Home / Browse projects / Bengaluru Urban, Karnataka / Mythri Serene

Registration approved No litigation declared Residential/Group Housing project

Mythri Serene

By Mythri Developers

RG-KA-35124 · RERA PRM/KA/RERA/1251/308/PR/180426/008591 · Last updated on RERA Karnataka portal: 13 Apr 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2028Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 122 documents Report an error

Mythri Serene is a Residential/Group Housing project by Mythri Developers in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/180426/008591 on 18 Apr 2026. Possession is promised by 31 Dec 2028.

At a glance

Project

  • NameMythri Serene
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/308/PR/180426/008591
  • ReraGenie IDRG-KA-35124

Builder

  • NameMythri Developers
  • Entity typePartnership Firm
  • GSTIN29ABVFM7283K1Z5
  • Authorized SignatoryMahender Reddy
  • Other registrations1 more →

Key dates

this monthRegisteredApr 2026PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on18 Apr 2026
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed122 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
1---32032

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 13 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 13 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
Manya Tradelinks--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 12.53 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 10.63 cr-
On-site expenditure-Site OverheadRs 96.51 lakh-
Payment of cessRs 48.97 lakh-
On-site expenditure-Consultants FeesRs 36.75 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 7.78 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMadamanchi Surendra Nadh
EngineerMadamanchi Surendra Nadh
Chartered AccountantHanabe Nagarajarao Srinivasarao

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed122

As listed on the registration, under the names the promoter filed them with; the newest 80 of 122 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/180426/008591 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Bank statementFile: 1 30 STATEMENT.pdf13 Apr 2026
Bank statementFile: 1 70 STATEMENT.pdf13 Apr 2026
Bank statementFile: 1 100 STATEMENT.pdf13 Apr 2026
CA certificateFile: 2 CA CERTIFICATE.pdf13 Apr 2026
Bank AffidavitFile: 3 BANK AFFIDAVIT.pdf13 Apr 2026
Source of fundFile: 4 SOURCE OF FUNDS.pdf13 Apr 2026
Latitude and longitudeFile: 5 LAT AND LONGITUTE .jpeg13 Apr 2026
AmenitiesFile: 7 AMENITIES.pdf13 Apr 2026
Land cost calculation sheetFile: 9 LAND COST CALCULATION SHEET.pdf13 Apr 2026
Signed Engineer certificateFile: 10 Engineer Certificate FORM 3.pdf13 Apr 2026
Agreement of saleFile: 11 AGREEMENT OF SALE.pdf13 Apr 2026
Allotment letterFile: 11 ALLOTMENT LETTER.pdf13 Apr 2026
Guidance valueFile: 12 GUIDANCE VALUE.pdf13 Apr 2026
Bank statementFile: 1 ACCOUNT PASS SHEET .jpeg23 Mar 2026
Form 1File: 2 Form 1 CA.pdf23 Mar 2026
Bank AffidavitFile: 3 BANK AFFIDAVIT.pdf23 Mar 2026
Source of fundFile: 4 source of funds.pdf23 Mar 2026
IT documentsFile: 5 IT DOCUMENTS.pdf23 Mar 2026
MRFile: 6 MR.pdf23 Mar 2026
ECFile: 7 EC.pdf23 Mar 2026
Non litigation affidavitFile: 8 NON LITIGATION AFFI WITH SIG.pdf23 Mar 2026
Form BFile: 9 FORM B.pdf23 Mar 2026
Single plot layout planFile: 11 SINGLE PLOT LAYOUT PLAN .jpeg23 Mar 2026
Plan approvalFile: 12 PLAN APPROVAL.pdf23 Mar 2026
ADLR sketchFile: 13 ADLR.jpg23 Mar 2026
Master PlanFile: 16 MASTER PLAN.jpg23 Mar 2026
village mapFile: 17 village map 2.pdf23 Mar 2026
village mapFile: 17 village map.pdf23 Mar 2026
NOC KTCPFile: 18 NOC KTCP.pdf23 Mar 2026
Delay for registrationFile: 20 DELAY FOR REGISTRAION.pdf23 Mar 2026
Engineer certificateFile: 28 Engineer Certificate FORM 3.pdf23 Mar 2026
Engineer certificateFile: 28 ENGINEER CERTIFICTE FORM 2.pdf23 Mar 2026
structural stabilityFile: 29 STRUCTURAL STABILITY CERTIFICATE.pdf23 Mar 2026
specificationFile: 30 SPECIFICATION.pdf23 Mar 2026
Agreement for saleFile: 31 AGREEMENT FOR SALE MYTHRI SERENE.pdf23 Mar 2026
Allotment letterFile: 32 Allotment Letter.pdf23 Mar 2026
Notarised affidavitFile: 33 AFFIDAVIT NOTARISED 3 1.pdf23 Mar 2026
STP drawingFile: 35 STP DRAWING.pdf23 Mar 2026
guidance valueFile: 36 GUIDANCE VALUE.pdf23 Mar 2026
Land cost calculationFile: 36 LAND COST CALCULATION.pdf23 Mar 2026
Borewell supporting documentFile: 37 BOREWELL SUPPORTING DOCUMENT.pdf23 Mar 2026
Declaration for borewellFile: 37 DECLARATION.pdf23 Mar 2026
AffidavitFile: AFFIDAVIT DEVELOPER.pdf23 Mar 2026
Bank statement of all 3 accountsFile: 1 ACCOUTN STATEMENT 1MB.pdf15 Feb 2026
CA certificateFile: 2 CA.pdf15 Feb 2026
Bank affidavitFile: 3 BANK AFFIDAVIT.pdf15 Feb 2026
Profit and lossFile: 5 IT 1.pdf15 Feb 2026
IT filingsFile: 5 IT.pdf15 Feb 2026
Advovate search reportFile: 10 LEGAL.pdf15 Feb 2026
planFile: 17 PLAN .jpeg15 Feb 2026
planFile: 17 PLAN 1.jpeg15 Feb 2026
PlanFile: 17 PLAN 2.jpeg15 Feb 2026
planFile: 17 PLAN 3.jpeg15 Feb 2026
commencement certificateFile: 18 COMMENCEMENT.pdf15 Feb 2026
PCB NOCFile: 19 PCB.pdf15 Feb 2026
PlanFile: 27 PLAN PDF.pdf15 Feb 2026
Engineer certificateFile: 33 ENGIN CERTIFICATE.pdf15 Feb 2026
structural stabilityFile: 34 STRUCTURAL STABILITY.pdf15 Feb 2026
Allotment letterFile: 37 ALLOTMENT 3MB.pdf15 Feb 2026
water NOCFile: 39 NOC WATER.pdf15 Feb 2026
Project estimationFile: 40 PROJECT ESTIMATION.pdf15 Feb 2026
Guidance valueFile: 42 GUIDANCE VALUE.pdf15 Feb 2026
PlanFile: PLAN .jpg15 Feb 2026
RTC, survey 447-
Mutation, survey 447-
Encumbrance Certificate, survey 447-
Conversion/Alienation Order, survey 447-
Sale/Title/Gift Deed, survey 447-
JDA, survey 447-
Khatha, survey 447-
Registration CertificateFile: PARTNERSHIP DEED MYTHRI .pdf-
GST CertificateFile: GST CERTIFICATE MYTHRI.pdf-
Partnership DeedFile: PARTNERSHIP DEED MYTHRI .pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Partner Details-
Certificate issued by Architect Form 2File: 3 ARCHI CERTFICATE Form 2.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Mythri Serene on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: Mythri Developers

Mythri Developers has 2 registrations on RERA Karnataka, including Mythri Serene and MYTHRI MITHILA. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Mythri Serene is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Mythri Serene?

The registered promoter entity is Mythri Developers, a partnership firm as per the filing. Its GSTIN 29ABVFM7283K1Z5 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Mythri Serene?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Mythri Serene?

The professionals named in the filing: Architect: Madamanchi Surendra Nadh; Engineer: Madamanchi Surendra Nadh; Chartered Accountant: Hanabe Nagarajarao Srinivasarao. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mythri Serene?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mythri Serene. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mythri Serene to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.