Home / Browse projects / Bengaluru Urban, Karnataka / Meda Greens
Meda Greens
By Meda Greens
RG-KA-18126 · RERA PRM/KA/RERA/1251/310/PR/171015/000831 · Last updated on RERA Karnataka portal: 8 Apr 2021
Source: official RERA Karnataka filing
Red flags
- 7 complaints at RERA Karnataka
- Completion date moved by 21 months
- 2 extensions taken
Clear
- Separate project account declared
Saved.
Meda Greens is a Residential/Group Housing project by Meda Greens in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/171015/000831 on 15 Oct 2017. Possession is promised by 1 Apr 2022. The completion date has moved by 21 months from the original filing. 7 complaints are on record with the regulator.
At a glance
Project
- NameMeda Greens
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/171015/000831
- ReraGenie IDRG-KA-18126
Builder
- NameMeda Greens
- Entity typePartnership Firm
- Authorized SignatoryM Nishanth
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on15 Oct 2017
- Promised completion1 Apr 2022
- Revised completionRevised to 1 Apr 2022 (originally 1 Jul 2020)
- Buildings2 building records
- Documents filed60 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A | - | - | - | 67 | 0 | 67 |
| B and C | - | - | - | 195 | 0 | 195 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 8 Apr 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Retaining wall (All types) | - |
| Plinth level Beam | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| RCC or MS Framed structure | - |
| Masonry construction: Bricks, Concrete blocks etc | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Fire prevention and fire fighting fitting and fixture with network | - |
| Weather Proof work(tile,concrete) | Not applicable |
| Painting | - |
| Elevation work | - |
| Internal and External work including landscapes as per santioned drawings | - |
Progress on shared amenities41
As on 8 Apr 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Internal Roads & Footpaths | Yes | - |
| Sewage and Drainage System | Yes | - |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | Yes | - |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | No | Not applicable |
| Solid waste management and disposal | Yes | - |
| Water conservation | Yes | - |
| Energy management | Yes | - |
| Fire protection and fire safety requirements | No | Not applicable |
| Education/Health/Other public amenities | Yes | - |
| Electricity supply transformer and substation | Yes | - |
| Emergency Evacuation services | Yes | - |
| Storm water drains | Yes | - |
| Use of renewable energy | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | Yes | - |
| Community Hall | Yes | - |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | Yes | - |
| Swimming Pool | Yes | - |
| Gym | Yes | - |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Gas | No | Not applicable |
| Water and Sanitation | Yes | - |
| Air Conditioning And incerntion | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | - |
| Fire escapes | Yes | - |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | Yes | - |
| Open parking areas and common storage spaces | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | - |
Land and ownership
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Manjunath Nayak |
| Engineer | Praveen Kumar Gurrala |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
No reason recorded in the filing
Reason as filed by the promoterForce Majeure
Complaints filed with RERA Karnataka7
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CMP/220124/0008862 | - | Meda Greens | 24/01/2022 |
| CMP/221226/0010518 | - | Meda Greens | 26/12/2022 |
| 00055/2023 | - | Meda Greens | 10/01/2023 |
| 00189/2023 | - | Meda Greens | 09/02/2023 |
| 00071/2024 | - | Meda Greens | 17/01/2024 |
| 01117/2025 | - | Meda Greens | 30/08/2025 |
| 01118/2025 | - | Meda Greens | 30/08/2025 |
Documents filed60
As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/171015/000831 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CA Certificate for fund utilizedFile: Ex3 CA Fund Utilized Certificate.pdf | 8 Apr 2021 |
| CA Certificate for fund requiredFile: Ex4 CA Fund Required Certificate.pdf | 8 Apr 2021 |
| Bank StatementFile: Bank Statement IDBI.pdf | 8 Apr 2021 |
| Bank statementFile: Bank Statement.pdf | 8 Apr 2021 |
| Affidavit as per CircularFile: Affidavit as per circular.pdf | 8 Apr 2021 |
| Affidavit as sec 18(1)File: Affidavit as per sec 18(1).pdf | 8 Apr 2021 |
| RERA approval certificateFile: Rera Approval Certificate.pdf | 8 Apr 2021 |
| Covid extension certificateFile: Rera Covid Extension Certificate.pdf | 8 Apr 2021 |
| CertificateFile: MG Form C.pdf | - |
| Architect Certificate for Work Completion Schedule till DateFile: Form-Ex1 Architect Certificate For Status of Work As On Date.pdf | - |
| Engineer Certificate for Work Completion Schedule till DateFile: Form-Ex5 Engineers Certificate for Status of Work as on date.pdf | - |
| CA Certificate for Funds UtilizationFile: Form-Ex3 Chartered Accountant Certificate For Fund Utilization.pdf | - |
| Architect Certificate for Pending Work Completion Schedule.File: Form-Ex2 Architect Certificate For Pending Work As On Date.pdf | - |
| Engineer Certificate for Pending Work Completion Schedule.File: Form-Ex6 Engineers Certifictae for Pending work as on date.pdf | - |
| CA Certificate for Funds required for Project CompletionFile: Form-Ex4 Chartered Accountant Certificate For Fund Required.pdf | - |
| AffidavitFile: MG RERA EXTENSION FORM B.pdf | - |
| Latest Encumbrance CertificateFile: MG EC 01112019-02032021 LR.pdf | - |
| Relevant Document/sFile: Compensation Letter.pdf | - |
| Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx | - |
| NOC DetailsFile: MG Modified Enivironmental NOC.pdf | - |
| Greens CC | - |
| Meda Greens 7 Floor Approval | - |
| MG Site Plan Approval | - |
| MG Sale Deed RERA | - |
| Sale Agreement Greens RERA | - |
| MG Site Plan Approval | - |
| MG Elevation Approval | - |
| Lelgal Opinion and Title Deed MG Low Res | - |
| Sample Flat Allotment Letter | - |
| MG Brochure | - |
| Fire NOC Greens (8 files merged) | - |
| MEDA GREENS PROJECT SPECIFICATIONS | - |
| Medagreens Lates EC23-Jan-2017 | - |
| Khata Certificate and Extract | - |
| Meda greens JDA | - |
| MG RTC and MR | - |
| Conversion Order | - |
| MG BDA Endorsement NOC | - |
| Fire NOC Greens | - |
| MG Airports NOC | - |
| MG BESCOM NOC | - |
| MG BWSSB Noc | - |
| MG Pollution Board Noc | - |
| MG State Level Environment - Noc | - |
| MG BSNL Noc | - |
| Unnamed document | - |
| MG Eco Consultant Design Stability 050817 | - |
| MG Elevation Approval | - |
| Balance Sheet 2015 - 2016File: MG - BS-FY-2015-16.pdf | - |
| Audited Profit and Loss Statement 2015 - 2016File: MG- P&L-FY-2015-16.pdf | - |
| Cash Flow Statement 2015 - 2016File: MG - BS-FY-2015-16.pdf | - |
| Income Tax Return Acknowledgement 2015 - 2016File: MG-ITR Acknowlegement-FY-2015-16.pdf | - |
| MG-Declaration franking | - |
| Prospectus/BrochureFile: edited_Z Meda Greens Brochure 31032017.pdf | - |
| Advertisement Copy 1File: Advertisement Not Given.docx | - |
| Tower Excel SheetFile: PRM_KA_RERA_1251_310_PR_171015_000831.xlsx | - |
| Occupancy CertificateFile: MG OC.pdf | - |
| Completion certificate issued by the competent authorityFile: MG OC.pdf | - |
| Registered Agreement of SaleFile: Sale Agreement.pdf | - |
| Registered conveyance deed for an individual unitFile: Sale Deed_compressed.pdf | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Meda Greens on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 24 registered projects within 2 km.
Prestige Park Grove
PRESTIGE PROJECTS PRIVATE LIMITED
Prestige Lakeside Habitat
Prestige Habitat Ventures
LivingTree by Kalyani Developers
Kalyani Tech Park Private Limited
PRESTIGE FALCON CITY
PRESTIGE NOTTINGHILL INVESTMENTS
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
GM AMBITIOUS ENCLAVE
M/s. Allam Infinite India Private Limited
See every Bengaluru Urban project, with the district possession charts
Builder: Meda Greens
Meda Greens has 1 registration on RERA Karnataka, including Meda Greens. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Meda Greens is delayed beyond 1 Apr 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Meda Greens?
The registered promoter entity is Meda Greens, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Meda Greens?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Meda Greens?
Each case number above is a complaint filed with RERA Karnataka. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
Who certifies construction progress at Meda Greens?
The professionals named in the filing: Architect: Manjunath Nayak; Engineer: Praveen Kumar Gurrala. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Meda Greens?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback