MORYA HEIGHTS
By MORYA INFRACONSTRUCT PRIVATE LIMITED
RG-MH-11413 · RERA P51700005511 · Last updated on MahaRERA portal: 27 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 23 complaints at MahaRERA
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 4 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MORYA HEIGHTS is a Residential / Group Housing project by MORYA INFRACONSTRUCT PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700005511 on 11 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 36 months from the original filing. 173 of the 255 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 23 complaints are on record with the regulator.
At a glance
Project
- NameMORYA HEIGHTS
- TypeResidential / Group Housing
- Location
- GREEN ROAD
- HAJURI
- Thane (M Corp.)
- Thane
- 400604
- Pincode400604
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700005511
- ReraGenie IDRG-MH-11413
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Aug 2017
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed162 files
Current status
Figures as on 27 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MORYA HEIGHTS REHAB 2 | NA | 23 | 23 | 240 | 15 | 255 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 0%.
MORYA HEIGHTS REHAB 2: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 27 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed132
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| MORYA HEIGHTS REHAB 2 | NA | Rs 22.50 cr | Rs 18.95 cr |
| - | NA | Rs 22.50 cr | Rs 18.95 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shrushti architectural design consultancy |
| Engineer | Ajay mahale |
| Chartered Accountant | Y J Padhye & Co |
| Chartered Accountant | Mohandas & Co. |
| Partner | Role in project |
|---|---|
| MORYA INFRACONSTRUCT PRIVATE LIMITED | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1.The allottees of the project have already paid significant amount of consideration towards their respective flats in the project. To secure their funds and to deliver their flats, it is necessary to have the MahaRERA project registration extension certificate granted. 2.One of the major requirements for the allottees to register their agreement for sale and pay the stamp duty to the government is a valid MahaRERA Project Registration Certificate without which their agreement cannot be registered and the project cannot receive their payments which will lead to further delay and hardships to t
Reason as filed by the promoterWe apologize for the delay in the completion of the project. The construction was delayed mainly due to COVID, which severely impacted on the real estate sector. Medium-scale developers like Morya Infraconstruct Private Limited faced a liquidity crunch as flat sales remained stagnant for a long period and demand declined due to unemployment and recession. Despite these challenges, we successfully completed Rehab Tower-1 (SRA building) and handed over possession to 130 tenants. The building plans were revised in January 2024, and approval for additional floors on both SRA towers was granted by
Complaints filed with MahaRERA23
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000056321 | Anant Gopal Joshi/ Sudha Anant Joshi/ Kalyani P Kelkar | Shashank Parab | 12/10/2018 |
| CC006000000192623 | Mr Anish Suresh Rane | Morya Infraconstruct Pvt Ltd | 12/01/2021 |
| CC006000000012200 | Sameer Chandso Mahaldar | Shashank Parab , Ganesh Parab | 08/12/2017 |
| CC006000000012111 | SIDDHESH RAMESH SURVE | MORYA INFRACONSTRUCT PVT.LTD. | 11/12/2017 |
| CC006000000022837 | Sheela Johney Kharat | Morya Infraconstruct Private Limited | 10/01/2018 |
| CC006000000023321 | Sanjita Keshav Vangule | Shashank Parab, Ganesh Parab, Sudhir Sawant | 16/02/2018 |
| CC006000000056830 | RAJENDRAKUMAR TAKLE | MORYA INFRACONSTRUCT PRIVATE LIMITED | 02/11/2018 |
| CC006000000196846 | Madhu Uday Hiraskar | M/s Morya Infraconstruct Pvt. Ltd. | 27/04/2021 |
| CC006000000192178 | VIDYA DINESH YADAV | SHASHANK PARAB | 15/01/2020 |
| CC006000000197318 | POOJA PARESH GHARAT | MORYA INFRACONSTRUCT PRIVATE LIMITED | 18/06/2021 |
| CC006000000198806 | LEELABEN PANCHAL K PANCHAL | M/S MORYA INFRASTRUCT PVT LTD | 25/10/2021 |
| CC006000000198808 | CHANDRAKANT K PANCHAL | M/S MORYA INFRASTRUCT PVT LTD | 25/10/2021 |
| CC006000000220695 | ASHOKKUMAR NARAYAN CHINTAKINDI | Morya Infraconstruct Private Limited | 05/04/2022 |
| CC006000000397920 | Kedar Shrikrishna Kelkar | Morya Infraconstruct Private limited | 13/11/2023 |
| CC006000000408149 | Tushar Shrikrishna Kelkar | Morya Infraconstruct Private Limited | 13/11/2023 |
| CC006000000480358 | Saurabh Ramdas Gupta | Shashank Balkrishna Parab | 22/06/2024 |
| CC12500160 | SUMIT KALIKRISHNA BHATTACHARYA | MORYA INFRACONSTRUCT PRIVATE LIMITED | 17/01/2025 |
| CC12501583 | Ashwini Sanjay Shelke | MORYA INFRACONSTRUCT PRIVATE LIMITED | 14/05/2025 |
| CC12502193 | Sachin Anant Bhuwad | MORYA INFRACONSTRUCT PRIVATE LIMITED | 02/07/2025 |
| CC12503771 | Alok Suresh Jagade | MORYA INFRACONSTRUCT PRIVATE LIMITED | 29/10/2025 |
| CC12600759 | Vinal Pardhi | MORYA INFRACONSTRUCT PRIVATE LIMITED | 10/02/2026 |
| CC12603698 | Shital Vaibhav Sankhe | MORYA INFRACONSTRUCT PRIVATE LIMITED | 15/06/2026 |
| CC12604850 | SONAL SANDEEP SEMLANI | MORYA INFRACONSTRUCT PRIVATE LIMITED | 01/08/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Feb 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Jan 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed162
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 162 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: From 1 - Dec 2025.pdf | 27 Feb 2026 |
| Withdrawal Update Form 2File: 2) Engineer Certificate Q I Fy 2023-24 (1).pdf | 27 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - Dec 2025.pdf | 27 Feb 2026 |
| Withdrawal Update Form 1File: Architect Certificate 14th Floor (1) (1).pdf | 3 Feb 2026 |
| Withdrawal Update Form 1File: Architect Certificate 14th Floor (1) (1).pdf | 3 Feb 2026 |
| Withdrawal Update Form 1File: Architect Certificate 14th Floor (1) (1).pdf | 3 Feb 2026 |
| Withdrawal Update Form 1File: Architect Certificate 14th Floor (1) (1).pdf | 3 Feb 2026 |
| Withdrawal Update Form 1File: Architect Certificate 14th Floor (1) (1).pdf | 3 Feb 2026 |
| Withdrawal Update Form 2File: 2) Engineer Certificate Q I Fy 2023-24 (1).pdf | 3 Feb 2026 |
| Withdrawal Update Form 2File: 2) Engineer Certificate Q I Fy 2023-24 (1).pdf | 3 Feb 2026 |
| Withdrawal Update Form 2File: 2) Engineer Certificate Q I Fy 2023-24 (1).pdf | 3 Feb 2026 |
| Withdrawal Update Form 2File: 2) Engineer Certificate Q I Fy 2023-24 (1).pdf | 3 Feb 2026 |
| Withdrawal Update Form 2File: 2) Engineer Certificate Q I Fy 2023-24 (1).pdf | 3 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate MH.pdf | 3 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate MH.pdf | 3 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate MH.pdf | 3 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate MH.pdf | 3 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate MH.pdf | 3 Feb 2026 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED DISCLOSURE 2 - converted.pdf | 25 Feb 2025 |
| Layout approvalFile: MYSCAN_20250221_0006 - converted.pdf | 21 Feb 2025 |
| Layout approvalFile: MYSCAN_20250221_0007 - converted.pdf | 21 Feb 2025 |
| Layout approvalFile: MYSCAN_20250221_0008 - converted.pdf | 21 Feb 2025 |
| Layout approvalFile: MYSCAN_20250221_0009 - converted.pdf | 21 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20250221_0006 - converted.pdf | 21 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20250221_0007 - converted.pdf | 21 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20250221_0008 - converted.pdf | 21 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20250221_0009 - converted.pdf | 21 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Morya Heights R1 R2 CC.pdf | 21 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QIV - FY 2022-23 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf | 6 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QI - FY 2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf | 6 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q II - FY 2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf | 6 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QIII - FY 2023-24 - ARCHITECT CERTIFICATE OF R1 BUILDING.pdf | 6 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q IV - FY-2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf | 6 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QI - FY 2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf | 6 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q-II FY-2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf | 6 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QIII - FY 2024-25 - ARCHITECT CERTIFICATE OF R2 BUILDING 01.pdf | 6 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QIII - FY 2024-25 - ARCHITECT CERTIFICATE OF R2 BUILDING.pdf | 6 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QIII - FY 2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf | 6 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QI - FY 2024-25 - ARCHITECT CERTIFICATE OF R1 BUILDING.pdf | 6 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QI - FY 2024-25 - ARCHITECT CERTIFICATE OF R2 BUILDING.pdf | 6 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QIII - FY 2024-25 - ARCHITECT CERTIFICATE OF R2 BUILDING.pdf | 6 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 06) 20012025 ENGINEERs CERTIFICATE.pdf | 6 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5) 30092024 ENGINEER’S CERTIFICATE.pdf | 6 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 4) 30062024 ENGINEER’S CERTIFICATE.pdf | 6 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3) 31032024 ENGINEER’S CERTIFICATE.pdf | 6 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2) 31122023 ENGINEER’S CERTIFICATE.pdf | 6 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1) 30092023 ENGINEER’S CERTIFICATE.pdf | 6 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 06) 31-12-2024 Quality Assurance Certificate.pdf | 6 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 06) 31-12-2024 Quality Assurance Certificate.pdf | 6 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 05) 30-09-2024 Quality Assurance Certificate.pdf | 6 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 04) 30-06-2024 Quality Assurance Certificate.pdf | 6 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 03) 31-03-2024 Quality Assurance Certificate.pdf | 6 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 02) 31-12-2023 Quality Assurance Certificate.pdf | 6 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 01) 30-09-2023 Quality Assurance Certificate.pdf | 6 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 1) 30092023 ENGINEER’S CERTIFICATE.pdf | 6 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 MORYA HEIGHTS.pdf | 30 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 MORYA HEIGHTS.pdf | 30 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 MORYA HEIGHTS.pdf | 30 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 MORYA HEIGHTS.pdf | 30 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 MORYA HEIGHTS.pdf | 30 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 MORYA HEIGHTS.pdf | 30 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 MORYA HEIGHTS.pdf | 30 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QI - FY 2024-25 - ARCHITECT CERTIFICATE OF R1 BUILDING.pdf | 29 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q-II FY-2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf | 29 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q-II FY-2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf | 29 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QI - FY 2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf | 29 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q II - FY 2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf | 29 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QIII - FY 2023-24 - ARCHITECT CERTIFICATE OF R1 BUILDING.pdf | 29 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Q IV - FY-2023-24 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf | 29 Jan 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: QIII - FY 2024-25 - ARCHITECT CERTIFICATE OF SALE BUILDING.pdf | 29 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: declaration about separate bank Account for real Estate.pdf | 29 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 01) 30-09-2023 Quality Assurance Certificate QII FY 2023-24.pdf | 29 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 05) 30-09-2024 Quality Assurance Certificate QII - FY 2024-25.pdf | 29 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 04) 30-06-2024 Quality Assurance Certificate QI - FY 2024-25.pdf | 29 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 03) 31-03-2024 Quality Assurance Certificate QIV - FY 2023-24.pdf | 29 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 02) 31-12-2023 Quality Assurance Certificate QIII - FY 2023-24.pdf | 29 Jan 2025 |
| Declaration in FORM BFile: Adobe Scan Dec 13, 2024 (1).pdf | 18 Jan 2025 |
| Declaration in FORM BFile: Adobe Scan Dec 13, 2024 (2).pdf | 18 Jan 2025 |
| Layout approvalFile: scan0165-compressed.pdf | 14 Jan 2025 |
| Layout approvalFile: scan0164-compressed.pdf | 14 Jan 2025 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| MORYA NIWAS | LAXMI WADI KUDAL SIDHUDURG DISTRICT | 27 | Completed | Sep 2017 | Jul 2017 |
| MORYA SANKUL | VENGURLA CAMP VENGURLA SIDHUDURG | 40 | Completed | Mar 2017 | Feb 2017 |
| MORYA RESIDENCY | TEMBDHURI NAGAR PINGULI KUDAL | 86 | Completed | Mar 2016 | Feb 2016 |
| MORYA GREEN ACRES | MULDE KUDAL SIDHUDURG | - | Completed | Mar 2015 | Apr 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 162 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MORYA HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near HAJURI7,600+ in Thane
Filed coordinates, straight-line distance. 309 registered projects within 2 km.
Dosti 604
Dosti Corporation Business Park
ONE ARTHASYA
TOP FLOOR REALTY LLP
ASHAR MERAC PHASE I
AJAY PRATAP ASHAR
EMPERIA I PARK
MANOMETER (INDIA) LLP
Ace Signature IT Park
Yojit Builder
O22 Business Park
MIDAS TOUCH
See every Thane project, with the district possession charts
Builder: MORYA INFRACONSTRUCT PRIVATE LIMITED
MORYA INFRACONSTRUCT PRIVATE LIMITED has 4 registrations on MahaRERA, including MORYA BUSINESS PLAZA and MORYA HEIGHTS. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if MORYA HEIGHTS is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MORYA HEIGHTS?
The registered promoter entity is MORYA INFRACONSTRUCT PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MORYA HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against MORYA HEIGHTS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for MORYA HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MORYA HEIGHTS?
The professionals named in the filing: Architect: Shrushti architectural design consultancy; Engineer: Ajay mahale; Chartered Accountant: Y J Padhye & Co; Chartered Accountant: Mohandas & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MORYA HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback