ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Nav Ashish Premises Co-Operative Society Ltd

Registered Litigation declared Others project

Nav Ashish Premises Co-Operative Society Ltd

By M/S S K Developers

RG-MH-18430 · RERA P51800076681 · Last updated on MahaRERA portal: 25 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 1 case

Clear

  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
28 of 29Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

Nav Ashish Premises Co-Operative Society Ltd is a Others project by M/S S K Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800076681 on 20 Jun 2024. Possession is promised by 26 Apr 2029. 1 of the 29 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameNav Ashish Premises Co-Operative Society Ltd
  • TypeOthers
  • Location
    • Hingwala Lane
    • Ghatkopar East
    • Ghatkopar
    • Kurla
    • Mumbai Suburban
    • 400077
  • Pincode400077
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800076681
  • ReraGenie IDRG-MH-18430

Builder

  • NameM/S S K Developers
  • Entity typePartnership
  • PartnersDarshan Mahesh Mehta, Mahesh Shantilal Mehta, Vidhi Darshan Mehta

Key dates

this monthRegisteredJun 2024PromisedApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jun 2024
  • Promised completion26 Apr 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed85 files

Current status

3%1 of 29 units booked
55.3%Work done, per cost certificate

Figures as on 25 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Nav Ashish Premises Co-Operative Society LtdNA151021829

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

Nav Ashish Premises Co-Operative Society Ltd: 71% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises1%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed41

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots41
Closed/Covered40
Open Space1

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area719 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jul 2025
LandownerVillageDistrict
Nav Ashish Premises Co-Operative Society LtdGhatkoparMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2205.69
Proposed, not sanctioned2,206 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch77, Prabha, Ratilal Mehta Marg, Ghatkopar East, Mumbai - 400077
Estimated costRs 10.25 cr
Cost incurredRs 5.66 cr
Work done55.26%
BuildingWingEstimatedIncurred
Nav Ashish Premises Co-Operative Society LtdNARs 10.25 crRs 5.66 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. Ashish Bhatt & and Associates
EngineerDilip P. Parekh
EngineerMAHESH MEHTA
Chartered AccountantM L Jethva & Co Chartered Accountants
PartnerRole in project
S K Developers-

Litigation declared1

CaseCourtStatus
318/2023District Superintendent of Land Records, Mumbai Suburban DistrictClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 26 Apr 2029

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 March 2026.pdf25 May 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf25 May 2026
Withdrawal Update Form 3File: Form 3 08 May 2026.pdf25 May 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1 March 2026.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2 March 2026.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf28 Apr 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf28 Apr 2026
Form 2A (FY 2025-2026)File: SKM_C224e M26042422191- Form 2A.pdf27 Apr 2026
Form 5 (FY 2025-2026)File: Form 5 FY 25-26.pdf27 Apr 2026
Form 1File: Form 1.pdf21 Feb 2026
Form 2File: Form 2.pdf21 Feb 2026
Form 3File: Form 3.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on dated 31-03-2025.pdf21 Feb 2026
Form 1File: Form 1.pdf21 Feb 2026
Form 2File: Form 2.pdf21 Feb 2026
Form 3File: Form 3.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 as on December 2024.pdf21 Feb 2026
Form 1File: Form 1.pdf21 Feb 2026
Form 2File: Form 2.pdf21 Feb 2026
Form 3File: Form 3.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 as on September 2024.pdf21 Feb 2026
Form 1File: Form 1.pdf21 Feb 2026
Form 2File: Form 2.pdf21 Feb 2026
Form 3File: Form 3.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 as on June 2024.pdf21 Feb 2026
Withdrawal Update Form 1File: Form 1 as on December 2025.pdf21 Feb 2026
Withdrawal Update Form 2File: Form 2 as on December 2025.pdf21 Feb 2026
Withdrawal Update Form 3File: Form 3 December 2025.pdf21 Feb 2026
Layout approvalFile: Plan 1.pdf24 Dec 2025
Building plan approvalFile: Plan 1.pdf24 Dec 2025
Building plan approvalFile: Plan 2.pdf24 Dec 2025
Building plan approvalFile: Plan 3.pdf24 Dec 2025
Building plan approvalFile: Plan 4.pdf24 Dec 2025
Building plan approvalFile: Plan 5.pdf24 Dec 2025
Building plan approvalFile: Plan 6.pdf24 Dec 2025
Withdrawal Update Form 1File: Form 1 June 2025 Final.pdf24 Dec 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 as on September 2025.pdf24 Dec 2025
Withdrawal Update Form 2File: Form 2 June 2025 Final.pdf24 Dec 2025
Withdrawal Update Form 2File: Withdrawal Application Form2 as on September 2025.pdf24 Dec 2025
Withdrawal Update Form 3File: Form 3 June 2025.pdf24 Dec 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 Final.pdf24 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A for FY 24-25.pdf25 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 FY 24-25.pdf25 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf29 Apr 2025
Form 229 Apr 2025
Form 229 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf4 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf4 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf4 Nov 2024
Deviation Report with respect to model copy of AgreementFile: AFS Deviation.pdf6 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN Darshan Mehta.pdf3 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN Mahesh Mehta.pdf3 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DIN Vidhi Mehta.pdf3 Jun 2024
Proforma of Allotment letterFile: Allotment Letter.pdf3 Jun 2024
Deviation Report with respect to Allotment letterFile: Allotment Deviation.pdf3 Jun 2024
Other - LegalFile: Order 50.pdf3 Jun 2024
Other - TechnicalFile: Order 50.pdf3 Jun 2024
Layout approvalFile: IOD DRAWINGS UP TO 11TH FLOOR-1.pdf31 May 2024
Building plan approvalFile: IOD DRAWINGS UP TO 11TH FLOOR-2.pdf31 May 2024
Building plan approvalFile: IOD DRAWINGS UP TO 11TH FLOOR-3.pdf31 May 2024
Building plan approvalFile: IOD DRAWINGS UP TO 11TH FLOOR-4.pdf31 May 2024
PAN CardFile: S K DEVELOPERS PAN CARD.pdf31 May 2024
Copy of the legal title reportFile: legal title report 29-05-2024.pdf31 May 2024
Details of encumbrances concerned to FinanceFile: encumbrance - finance.pdf31 May 2024
Details of encumbrances concerned to FinanceFile: encumbrance legal.pdf31 May 2024
Details of encumbrances concerned to LegalFile: encumbrance - finance.pdf31 May 2024
Details of encumbrances concerned to LegalFile: encumbrance legal.pdf31 May 2024
Copy of Layout Approval (in case of layout)File: IOD DRAWINGS UP TO 11TH FLOOR-1.pdf31 May 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD DRAWINGS UP TO 11TH FLOOR-2.pdf31 May 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD DRAWINGS UP TO 11TH FLOOR-3.pdf31 May 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD DRAWINGS UP TO 11TH FLOOR-4.pdf31 May 2024
Commencement Certificates / NA Order for plotted developmentFile: 2424856_FirstCC_signed.pdf31 May 2024
Declaration about Commencement CertificateFile: CC Declaration.pdf31 May 2024
Declaration in FORM BFile: form b - promoter.pdf31 May 2024

How this compares with Mumbai Suburban

3%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Nav Ashish Premises Co-Operative Society Ltd on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghatkopar East6,700+ in Mumbai Suburban

2 kmNav Ashish Premises Co-OCompleted 132Lapsed / revoked 98Other 125Dot size: filed unitsN

Filed coordinates, straight-line distance. 355 registered projects within 2 km.

Builder: M/S S K Developers

M/S S K Developers has 1 registration on MahaRERA, including Nav Ashish Premises Co-Operative Society Ltd. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Nav Ashish Premises Co-Operative Society Ltd is delayed beyond 26 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Nav Ashish Premises Co-Operative Society Ltd?

The registered promoter entity is M/S S K Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Nav Ashish Premises Co-Operative Society Ltd?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Nav Ashish Premises Co-Operative Society Ltd?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Nav Ashish Premises Co-Operative Society Ltd?

The professionals named in the filing: Architect: M/s. Ashish Bhatt & and Associates; Engineer: Dilip P. Parekh; Engineer: MAHESH MEHTA; Chartered Accountant: M L Jethva & Co Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nav Ashish Premises Co-Operative Society Ltd?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nav Ashish Premises Co-Operative Society Ltd. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nav Ashish Premises Co-Operative Society Ltd to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.