Home / Browse projects / Bengaluru Urban, Karnataka / Mythri Serene
Mythri Serene
RG-KA-35124 · RERA PRM/KA/RERA/1251/308/PR/180426/008591 · Last updated on RERA Karnataka portal: 13 Apr 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Mythri Serene is a Residential/Group Housing project by Mythri Developers in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/180426/008591 on 18 Apr 2026. Possession is promised by 31 Dec 2028.
At a glance
Project
- NameMythri Serene
- TypeResidential/Group Housing
- Location
- Anekal
- Bengaluru Urban
- PincodeNot stated
- RERA no.PRM/KA/RERA/1251/308/PR/180426/008591
- ReraGenie IDRG-KA-35124
Builder
- NameMythri Developers
- Entity typePartnership Firm
- GSTIN29ABVFM7283K1Z5
- Authorized SignatoryMahender Reddy
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on18 Apr 2026
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings1 building record
- Documents filed122 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 1 | - | - | - | 32 | 0 | 32 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 13 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | - |
Progress on shared amenities40
As on 13 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | - |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Sewage Treatment Plant (STP) | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas | Yes | - |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Manya Tradelinks | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 10.63 cr | - |
| On-site expenditure-Site Overhead | Rs 96.51 lakh | - |
| Payment of cess | Rs 48.97 lakh | - |
| On-site expenditure-Consultants Fees | Rs 36.75 lakh | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 7.78 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Madamanchi Surendra Nadh |
| Engineer | Madamanchi Surendra Nadh |
| Chartered Accountant | Hanabe Nagarajarao Srinivasarao |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed122
As listed on the registration, under the names the promoter filed them with; the newest 80 of 122 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/180426/008591 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Bank statementFile: 1 30 STATEMENT.pdf | 13 Apr 2026 |
| Bank statementFile: 1 70 STATEMENT.pdf | 13 Apr 2026 |
| Bank statementFile: 1 100 STATEMENT.pdf | 13 Apr 2026 |
| CA certificateFile: 2 CA CERTIFICATE.pdf | 13 Apr 2026 |
| Bank AffidavitFile: 3 BANK AFFIDAVIT.pdf | 13 Apr 2026 |
| Source of fundFile: 4 SOURCE OF FUNDS.pdf | 13 Apr 2026 |
| Latitude and longitudeFile: 5 LAT AND LONGITUTE .jpeg | 13 Apr 2026 |
| AmenitiesFile: 7 AMENITIES.pdf | 13 Apr 2026 |
| Land cost calculation sheetFile: 9 LAND COST CALCULATION SHEET.pdf | 13 Apr 2026 |
| Signed Engineer certificateFile: 10 Engineer Certificate FORM 3.pdf | 13 Apr 2026 |
| Agreement of saleFile: 11 AGREEMENT OF SALE.pdf | 13 Apr 2026 |
| Allotment letterFile: 11 ALLOTMENT LETTER.pdf | 13 Apr 2026 |
| Guidance valueFile: 12 GUIDANCE VALUE.pdf | 13 Apr 2026 |
| Bank statementFile: 1 ACCOUNT PASS SHEET .jpeg | 23 Mar 2026 |
| Form 1File: 2 Form 1 CA.pdf | 23 Mar 2026 |
| Bank AffidavitFile: 3 BANK AFFIDAVIT.pdf | 23 Mar 2026 |
| Source of fundFile: 4 source of funds.pdf | 23 Mar 2026 |
| IT documentsFile: 5 IT DOCUMENTS.pdf | 23 Mar 2026 |
| MRFile: 6 MR.pdf | 23 Mar 2026 |
| ECFile: 7 EC.pdf | 23 Mar 2026 |
| Non litigation affidavitFile: 8 NON LITIGATION AFFI WITH SIG.pdf | 23 Mar 2026 |
| Form BFile: 9 FORM B.pdf | 23 Mar 2026 |
| Single plot layout planFile: 11 SINGLE PLOT LAYOUT PLAN .jpeg | 23 Mar 2026 |
| Plan approvalFile: 12 PLAN APPROVAL.pdf | 23 Mar 2026 |
| ADLR sketchFile: 13 ADLR.jpg | 23 Mar 2026 |
| Master PlanFile: 16 MASTER PLAN.jpg | 23 Mar 2026 |
| village mapFile: 17 village map 2.pdf | 23 Mar 2026 |
| village mapFile: 17 village map.pdf | 23 Mar 2026 |
| NOC KTCPFile: 18 NOC KTCP.pdf | 23 Mar 2026 |
| Delay for registrationFile: 20 DELAY FOR REGISTRAION.pdf | 23 Mar 2026 |
| Engineer certificateFile: 28 Engineer Certificate FORM 3.pdf | 23 Mar 2026 |
| Engineer certificateFile: 28 ENGINEER CERTIFICTE FORM 2.pdf | 23 Mar 2026 |
| structural stabilityFile: 29 STRUCTURAL STABILITY CERTIFICATE.pdf | 23 Mar 2026 |
| specificationFile: 30 SPECIFICATION.pdf | 23 Mar 2026 |
| Agreement for saleFile: 31 AGREEMENT FOR SALE MYTHRI SERENE.pdf | 23 Mar 2026 |
| Allotment letterFile: 32 Allotment Letter.pdf | 23 Mar 2026 |
| Notarised affidavitFile: 33 AFFIDAVIT NOTARISED 3 1.pdf | 23 Mar 2026 |
| STP drawingFile: 35 STP DRAWING.pdf | 23 Mar 2026 |
| guidance valueFile: 36 GUIDANCE VALUE.pdf | 23 Mar 2026 |
| Land cost calculationFile: 36 LAND COST CALCULATION.pdf | 23 Mar 2026 |
| Borewell supporting documentFile: 37 BOREWELL SUPPORTING DOCUMENT.pdf | 23 Mar 2026 |
| Declaration for borewellFile: 37 DECLARATION.pdf | 23 Mar 2026 |
| AffidavitFile: AFFIDAVIT DEVELOPER.pdf | 23 Mar 2026 |
| Bank statement of all 3 accountsFile: 1 ACCOUTN STATEMENT 1MB.pdf | 15 Feb 2026 |
| CA certificateFile: 2 CA.pdf | 15 Feb 2026 |
| Bank affidavitFile: 3 BANK AFFIDAVIT.pdf | 15 Feb 2026 |
| Profit and lossFile: 5 IT 1.pdf | 15 Feb 2026 |
| IT filingsFile: 5 IT.pdf | 15 Feb 2026 |
| Advovate search reportFile: 10 LEGAL.pdf | 15 Feb 2026 |
| planFile: 17 PLAN .jpeg | 15 Feb 2026 |
| planFile: 17 PLAN 1.jpeg | 15 Feb 2026 |
| PlanFile: 17 PLAN 2.jpeg | 15 Feb 2026 |
| planFile: 17 PLAN 3.jpeg | 15 Feb 2026 |
| commencement certificateFile: 18 COMMENCEMENT.pdf | 15 Feb 2026 |
| PCB NOCFile: 19 PCB.pdf | 15 Feb 2026 |
| PlanFile: 27 PLAN PDF.pdf | 15 Feb 2026 |
| Engineer certificateFile: 33 ENGIN CERTIFICATE.pdf | 15 Feb 2026 |
| structural stabilityFile: 34 STRUCTURAL STABILITY.pdf | 15 Feb 2026 |
| Allotment letterFile: 37 ALLOTMENT 3MB.pdf | 15 Feb 2026 |
| water NOCFile: 39 NOC WATER.pdf | 15 Feb 2026 |
| Project estimationFile: 40 PROJECT ESTIMATION.pdf | 15 Feb 2026 |
| Guidance valueFile: 42 GUIDANCE VALUE.pdf | 15 Feb 2026 |
| PlanFile: PLAN .jpg | 15 Feb 2026 |
| RTC, survey 447 | - |
| Mutation, survey 447 | - |
| Encumbrance Certificate, survey 447 | - |
| Conversion/Alienation Order, survey 447 | - |
| Sale/Title/Gift Deed, survey 447 | - |
| JDA, survey 447 | - |
| Khatha, survey 447 | - |
| Registration CertificateFile: PARTNERSHIP DEED MYTHRI .pdf | - |
| GST CertificateFile: GST CERTIFICATE MYTHRI.pdf | - |
| Partnership DeedFile: PARTNERSHIP DEED MYTHRI .pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Certificate issued by Architect Form 2File: 3 ARCHI CERTFICATE Form 2.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Mythri Serene on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Mythri Developers
Mythri Developers has 2 registrations on RERA Karnataka, including Mythri Serene and MYTHRI MITHILA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Mythri Serene is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Mythri Serene?
The registered promoter entity is Mythri Developers, a partnership firm as per the filing. Its GSTIN 29ABVFM7283K1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Mythri Serene?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Mythri Serene?
The professionals named in the filing: Architect: Madamanchi Surendra Nadh; Engineer: Madamanchi Surendra Nadh; Chartered Accountant: Hanabe Nagarajarao Srinivasarao. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Mythri Serene?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback