04 CA Lakesprings Sep2026.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-05 ARCHITECT CERTIFICATE Sep 2026 LS.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-06 Engg Certificate Sep 2026 Lakesprings.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-04 CA Certificate june 2026 Lake Springs compressed.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-05 ARCHITECT CERTIFICATE -June 2026 Lakesprings.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-06 ENGG CERTIFICATE -June 2026 Lakesprings.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-04 CA Certificate Mar 2026 Lakesprings.pdf15 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-05 Architect Mar-2026 LS.pdf15 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-06 Engg Mar-2026 Lakesprings.pdf15 Apr 2026
Q4 2025-26 Water supply and sewage board15 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)15 Apr 2026
Q4 2025-26 KPTCL- BESCOM15 Apr 2026
Q4 2025-26 Fire and Safety15 Apr 2026
Q4 2025-26 Airport Authority of India15 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department15 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-04 CA Dec-2025 Lakesprings.pdf5 Feb 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-05 ARCHITECT CERTIFICATE -Dec- 2025.pdf5 Feb 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-06 Engg Dec-2025 Lakesprings.pdf5 Feb 2026
Q3 2025-26 Water supply and sewage board5 Feb 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)5 Feb 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)5 Feb 2026
Q3 2025-26 KPTCL- BESCOM5 Feb 2026
Q3 2025-26 Fire and Safety5 Feb 2026
Q3 2025-26 Airport Authority of India5 Feb 2026
Q3 2025-26 BSNL/Telecommunication Department5 Feb 2026
Query Reply LetterFile: Query Clarification letter.pdf21 Oct 2024
Final Release order MistywoodsFile: Final release order Mistywoods.pdf21 Oct 2024
Completion certificateFile: Form05 06 MISTY WOODS.pdf21 Oct 2024
Applied for completion of projectFile: Mistywoods Applied for completion.pdf21 Oct 2024
CA Certificate with Three Bank accountsFile: Form-01 CA Certificate with 3 bank accounts.pdf10 Oct 2024
Source of FundsFile: Source of funds letter.pdf10 Oct 2024
Highcourt Order copyFile: WP15675-2023 16 04 2024.pdf10 Oct 2024
ADLR sketchFile: ADLR SKETCH Aalahalli.pdf10 Oct 2024
Architect CertificateFile: Form 02 Architect Certificate.pdf10 Oct 2024
Architect registration certificateFile: Architect COA certificate.pdf10 Oct 2024
Master plan extract ear marking the proposed landFile: Alahalli CDP - 2015.pdf10 Oct 2024
Village Map certified by concern officerFile: Village Map certified.pdf10 Oct 2024
Proposed land in Village MapFile: Proposed land marked in village Map.pdf10 Oct 2024
Query Reply Clarification LetterFile: Reply letter.pdf10 Oct 2024
Conversion 32 42File: Conversion 32 42.pdf10 Oct 2024
Conversion 32 42 (1)File: Conversion 32 42 (1).pdf10 Oct 2024
Conversion 32 42 (2)File: Conversion 32 42 (2).pdf10 Oct 2024
Conversion 32 42 (3)File: Conversion 32 42 (3).pdf10 Oct 2024
Conversion 32 42 (4)File: Conversion 32 42 (4).pdf10 Oct 2024
Conversion 32 42 (5)File: Conversion 32 42 (5).pdf10 Oct 2024
Conversion 32 42 (6)File: Conversion 32 42 (6).pdf10 Oct 2024
Memorandum of AssociationFile: Memorandum of Association.pdf12 Sep 2024
Article of AssociationFile: Article of Association.pdf12 Sep 2024
Annual Audit report GP One 21-22File: Form 07 Annual audit report 21-22 Submitted Acknowledgement GP One.pdf12 Sep 2024
Annual Audit report GP One 22-23File: Form 07 Annual Audit Report GP One 22-23 Acknowledgement.pdf12 Sep 2024
Annual Audit report Park View 22-23File: Form 07 Annual audit report acknowledgement Park View 22-23.pdf12 Sep 2024
Organization structureFile: Organization structure.pdf12 Sep 2024
Director's KYC Self attestedFile: Director KYC Self attested.PDF12 Sep 2024
Director's financial statement clarificationFile: Directors financial report clarification.pdf12 Sep 2024
Sources of fundsFile: Source of funds document.pdf12 Sep 2024
Layout plan for area measurement- Sanction drgFile: Santion drawings PRJ 2872 22-23.pdf12 Sep 2024
Project cost estimate clarificationFile: Project estimated cost clarification.pdf12 Sep 2024
CA Certificate - Form-01 in prescribed formatFile: Form-01 CA Certificate Lakesprings.pdf12 Sep 2024
Borrowing details clarificationFile: Source of funds document.pdf12 Sep 2024
RTC for the year 2024-25 for all Sy NosFile: RTC 24-25 All sy nos.pdf12 Sep 2024
EC 01.04.2008 to till date for all project sy nosFile: EC 01 04 2008 to Till date.pdf12 Sep 2024
Sale deed /title deed in favour of joint land ownersFile: 38810- sale deed.pdf12 Sep 2024
Notarized non litigation affidavitFile: Notarized non litigation affidavit containing project name.pdf12 Sep 2024
Guidance valueFile: Guideline value self attested.pdf12 Sep 2024
Building License from local AuthorityFile: Building License- BBMP.pdf12 Sep 2024

How this compares with Bengaluru Urban

46%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep NCC Urban Lake Springs on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: NCC URBAN INFRASTRUCTURE LIMITED

NCC URBAN INFRASTRUCTURE LIMITED has 5 registrations on RERA Karnataka, including NCC URBAN GREEN PROVINCE PHASE 2 and NCC Urban Green Province One. Its filings declare 5 earlier projects, 2 of them declared completed. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if NCC Urban Lake Springs is delayed beyond 28 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of NCC Urban Lake Springs?

The registered promoter entity is NCC URBAN INFRASTRUCTURE LIMITED, a company as per the filing. Its GSTIN 29AACCN2301G1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in NCC Urban Lake Springs?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at NCC Urban Lake Springs?

The professionals named in the filing: Architect: M/s.Venkataramanan Associates; Engineer: Design Ventures Engineering Consultants (I) Pvt Ltd; Chartered Accountant: P Mohan Raju. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NCC Urban Lake Springs?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NCC Urban Lake Springs. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NCC Urban Lake Springs to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.