ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / MJR Clique - Hydra

Registration approved Residential/Group Housing project

MJR Clique - Hydra

By MJR BUILDERS PRIVATE LIMITED

RG-KA-31072 · RERA PRM/KA/RERA/1251/310/PR/171028/000684

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2018Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 40 documents Report an error

MJR Clique - Hydra is a Residential/Group Housing project by MJR BUILDERS PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171028/000684 on 28 Oct 2017. Possession is promised by 31 Dec 2018.

At a glance

Project

  • NameMJR Clique - Hydra
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1251/310/PR/171028/000684
  • ReraGenie IDRG-KA-31072

Builder

  • NameMJR BUILDERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45209KA2011PTC057125
  • Authorized SignatoryS JAYARAM REDDY
  • Other registrations1 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2017PromisedDec 2018

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on28 Oct 2017
  • Promised completion31 Dec 2018
  • Revised completionNone
  • Buildings5 building records
  • Documents filed40 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---70070
B---56056
C---52052
D---56056
E---70070

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation workNot applicable
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area15,479 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 75.78 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDSP Design Architects Pvt Ltd
EngineerAnagha Engineering Consultants

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed40

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171028/000684 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CertificateFile: Incorporation certificate.jpg-
CC Hydra-
Hydra- Approved Plan-
MJR-
Sale deed draft- Hydra-
Sale Agreement_hydra-
Land Documents1-
Approved Section Plan -Hydra-
Area Development Hydra-
MJR Clique Hydra - Allotment Letter-
MJR Clique - Hydra -E-Brochure-
NOC hydra-
MJR Clique -Hydra Specifications-
EC-Hydra- April 2017 to August 2017-
katha-Hydra-
Balance Sheet 2015 - 2016File: Balancesheet 15-16.pdf-
Balance Sheet 2014 - 2015File: Balance sheet 14-15.pdf-
Balance Sheet 2013 - 2014File: Balancesheet 13-14.pdf-
Audited Profit and Loss Statement 2015 - 2016File: P & L Account 15-16.pdf-
Audited Profit and Loss Statement 2014 - 2015File: P & L Account 14-15.pdf-
Audited Profit and Loss Statement 2013 - 2014File: P & L 13-14.pdf-
Director's Report 2015 - 2016File: Directors report 15-16.pdf-
Director's Report 2014 - 2015File: Directors Report 14 -15.pdf-
Director's Report 2013 - 2014File: Director Report 13-14.pdf-
Cash Flow Statement 2015 - 2016File: CASH FLOW 15-16.pdf-
Cash Flow Statement 2014 - 2015File: CASHFLOW 14-15.pdf-
Auditor's Report 2015 - 2016File: Auditor Report 15-16.pdf-
Auditor's Report 2014 - 2015File: Audit Report 14-15.pdf-
Auditor's Report 2013 - 2014File: Audit Report 13-14.pdf-
Income Tax Return Acknowledgement 2015 - 2016File: Income Tax Return - 15-16.pdf-
Income Tax Return Acknowledgement 2014 - 2015File: Income Tax Return 14-15.pdf-
Income Tax Return Acknowledgement 2013 - 2014File: Incometax return 13-14.pdf-
Form B Decleration-
Prospectus/BrochureFile: MJR Clique - Hydra -E-Brochure.pdf-
Advertisement Copy 1File: MJR Clique - Hydra -E-Brochure.pdf-
Tower Excel SheetFile: Copy of PRM_KA_RERA_1251_310_PR_171028_000684-3.xlsx-
Occupancy CertificateFile: OC - Hydra.pdf-
Completion certificateFile: COMPLETATION CERTIFICATE- HYDRA.pdf-
Registered Agreement of SaleFile: Sale Agreement.pdf-
Registered conveyance deed for an individual unitFile: Sale Deed.pdf-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
MJR Platina-CompletedAug 2017No date filed
MJR Pearl-CompletedAug 2017No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep MJR Clique - Hydra on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

Builder: MJR BUILDERS PRIVATE LIMITED

MJR Builders Private Limited has 2 registrations on RERA Karnataka, including MJR Opus and MJR Clique - Hydra. Its filings declare 2 earlier projects, 2 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if MJR Clique - Hydra is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of MJR Clique - Hydra?

The registered promoter entity is MJR BUILDERS PRIVATE LIMITED, a company as per the filing. Its CIN U45209KA2011PTC057125 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in MJR Clique - Hydra?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at MJR Clique - Hydra?

The professionals named in the filing: Architect: DSP Design Architects Pvt Ltd; Engineer: Anagha Engineering Consultants. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MJR Clique - Hydra?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MJR Clique - Hydra. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MJR Clique - Hydra to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.