Registration approved Residential/Group Housing project

Meda Heights

By Meda Constructions

RG-KA-79634 · RERA PRM/KA/RERA/1251/446/PR/200515/003403 · Last updated on RERA Karnataka portal: 12 Mar 2020

Source: official RERA Karnataka filing

Red flags

  • 4 complaints at RERA Karnataka
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • Separate project account declared
Sep 2024Possession promisedmoved 9 months from the original
4Complaints at RERA Karnatakaon this registration
Jump to the 92 documents Report an error

Meda Heights is a Residential/Group Housing project by Meda Constructions in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/446/PR/200515/003403 on 15 May 2020. Possession is promised by 29 Sep 2024. The completion date has moved by 9 months from the original filing. 4 complaints are on record with the regulator.

At a glance

Project

  • NameMeda Heights
  • TypeResidential/Group Housing
  • Location
    • Bengaluru East
    • Bengaluru Urban
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/446/PR/200515/003403
  • ReraGenie IDRG-KA-79634

Builder

  • NameMeda Constructions
  • Entity typePartnership Firm
  • Authorized SignatoryM Raghunadha Reddy

Key dates

this monthRegisteredMay 2020First promiseDec 2023Revised toSep 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on15 May 2020
  • Promised completion29 Sep 2024
  • Revised completionRevised to 29 Sep 2024 (originally 29 Dec 2023)
  • Buildings2 building records
  • Documents filed92 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---1580158
B---2690269

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 12 Mar 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 12 Mar 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingNoNot applicable
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationYes-
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
GasNoNot applicable
Water and SanitationNoNot applicable
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area23,774 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 151.80 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAshvin Mathews
EngineerB V Prakesh

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2023 → Sep 2024

No reason recorded in the filing

Complaints filed with RERA Karnataka4

Case no.ComplainantRespondentFiled
01556/2023-Meda Constructions09/10/2023
00482/2026-Meda Constructions07/05/2026
00559/2026-Meda Constructions19/05/2026
00603/2026-Meda Constructions27/05/2026

Documents filed92

As listed on the registration, under the names the promoter filed them with; the newest 80 of 92 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/446/PR/200515/003403 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
ITR 2019-20File: ITR 19-20.pdf12 Mar 2020
Site PlanFile: Site Plan.pdf12 Mar 2020
Section and elevationFile: Section and elevation.pdf12 Mar 2020
Basement PlanFile: Basment Floor Plan.pdf12 Mar 2020
Ground floorFile: Ground Floor.pdf12 Mar 2020
1st FloorFile: First Floor.pdf12 Mar 2020
2nd floorFile: Second floor.pdf12 Mar 2020
10th floorFile: Tenth floor.pdf12 Mar 2020
11th floorFile: 11th floor.pdf12 Mar 2020
14th floorFile: 14th floor.pdf12 Mar 2020
Typical floor 1File: Typical floor 1.pdf12 Mar 2020
Typical floor 2File: Typical floor 2.pdf12 Mar 2020
TerraceFile: Terrace floor.pdf12 Mar 2020
Sanction PlanFile: Site Plan.pdf4 Mar 2020
Bank PassbookFile: Bank Passbook.pdf4 Mar 2020
Balance sheet and P&L with UDINFile: P& L And B. Sheet.pdf4 Mar 2020
RTC for 104/6File: RTC 104-6.pdf4 Mar 2020
EC all sy no from 2004-18File: EC for all sy. no. 2004-18.pdf4 Mar 2020
Plan Sanction LetterFile: Plan Sanction Letter.pdf4 Mar 2020
Typical floor planFile: Typical floor.pdf4 Mar 2020
Basement PlanFile: Basment floor.pdf4 Mar 2020
Ground Floor PlanFile: Ground floor.pdf4 Mar 2020
First Floor PlanFile: 1st floor.pdf4 Mar 2020
Second Floor PlanFile: 2nd floor.pdf4 Mar 2020
CC Meda Heights 1-
Site plan-
Site plan-
Sale Deed - Draft-
Sale Ageement-Meda Heights-
RTC-
Sectonal plan-
Development Plan-
Allotment letter-
mrkr medaheights brochure_06-12-2019-
Meda Project Specs-
EC Meda Heights-
Affidavit-N-
Affidavit Cum Declaration N-
SKMBT_36318010800370-
Deed of Amalgamation 8212-
Unnamed document-
Conversation order-
Unnamed document-
Unnamed document-
Unnamed document-
Relinquishment deed-
Dodkannahalli_Fire_NOC-
Airport NOC-
Bescom NOC-
Unnamed document-
Dodkannahalli_KSPCB_NOC-
SEIAA NOC-
BSNL NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Structural Certificate-
Sectonal plan-
Site plan-
Sectonal plan-
Change of land_reduce (1)-
Legal Report - Meda Heights-
Balance Sheet 2018 - 2019File: 2018-19_reduce.pdf-
Balance Sheet 2017 - 2018File: 2017-18.pdf-
Balance Sheet 2016 - 2017File: 2016-17_reduce (1).pdf-
Audited Profit and Loss Statement 2018 - 2019File: 2018-19.pdf-
Audited Profit and Loss Statement 2017 - 2018File: 2017-18.pdf-
Audited Profit and Loss Statement 2016 - 2017File: 2016-17.pdf-
Director's Report 2018 - 2019File: AZMPM4232X_ITRV 18-19.pdf-
Director's Report 2017 - 2018File: AZMPM4232X_ITRV 17-18.pdf-
Director's Report 2016 - 2017File: 2016-17.pdf-
Cash Flow Statement 2018 - 2019File: 2018-19.pdf-
Cash Flow Statement 2017 - 2018File: 2017-18.pdf-
Auditor's Report 2018 - 2019File: 2018-19.pdf-
Auditor's Report 2017 - 2018File: 2017-18.pdf-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 9 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Meda Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmMeda HeightsOther 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 24 registered projects within 2 km.

Builder: Meda Constructions

Meda Constructions has 1 registration on RERA Karnataka, including Meda Heights. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Meda Heights is delayed beyond 29 Sep 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Meda Heights?

The registered promoter entity is Meda Constructions, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Meda Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Meda Heights?

Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

Who certifies construction progress at Meda Heights?

The professionals named in the filing: Architect: Ashvin Mathews; Engineer: B V Prakesh. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Meda Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Meda Heights. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Meda Heights to a free account