NANDAKAM APARTMENT

By SLV CONSTRUCTIONS

RG-KA-78869 · RERA PRM/KA/RERA/1669/440/PR/080926/008918 · Last updated on RERA Karnataka portal: 1 Sep 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2030Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 82 documents Report an error

NANDAKAM APARTMENT is a Residential/Group Housing project by SLV CONSTRUCTIONS in Vijayanagara, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1669/440/PR/080926/008918 on 8 Sep 2026. Possession is promised by 31 Dec 2030.

At a glance

Project

  • NameNANDAKAM APARTMENT
  • TypeResidential/Group Housing
  • Location
    • Hospet
    • Vijayanagara
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1669/440/PR/080926/008918
  • ReraGenie IDRG-KA-78869

Builder

  • NameSLV CONSTRUCTIONS
  • Entity typePartnership Firm
  • GSTIN29AFQFS6191H1Z6
  • Authorized SignatoryGuru Prasad S K
  • Other registrations1 more →

Key dates

this monthRegisteredSep 2026PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on8 Sep 2026
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Nandakam Aparment---24024

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 1 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 1 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
Gogga Gurusiddaiah--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.40 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 4.20 cr-
On-site expenditure-Salaries of workersRs 10.00 lakh-
Administrative CostsRs 6.00 lakh-
On-site expenditure-Consultants FeesRs 4.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectT V Srinivas
EngineerMandhadi Venkataramana Reddy
Chartered AccountantAnusha A Jain

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed82

As listed on the registration, under the names the promoter filed them with; the newest 80 of 82 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1669/440/PR/080926/008918 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
STRUTURAL ENGINEER LICENSEFile: Structural engineer license.pdf1 Sep 2026
STP DRAWINGFile: Nandakam STP.pdf1 Sep 2026
FIRM ITRFile: ACK712999770300726.pdf1 Aug 2026
BANK ACCOUNT CONFIRMATIONFile: Bank account confirmation.jpeg1 Aug 2026
FORM 1 CA CERTIFICATEFile: FORM 1 CERTIFICATE.pdf1 Aug 2026
BANK AFFIDAVITFile: Affidivate bank.pdf1 Aug 2026
SOURCE OF FUND CLARIFICATIONFile: Source of fund sln.pdf1 Aug 2026
TITLE DEEDFile: title deed.pdf1 Aug 2026
JDAFile: JDA SLV.pdf1 Aug 2026
CONVERSION ORDERFile: Conversion order clarificatio.pdf1 Aug 2026
EC FROM 01/04/2011 TO TILL DATEFile: EC.pdf1 Aug 2026
SURVEY SKETCHFile: Survey sketch.pdf1 Aug 2026
ORIGINAL SANCTIONED DRAWING DIGITAL SIGNED COPYFile: Building plan digital singed.pdf1 Aug 2026
COMMENCEMENT CERTIFICATE CLARIFICATIONFile: Commencement certificate clarification.pdf1 Aug 2026
VILLAGE MAPFile: Village map.pdf1 Aug 2026
REASON FOR DELAY IN REGISTRATIONFile: RESON FOR DELAY APPLICATIO.pdf1 Aug 2026
BROCHUREFile: SLV Apartment 2026.pdf1 Aug 2026
PLAN APPROVAL DIGITAL SIGNEDFile: Building plan approval digital singed.pdf1 Aug 2026
STRUCTURAL STABILITY CERTIFICATEFile: Structural stability certificate.pdf1 Aug 2026
LAND COST CALCULATION CLARIFICATIONFile: Land cost Calucalation.pdf1 Aug 2026
STP DRAWINGFile: STP drawing.pdf1 Aug 2026
GUIDANCE VALUEFile: Guidance Value.pdf1 Aug 2026
CDP MAP / MASTER PLANFile: CDP.pdf1 Aug 2026
WATER AND UGD NOCFile: Water and UGD NOC.pdf1 Aug 2026
SINGLE LAYOUTFile: Single layout plan.pdf1 Aug 2026
SALE DEEDFile: 1 Sale deed No 48791950.pdf1 Aug 2026
Registration CertificateFile: SVL - Udyam Certificate.pdf-
GST CertificateFile: SLV - GST Certificate.pdf-
Partnership DeedFile: Deed of Reconstitution Partnership.pdf-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: FORM 1 CERTIFICATE.pdf-
Certificate issued by Architect Form 2File: Form 5 Nandakam Apartment.pdf-
Certificate issued by Engineer Form 3File: Form 6 Nandakam Apartment.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: No Litigation Affidavit.pdf-
Balance Sheet 2024 - 2025File: Balancesheet - SLV Constructions.pdf-
Balance Sheet 2023 - 2024File: Balancesheet - SLV Constructions.pdf-
Balance Sheet 2022 - 2023File: Balancesheet - SLV Constructions.pdf-
Audited Profit and Loss Statement 2024 - 2025File: P and L - SLV Constructions.pdf-
Audited Profit and Loss Statement 2023 - 2024File: P and L - SLV Constructions.pdf-
Audited Profit and Loss Statement 2022 - 2023File: P and L - SLV Constructions.pdf-
Approved Letter-
Approved Sanction Plan-
Approved Sanction Plan-
Structural Stability Certificate-
Project specification-
Proforma of AOS-
Allotment Letter-
Form B Affidavit-
No Voilation Affidavit-
JDA Affidavit-
Legal Opinion-
GESCOM NOC-
Water NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Legal Opinion-
1 Sale deed No 4879-1950-
2 Sale Deed 1502-2022-23-
SLV - E Katha-
SLV - JDA_-
SLV - GPA_-
Site Layout Plan-
Tax_paid_Receipt_25-26-
Amenities Details-
Area Statement-
Comman Area Details-

How this compares with Vijayanagara

7%of Vijayanagara projects moved their completion datethis one has not
0%of Vijayanagara registrations are shown as withdrawn or revokedthis one is not

Computed across the 110+ Vijayanagara projects on ReraGenie, from their own filings.

Keep NANDAKAM APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Vijayanagara110+ in Vijayanagara

Builder: SLV CONSTRUCTIONS

SLV CONSTRUCTIONS has 2 registrations on RERA Karnataka, including SLV GARDENIA and NANDAKAM APARTMENT. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Vijayanagara district page.

Frequently asked questions

What are my rights if NANDAKAM APARTMENT is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of NANDAKAM APARTMENT?

The registered promoter entity is SLV CONSTRUCTIONS, a partnership firm as per the filing. Its GSTIN 29AFQFS6191H1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in NANDAKAM APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at NANDAKAM APARTMENT?

The professionals named in the filing: Architect: T V Srinivas; Engineer: Mandhadi Venkataramana Reddy; Chartered Accountant: Anusha A Jain. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in NANDAKAM APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About NANDAKAM APARTMENT. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save NANDAKAM APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.