Registration approved Residential/Group Housing project

MPN Green Storeys

By M PURUSHOTHAM

RG-KA-85797 · RERA PRM/KA/RERA/1251/308/PR/180905/001984

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 21 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Sep 2023Possession promisedmoved 21 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 46 documents Report an error

MPN Green Storeys is a Residential/Group Housing project by M PURUSHOTHAM in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/180905/001984 on 5 Sep 2018. Possession is promised by 30 Sep 2023. The completion date has moved by 21 months from the original filing.

At a glance

Project

  • NameMPN Green Storeys
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/180905/001984
  • ReraGenie IDRG-KA-85797

Builder

  • NameM PURUSHOTHAM

Key dates

this monthRegisteredSep 2018First promiseDec 2021Revised toSep 2023

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on5 Sep 2018
  • Promised completion30 Sep 2023
  • Revised completionRevised to 30 Sep 2023 (originally 31 Dec 2021)
  • Buildings2 building records
  • Documents filed46 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOCK-1---62062
BLOCK-2---73073

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)Not applicable
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityNoNot applicable
Swimming PoolYes-
GymNoNot applicable
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,864 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 57.00 cr

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2021 → Sep 2022

No reason recorded in the filing

EX/PRM/KA/RERA/1251/308/PR/230606/001984Sep 2022 → Sep 2023

Reason as filed by the promoterDelay in getting loan

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed46

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/180905/001984 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect Certificate for Work Completion Schedule till DateFile: Form-Ex1 AC for Work as on date (1).pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Form Ex5 Engineer Certificate for status of work as on date .pdf-
CA Certificate for Funds UtilizationFile: Form-Ex3 CA Fund Utilization Cert.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Form-Ex2 AC for Pending Work as on date (1).pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Form Ex6 Engineer Certificate for pending work as on date.pdf-
CA Certificate for Funds required for Project CompletionFile: Form-Ex4 CA Funds equired.pdf-
AffidavitFile: Form Ex7 Affidavit for seeking Ext of Reg.pdf-
Latest Encumbrance CertificateFile: Latest EC.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: Form-B Declararation, supported by an affi .pdf-
Anekal_Planning_authority_CC_April_05_2018-
Approved BuildingPlotting Plan-
Approved_Layout_Plan-
ABSOLUTE SALE DEED- MPN-
Agreement for Sale -MPN-
Sale_Deed & RTC-
Approved_Section_of_Building-
Area_Development_Plan-
Allotment Letter-
MPN_Brochure_R1-
Project_Specification-
EC_survey_No-44-
Katha-
Joint_Development_Agreement-
Existing Layout Plan-
Existing Section Plan and Specification-
Change_of_land_Use-
Balance Sheet 2016 - 2017File: Balance_sheet_2017.pdf-
Balance Sheet 2015 - 2016File: Balance_sheet_2016.pdf-
Balance Sheet 2014 - 2015File: Balance_sheet_2015.pdf-
Audited Profit and Loss Statement 2016 - 2017File: Profit and Loss Statement_2017.pdf-
Audited Profit and Loss Statement 2015 - 2016File: Profit and Loss Statement_2016.pdf-
Audited Profit and Loss Statement 2014 - 2015File: Profit and Loss Statement_2015.pdf-
Director's Report 2016 - 2017File: Direcotrs Report_2017.pdf-
Director's Report 2015 - 2016File: Directors Report_2016.pdf-
Director's Report 2014 - 2015File: Directors Report_2015.pdf-
Cash Flow Statement 2016 - 2017File: Cash Flow Statement_2017.pdf-
Cash Flow Statement 2015 - 2016File: Cash Flow Statement_2016.pdf-
Auditor's Report 2016 - 2017File: Auditors Report_2017.pdf-
Auditor's Report 2015 - 2016File: Auditors Report_2016.pdf-
Auditor's Report 2014 - 2015File: Auditor's Report_2015.pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR_2017.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: ITR_2016.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: ITR1_2015.pdf-
Form B-
Tower Excel SheetFile: PRM_KA_RERA_1251_308_PR_180905_001984 (1).xlsx-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 21 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep MPN Green Storeys on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmMPN Green StoreysOther 63Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: M PURUSHOTHAM

M PURUSHOTHAM has 1 registration on RERA Karnataka, including MPN Green Storeys. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if MPN Green Storeys is delayed beyond 30 Sep 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MPN Green Storeys?

The registered promoter entity is M PURUSHOTHAM. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MPN Green Storeys?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

What should I check before booking in MPN Green Storeys?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MPN Green Storeys. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MPN Green Storeys to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.