MILAN MILAP CO OP HOUSING SOCIETY LTD
By MILAN MILAP CO OP HOUSING SOCIETY LIMITED
RG-MH-85244 · RERA P51800047599 · Last updated on MahaRERA portal: 15 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
MILAN MILAP CO OP HOUSING SOCIETY LTD is a Others project by MILAN MILAP CO OP HOUSING SOCIETY LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047599 on 14 Nov 2022. Possession is promised by 31 Dec 2026.
At a glance
Project
- NameMILAN MILAP CO OP HOUSING SOCIETY LTD
- TypeOthers
- Location
- GARODIA NAGAR
- 90 FFET
- GHATKOPAR EAST
- Kurla
- Mumbai Suburban
- 400077
- Pincode400077
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800047599
- ReraGenie IDRG-MH-85244
Builder
- NameMILAN MILAP CO OP HOUSING SOCIETY LIMITED
- Entity typeSociety
- ChairpersonRAJESH AJMERA
- SecretoryRAVINDRA SANGHRAJKA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Nov 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed53 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| MILAN MILAP CO OP HOUSING SOCIETY LIMITED | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.
MILAN MILAP CO OP HOUSING SOCIETY LIMITED: 56% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 80% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 40% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities17
As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
| SOCIETY OFFICE | Yes | 0% |
| FITNESS CENTER | Yes | 0% |
Parking filed50
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| MILAN MILAP CO OP HOUSING SOCIETY LTD | Kurla | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KALPESH MANAHARLAL MEHTA |
| Engineer | BAKULESH J MEHTA |
| Chartered Accountant | B D K & ASSOCIATES |
| Partner | Role in project |
|---|---|
| MILAN MILAP CO OP HOUSING SOCIETY LIMITED | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Sep 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed53
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1.pdf | 15 Jul 2026 |
| Form 2File: FORM2.pdf | 15 Jul 2026 |
| Form 3File: FORM 3..pdf | 15 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: inventory.pdf | 15 Jul 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3.pdf | 20 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 SIGNED.pdf | 30 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archtect Certificate MAR.pdf | 5 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATEOCT-DEC23.pdf | 5 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTICICATE JAN TO MAR24.pdf | 5 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTICICATE APR-JUNE24.pdf | 5 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTICICATE JULY-SEP24.pdf | 5 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT MAR .pdf | 5 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT APR -JUNE24.pdf | 5 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: SITE SUPERVISORS CERT MAR-24.pdf | 5 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SITE SUPERVISORS CERT MAR-24.pdf | 5 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archtect Certificate 07-11-2023.pdf | 19 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archtect Certificate 10-07-2023.pdf | 19 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT 10-07-23.pdf | 19 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT 07-11-23.pdf | 19 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SITE SUPERVISORS CERT 10-07-23.pdf | 19 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (APR-JUINE 23).pdf | 19 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (JULY-SEP 23).pdf | 19 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_ RERA Milan Milap.pdf | 30 Sep 2023 |
| Building plan approvalFile: Amend IOD plan 20-12-2022_ Compressed.pdf | 26 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Amend IOD plan 20-12-2022_ Compressed.pdf | 26 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf | 26 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archtect Certificate 12-01-2023 (1).pdf | 24 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER 2.pdf | 24 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ENGINEERS CERTIFICATE-2.pdf | 24 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE - correction.pdf | 24 Jan 2023 |
| Building plan approvalFile: IOD Drawing 31-01-2022 Highlighted (1) (1) (1) GRAY COMPACT_compressed.pdf | 21 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD Drawing 31-01-2022 Highlighted (1) (1) (1) GRAY COMPACT_compressed.pdf | 21 Oct 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A FINAL.pdf | 21 Oct 2022 |
| Declaration in FORM BFile: Form B stamp paper revised_compressed.pdf | 10 Oct 2022 |
| Layout approvalFile: LAYOUT.pdf | 21 Sep 2022 |
| Building plan approvalFile: Drawing autodcr - clr comp.pdf | 21 Sep 2022 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 21 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Drawing autodcr - clr comp.pdf | 21 Sep 2022 |
| Proforma of Allotment letterFile: Rera Allotment letter revised signed draft.pdf | 20 Sep 2022 |
| Proforma of Agreement for saleFile: AFS_merged.pdf | 20 Sep 2022 |
| Deviation Report with respect to Allotment letterFile: DEVIATION LETTER OF ALLOTMENT LETTER FINAL dated.pdf | 20 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE WITH SIGN COMPRESSED.pdf | 19 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT AGREEMENT.pdf | 19 Sep 2022 |
| PAN CardFile: pan card.pdf | 8 Jul 2022 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf | 8 Jul 2022 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCES CERTIFICATE LATEST signed.pdf | 8 Jul 2022 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCES CERTIFICATE LATEST signed.pdf | 8 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_FirstCC_signed.pdf | 8 Jul 2022 |
| Declaration about Commencement CertificateFile: DECLARATION OF CC.pdf | 8 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archtect Certificare (At a time of Registration)_compressed.pdf | 8 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE_compressed.pdf | 8 Jul 2022 |
| CERSAI detailsFile: CERSAI MERGED.pdf | 8 Jul 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: MM RERA Account detail.pdf | 8 Jul 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 53 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep MILAN MILAP CO OP HOUSING SOCIETY LTD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GHATKOPAR EAST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 355 registered projects within 2 km.
Mahindra Rainforest Phase 1
Anthurium Developers Limited
Mahindra Rainforest Phase 2
Anthurium Developers Limited
CRYSTAL PRIME MERIDIAN
ARYAMAAN DEVELOPERS PRIVATE LIMITED
AARADHYA ONEPARK
MICL CREATORS LLP
CENTRONA ZEN-A
ELEVATED AVENUE REALTY LLP
CENTRONA ZEN-B
ELEVATED AVENUE REALTY LLP
See every Mumbai Suburban project, with the district possession charts
Builder: MILAN MILAP CO OP HOUSING SOCIETY LIMITED
MILAN MILAP CO OP HOUSING SOCIETY LIMITED has 1 registration on MahaRERA, including MILAN MILAP CO OP HOUSING SOCIETY LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if MILAN MILAP CO OP HOUSING SOCIETY LTD is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of MILAN MILAP CO OP HOUSING SOCIETY LTD?
The registered promoter entity is MILAN MILAP CO OP HOUSING SOCIETY LIMITED, a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in MILAN MILAP CO OP HOUSING SOCIETY LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for MILAN MILAP CO OP HOUSING SOCIETY LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at MILAN MILAP CO OP HOUSING SOCIETY LTD?
The professionals named in the filing: Architect: KALPESH MANAHARLAL MEHTA; Engineer: BAKULESH J MEHTA; Chartered Accountant: B D K & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in MILAN MILAP CO OP HOUSING SOCIETY LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback