ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / MULTI INFINATE

Registration approved Residential/Group Housing project

MULTI INFINATE

By M/s Multi Visions Pro

RG-KA-44671 · RERA PRM/KA/RERA/1251/309/PR/180605/001880

Source: official RERA Karnataka filing

Red flags

  • 1 complaint at RERA Karnataka
  • Completion date moved by 15 months
  • 2 extensions taken

Clear

  • Separate project account declared
Mar 2024Possession promisedmoved 15 months from the original
1Complaints at RERA Karnatakaon this registration
Jump to the 51 documents Report an error

MULTI INFINATE is a Residential/Group Housing project by M/s Multi Visions Pro in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/309/PR/180605/001880 on 5 Jun 2018. Possession is promised by 31 Mar 2024. The completion date has moved by 15 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMULTI INFINATE
  • TypeResidential/Group Housing
  • Location
    • Bengaluru North
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/309/PR/180605/001880
  • ReraGenie IDRG-KA-44671

Builder

  • NameM/s Multi Visions Pro
  • Entity typePartnership Firm
  • Authorized SignatoryMallikarjuna Reddy .Y
  • OthersNandini .Y

Key dates

this monthRegisteredJun 2018First promiseDec 2022Revised toMar 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on5 Jun 2018
  • Promised completion31 Mar 2024
  • Revised completionRevised to 31 Mar 2024 (originally 31 Dec 2022)
  • Buildings1 building record
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MULTI INFINATE---2550255

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsNoNot applicable
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingNoNot applicable
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,105 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 40.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s/Jeetu Pratibha& Associates
EngineerM/s Deshpande and Associates

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2022 → Sep 2023

No reason recorded in the filing

EX/PRM/KA/RERA/1251/309/PR/231031/001880Sep 2023 → Mar 2024

Reason as filed by the promoterothers

Complaints filed with RERA Karnataka1

Case no.ComplainantRespondentFiled
CMP/210922/0008368-M/s Multi Visions Pro22/09/2021

Documents filed51

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/309/PR/180605/001880 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Registration_certificate.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Arc certificate work completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Engg certificate work completed.pdf-
CA Certificate for Funds UtilizationFile: CA certificate Fund utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Arc certificate work pending.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Engg certificate work pending.pdf-
CA Certificate for Funds required for Project CompletionFile: CA certificate Funds required.pdf-
AffidavitFile: Affidavit.pdf-
Details Of Sold/ Un-sold UnitsFile: Sold Unsold Details for Extension of project.xlsx-
Document 1File: Commencement Certificate.pdf-
Document 2File: EC 2004 to 2023.pdf-
Document 3File: Project Extension Form B.pdf-
Document 4File: KSPCB NOC.pdf-
Document 5File: SEIAA NOC.pdf-
CC-
Typical Building Plan-
Development_CDP_Plan-
18_ Proforma_of_Sale_Deed-
Proforma_of_sale_agreement-
Sale deed & RTC-
Typical Building Plan-
Typical Building Plan-
13_Profoma_Allotment_Letter-
14_Specifications-
EC-
Khatha-
JDA New-
Conversion_Certificate-
Sanction Plan-
Sanction Plan-
Conversion_Certificate-
Balance Sheet 2016 - 2017File: ITR.pdf-
Balance Sheet 2015 - 2016File: ITR.pdf-
Balance Sheet 2014 - 2015File: Financial 5-5-2018.pdf-
Audited Profit and Loss Statement 2016 - 2017File: P&L Statement.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P&L Statement.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Financial 5-5-2018.pdf-
Director's Report 2016 - 2017File: ITR.pdf-
Director's Report 2015 - 2016File: ITR.pdf-
Director's Report 2014 - 2015File: Financial 5-5-2018.pdf-
Cash Flow Statement 2016 - 2017File: P&L Statement.pdf-
Cash Flow Statement 2015 - 2016File: ITR.pdf-
Auditor's Report 2016 - 2017File: ITR.pdf-
Auditor's Report 2015 - 2016File: P&L Statement.pdf-
Auditor's Report 2014 - 2015File: Financial 5-5-2018.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: Financial 5-5-2018.pdf-
17_ Form B Declaration-
Prospectus/BrochureFile: Multi Infinate Brochure.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1251_309_PR_180605_001880 (1).xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 15 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep MULTI INFINATE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmMULTI INFINATEOther 19Dot size: filed unitsN

Filed coordinates, straight-line distance. 19 registered projects within 2 km.

Builder: M/s Multi Visions Pro

M/s Multi Visions Pro has 1 registration on RERA Karnataka, including MULTI INFINATE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if MULTI INFINATE is delayed beyond 31 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MULTI INFINATE?

The registered promoter entity is M/s Multi Visions Pro, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MULTI INFINATE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MULTI INFINATE?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at MULTI INFINATE?

The professionals named in the filing: Architect: M/s/Jeetu Pratibha& Associates; Engineer: M/s Deshpande and Associates. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MULTI INFINATE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MULTI INFINATE. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MULTI INFINATE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.