Home / Browse projects / Bengaluru Urban, Karnataka / Nandi Citadel

Registration approved Residential/Group Housing project

Nandi Citadel

By Nandi Housing Private Limited

RG-KA-65222 · RERA PRM/KA/RERA/1251/310/PR/171208/000925 · Last updated on RERA Karnataka portal: 1 Mar 2021

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 27 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2022Possession promisedmoved 27 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 121 documents Report an error

Nandi Citadel is a Residential/Group Housing project by Nandi Housing Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171208/000925 on 8 Dec 2017. Possession is promised by 31 Mar 2022. The completion date has moved by 27 months from the original filing.

At a glance

Project

  • NameNandi Citadel
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/171208/000925
  • ReraGenie IDRG-KA-65222

Builder

  • NameNandi Housing Private Limited
  • Entity typeCompany
  • Authorized SignatoryThommen Ollapally
  • OthersVinod R
  • Other registrations1 more →

Key dates

this monthRegisteredDec 2017First promiseDec 2019Revised toMar 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on8 Dec 2017
  • Promised completion31 Mar 2022
  • Revised completionRevised to 31 Mar 2022 (originally 31 Dec 2019)
  • Buildings16 building records
  • Documents filed121 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block 1 (Wing A)---60060
Block 1 (Wing B)---60060
Block 1 (Wing C)---60060
Block 1 (Wing D)---60060
Block 1 (Wing E)---60060
Block 1 (Wing F)---60060
Block 1(Wing G)---60060
Block 1 (Wing H)---60060
Block 1 (Wing I)---60060
Block 1 (Wing J)---60060
Block 2 (WING - L)---75075
Block 2 (Wing M)---39039
Block 2 (Wing N)---39039
Block 2 (Wing P)---39039
Block 2 (Wing Q)---39039
Clubhouse Building---64064

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 1 Mar 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etcNot applicable
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 1 Mar 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesNoNot applicable
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area51,799 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 165.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA & A Architects
EngineerInnotech Engineering Consult

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/310/PR/220712/000925Dec 2019 → Dec 2020

Reason as filed by the promoterApplied for modification

ExtensionDec 2020 → Mar 2022

No reason recorded in the filing

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed121

As listed on the registration, under the names the promoter filed them with; the newest 80 of 121 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171208/000925 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
OCCUPANCY CERTIFICATEFile: OC - Nandi Citadel-10 blocks.pdf1 Mar 2021
CertificateFile: NHPL - ROC Certificate of Incorporation.pdf-
Project Details-
Modified plan details site plan, floor plans, Plan Licence LetterFile: 2 DP 17-07-2015.pdf-
Elevation, Sections, Specifications ( If changes are there )File: 7 OF 8 ELEVATION AND SECTION c.pdf-
List Of AllotteesFile: NC Unit details for RERA + studio units.xlsx-
Chartered Accountant CertificateFile: NHPL RERA Form-4 CA Certificate (NC Project).pdf-
Notarized AffidavitFile: affidavit cum declaration.pdf-
Engineer CertificateFile: engineer certificate - modified - 2019.pdf-
Architect CertificateFile: engineer certificate - modified - 2019.pdf-
Structural Engineer Certificate for stability of structureFile: Block 1, structural stability certificate - A, B, J - 3 blocks.pdf-
Modification of Plan DetailsFile: Final DP MD.pdf-
Modification of Plan DetailsFile: 2 DP 17-07-2015.pdf-
Modification of Plan DetailsFile: 3 Partial Commencement Certificate dt 20-01-2014 Block 1 Wing D E F G 4 Bllocks.pdf-
Modification of Plan DetailsFile: 4 Commencement Certificate for Blocks - A, B, C, H, I & J 18-08-2015 6 blocks.pdf-
Modification of Plan DetailsFile: NC Unit details for RERA + studio units.xlsx-
Modification of Plan DetailsFile: NC Unit details for RERA + studio units.xlsx-
Document 1File: BESCOM NOC.pdf-
Document 2File: BWSSB NOC.pdf-
Document 3File: KSPCB 851 units.pdf-
BDA Work OrderFile: Work order old 20-01-2012.pdf-
BBMP Building LicenseFile: BBMP - Plan Sanction letter 11-09-2012.pdf-
Plan 1 of 8File: 1 of 8 Site Plan BBMP dt 11-09-2012.pdf-
Plan 2 of 8File: 2 of 8 11-09-2012 for Block 1 and 2 for 710 units c.pdf-
Plan 3 of 8File: 3 of 8 GROUND FLOOR PLAN c.pdf-
Plan 4 of 8File: 4 OF 8 BLOCK -1 1ST TO 4TH TYPICAL FLOOR PLAN c.pdf-
Plan 5 of 8File: 5 OF 8 BLOCK-1 TERRACE FLOOR PLAN c.pdf-
Plan 6 of 8File: 6 OF 8 BLOCK-2 TYPICAL-1ST TO 4TH FLOOR AND TERRACE FLOOR PLAN c.pdf-
Plan 7 of 8File: 7 OF 8 ELEVATION AND SECTION c.pdf-
Plan 8 of 8File: 8 OF 8 BLOCK-1 1ST FLOOR PLAN c.pdf-
Modified work orderFile: 1 Modified Work Order 17-07-2015.pdf-
Development planFile: 2 DP 17-07-2015.pdf-
POC 2014File: 3 Partial Commencement Certificate dt 20-01-2014 Block 1 Wing D E F G 4 Bllocks.pdf-
Commencement CertificateFile: 4 Commencement Certificate for Blocks - A, B, C, H, I & J 18-08-2015 6 blocks.pdf-
Block-2 Commencement CertificateFile: 5 Phase - II Commencement Certificate 5 blocks 31-10-2019.pdf-
Block-02 Terrace floorFile: BLOCK 2 TERRACE FLOOR PLAN SECTION.pdf-
Block-02 Ground FloorFile: GROUND FLOOR 1-2-3-4 FLOOR PLAN Block-2.pdf-
Block-2 CCFile: NC - Phase - II Commencement Certificate.pdf-
POC for Block-1File: 1 Partial Occupancy Certificate for Block 1 Wing F G H I and J 14-08-2019.pdf-
POC for Block-1 remaining blocksFile: 2 Partial Occupancy Certificate dt 24-10-2019 Block 1 Wing A B C D and E.pdf-
FInal OC for Block-2File: 3 Final Occupancy Certificate.pdf-
B F for Block-1 and 2File: BASEMENT FLOOR PLAN for Block 1 and 2.pdf-
G F for Block-1 and 2File: GROUND FLOOR PLAN for Block 1 and 2.pdf-
Site plan for 831 unitsFile: SITE PLAN 14-03-2019 831 units_compressed.pdf-
of 4 of studio apartmentFile: 1 of 4 Studio - Site Plan_compressed.pdf-
of 4 of studio apartmentFile: 2 of 4 studio - Site Base & Ground Floor Plan.pdf-
of 4 of studio apartmentFile: 3 of 4 studio - Site 1, 2, 3rd Floor Plan-1.pdf-
of 4 of Studio ApartmentFile: 4 of 4 Site 4th & Terrace Floor Plan.pdf-
Commencement CertificateFile: 11-05-2018 CC for Club House.pdf-
Club House OCFile: NC - Club House OC.pdf-
AffidavitFile: affidavit cum declaration.pdf-
Structural Stability 1File: Block 1, structural stability certificate - A, B, J - 3 blocks.pdf-
Structural Stability 2File: Block 1, structural stability certificate - E, F, D, G, C, H & I - 7 blocks.pdf-
Engineering CertificateFile: engineer certificate - modified - 2019.pdf-
CA CertificateFile: NHPL RERA Form-4 CA Certificate (NC Project).pdf-
Fund Required CertificateFile: CA - Certificate - Funds required - 2019.pdf-
Fund Utilized CertifcateFile: CA - Certificate - Funds Utilized - 2019.pdf-
Engineering CertificateFile: Nandi Citadel - Engineer certificate.pdf-
Architect CertificateFile: Nandi Citadel - Architect certificate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: completion certificate - Schedule - VIII (1).pdf-
Engineer Certificate for Work Completion Schedule till DateFile: structural stability certificate - 10 blocks.pdf-
CA Certificate for Funds UtilizationFile: CA - Certificate - Funds Utilized (1).pdf-
Architect Certificate for Pending Work Completion Schedule.File: pending work (1).pdf-
Engineer Certificate for Pending Work Completion Schedule.File: pending work (1).pdf-
CA Certificate for Funds required for Project CompletionFile: CA - Certificate - Funds required (1).pdf-
AffidavitFile: affidavits (1).pdf-
Latest Encumbrance CertificateFile: encumbrance certificate (1).pdf-
Details Of Sold/ Un-sold UnitsFile: sold-unsold list.xlsx-
NOC DetailsFile: cfe renewed_compressed (2).pdf-
Document 1File: Environmental Clearance - renewed (1).pdf-
Document 2File: rera letter.pdf-
Document 3File: OC - 1 & 2 (2).pdf-
Document 4File: Status update for Ticket No_TO1802209291 registered with RERA Karnataka_ RESOLVED_.eml-
NC - Commencement Certificate for Blocks - F, E, G & D-
Final DP MD-
draft sale deed-
Nc - draft agreement to sell-
BBMP sanctioned plan-
20170902-SECTION & ELE-3-
Sale Deed and RTC-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 27 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Nandi Citadel on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Nandi Housing Private Limited

Nandi Housing Private Limited has 2 registrations on RERA Karnataka, including Nandi Citadel and NANDI MERAKI. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Nandi Citadel is delayed beyond 31 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Nandi Citadel?

The registered promoter entity is Nandi Housing Private Limited, a company as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Nandi Citadel?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Nandi Citadel?

The professionals named in the filing: Architect: A & A Architects; Engineer: Innotech Engineering Consult. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Nandi Citadel?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Nandi Citadel. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Nandi Citadel to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.